Attachment 1 - Statement of Work - Dorm Cameras v4 (dated 02 September 2026).pdf
PDF 3 MB Posted
- Solicitation number
- FA442726Q1131
About this file
This is a Statement of Work (SOW) for the removal, disposal, and upgrade of the Travis Air Force Base (Travis AFB) Dormitory surveillance camera system to achieve compliance with Section 889 of the John S. McCain National Defense Authorization Act of 2019 (NDAA), which prohibits covered telecommunications equipment or services.
The project scope encompasses 18 dormitory buildings (1304, 1305, 1308, 1309, 1314, 1315, 1316, 1317, 1331, 1332, 1334, 1350, 1351, 1352, 1353, 1354, 1355, and 1356) and requires the contractor to remove 355 existing non-compliant cameras and install 187 new NDAA/TAA-compliant IP-based cameras (including 57 exterior mounted cameras), along with new CAT 6A cabling, conduits, and supporting infrastructure. The contractor must provide three viewing stations with 55-inch 4K monitors at the Main Dormitory Management Office (Building 1348), the 60 CES IT Office (Building 899), and the 60 CS Network Control Center (Building 243). Critical technical specifications include external cameras with minimum 4K (3840 × 2160) resolution and internal cameras with minimum 5 MP (2592 × 1944) resolution; NVRs capable of 90-day video retention at 30 frames per second; all-weather cameras with day/night and low-light capabilities; FIPS 140-2 rating; AES256 encryption; and minimum 50 MB onboard buffer memory per camera with 128 GB Micro SD cards for edge recording. The contractor must coordinate with the 60 Communications Squadron for equipment approval prior to purchase and must provide new UPS battery backup systems with minimum two-hour runtime support for all buildings. For Buildings 1331 and 1332, the contractor shall provide Cisco Catalyst 9300 48-port PoE+ switches with Network Advantage licensing. All equipment must include a manufacturer's standard warranty of not less than five years from final system acceptance.
Post-warranty maintenance obligations include contractor responsibility for diagnosis, repair, and restoration of all system components with labor covered by contract and replacement parts subject to Government approval (not exceeding $5,000 per incident; contractor authorized procurement up to $3,000 per incident without approval). Preventive maintenance requires semi-annual inspections (minimum) and annual on-site inspections (minimum) including lens cleaning, cable/connector inspection, storage verification, firmware updates, and network performance validation. Corrective maintenance response times are 24 hours for critical failures and 72 hours for non-critical issues. The contractor shall provide comprehensive system training to Dormitory Management Staff, 60 CES ITEC personnel, and 60 CS covering system overview, software navigation, live monitoring, video playback, user account management, troubleshooting, and cybersecurity requirements, with additional refresher training available at no cost during the warranty period. All removed non-compliant equipment must be properly packaged, palletted, and delivered to either the Defense Reutilization and Marketing Office (DRMO) at 291 Hickam Ave, Travis AFB, CA 94535, or DLA Disposition Services Facility at 25600 S. Chrisman Rd, Building 22, Tracy, CA 95304. Hours of operation are 0730–1600 Monday through Friday, excluding federal holidays and Air Mobility Command Family Days. The contract includes an option for the contractor to furnish and install camera systems in newly constructed Dormitory Buildings 1304 and 1305 within the five-year contract period, with pricing determined using the established methodology at the time of option exercise. Technical Exhibit 1 provides campus layout and current/proposed camera positioning; Technical Exhibit 2 lists existing equipment including APC UPS units, network switches, TruVision NVRs, and cameras; Technical Exhibit 3 specifies deliverables including a continuity book (within 30 days of installation), final drawings with conduit and equipment locations, and user training for 15 personnel prior to project completion.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Travis Dormitory Camera
General Information
2 September 2026
1. Description of Services/Introduction: The Contractor will remove and dispose of (355) existing surveillance cameras, associated camera surveillance system equipment and associated non-serviceable cabling over 18 buildings (1304, 1305, 1308, 1309, 1314, 1315, 1316, 1317, 1331, 1332, 1334, 1350, 1351, 1352, 1353, 1354, 1355 and 1356), and install a new NDAA/TAA compliant IP-based camera surveillance system and all associated equipment and peripherals for the previously mentioned buildings; a preferred brand is not required. This will require additional
(187) new surveillance cameras, (57) Exterior mounted and oriented cameras, and new cabling and conduits. Review Technical Exhibit 2 for current equipment listing of what is currently installed at the Travis Air Force Base Dormitory Campus. All associated non-compliant items on equipment listing will be removed and replaced to meet compliance, as well as specifications stated in section 4.
2. Scope:
• Professional Support Services
• Project Management
• Planning (survey, network design)
• Equipment installation and set-up (staging, programming, testing)
3. GENERAL: Provide services for a full removal, disposal, and upgrade of the Travis Air Force
Base (AFB) Dormitory camera surveillance system due to current system non-compliance with Section 889 of the John S. McCain National Defense Authorization Act of 2019 (NDAA), Prohibition on “Covered Telecommunications Equipment or Services” as defined at 48 C.F.R. par.
52.204-25(a).
3.1. The contractor shall provide all personnel, equipment, supplies, facilities, storage, transportation, tools, material, supervision, and other items and non-personnel service necessary to complete this project.
3.2. The Contractor shall install new compliant cameras sufficient to cover all areas listed in Exhibit 1. In addition, the Contractor will construct, provide, and install all support infrastructures by using CAT 6A cabling and including power/electrical outlets necessary to the successful installation and operation of the surveillance monitoring and recording equipment. A preferred cabling vendor is not required.
3.3. Review Technical Exhibit 1 for dormitory layout, current camera position layout and tentatively proposed camera installment locations. The Contractor may recommend different camera positioning based upon new camera capabilities to ensure the best coverage for the dormitories and surrounding campus.
3.4. The Contractor shall configure and adjust Field of Views (FOVs) for all cameras and shall provide three (3) separate Viewing Stations (requirements specified under section 3.5) and three (3) necessary software to allow for optimal viewing/surveillance of the dormitory campus. The software must be accessible from the main Dormitory Management Office (building 1348), the 60 CES Information Technology (IT) Office (building 899) and the 60 CS Network Control Center (building 243).
3.5. The three (3) viewing stations will be located at the following areas:
• Building 1348, Main Dormitory Management Office
• Building 899, 60 CES Information Technology (IT) Office
• Building 243, 60 CS Network Control Center
There will be two (2) 55-inch monitors attached to swivel monitor mounts for Building 1348, Main Dormitory Management Office, one (1) 55-inch monitor attached to swivel monitor mounts for Building 899, 60 CES Information Technology (IT) Office, and one (1) 55-inch monitor attached to swivel monitor mounts for Building 243, 60 CS Network Control Center
Specifications must be in compliance with NDAA (same as all other equipment). 55-inch flat panel monitors to support viewing stations rooms. Display type: LED or LED-backlit LCD flat panel, Resolution: Minimum 3840 X 2160 (4K Ultra HD), Aspect ratio 16:9 widescreen, Refresh rate: minimum 60 Hz. Brightness: minimum 350 nits, viewing angle: minimum 178 degrees horizontal and vertical, contrast ratio minimum 1200:1 or manufacturer equivalent, inputs: minimum 2 HDMI ports and 1 Display port or USB input, mounting capability, standard 110-120V AC, Energy STAR rated or equivalent efficiency standard.
3.6. The 60th Communications Squadron (CS) will need to review and approve all proposed equipment to be utilized in the project prior to purchase to ensure it meets Air Force compliance standards.
3.7. The Contractor shall properly remove and deliver of all previous and inoperable camera components, or other related systems and accessories to either the Defense Reutilization and Marketing Office (DRMO) or DLA Disposition services facility located at the following addresses:
DRMO
291 Hickam Ave, Travis AFB, CA, 94535
(707) 424-0788
DLA Disposition Services Facility 25600 S. Chrisman Rd. Bldg 22 Tracy, CA 95304
3.8. All equipment that shall be turned into DLA will be packaged, sealed, on pallets, tied, and shrink wrapped prior to delivery. Each pallet will have a DD Form 1348- 1A (provided by Dorm Management) attached prior to delivery, to serve as a receipt of delivery to DLA. There will be no loading dock on the dormitory campus, and it is the contractor’s responsibility to load each pallet.
3.9. The Contractor shall be responsible for removing all packaging material, trash, and debris caused as a result of the installation.
3.10. Upon completion of project, the Contractor shall provide system training to the Dormitory Management Staff, the 60 CES ITEC personnel and the 60 CS. Upon completion of training, trained personnel shall, at a minimum, be able to demonstrate their ability to operate as required without Contractor’s assistance. The minimum includes the following:
• System overview, architecture, and capabilities.
• Navigation and operation of the camera management software
• Live monitoring and camera control functions
• Video playback, searching exporting, and evidence retention procedures.
• User account creation, permissions, and role management
• Alarm and event management
• Basic troubleshooting and diagnostics
• Procedures for reporting system faults and requesting warranty/service support
• Preventive maintenance recommendations and best practices
• Review of cybersecurity and password management requirements, as applicable
The contractor shall:
• Provide both administrator-level and end-user training
• Furnish all training materials in electronic format (PDF or equivalent), including user guides, quick reference guides, and system manuals
• Conduct training either on-site or virtually, as approved by the COR
• Allow sufficient time for questions and hands-on instruction using the installed system
• Provide additional refresher training at no additional cost during the warranty period, if requested by the Government.
3.11. Existing conduit pathways may be utilized where verified to be serviceable and compliant with project requirements, including confirmation that no prohibited or non-compliant components are present. Existing cabling may consist of CAT6;
however, all new cabling installed under this project will be CAT6A. Due to the larger diameter and conduit fill requirements of CAT6A cables, existing conduits shall be evaluated for adequate capacity, as some pathways may be too congested to accommodate the new cable quantities. Where existing conduit is undersized, inaccessible, or otherwise unsuitable, new or replacement conduit, including surface-mounted conduit or raceway where in-wall pathways cannot be modified, shall be provided as required. There are no restrictions on drilling/penetrations for new conduits in dorm walls. New conduits installed must be painted to match the buildings’ existing color.
3.12. Post installation service response time will match what is in the standard warranty of not less than five (5) years from the date of final system acceptance by the Government.
3.13. Conduit will be painted to match color of building.
3.14. CAT 6A cabling and outlets must be used for camera system.
3.15. Height of the cameras to be at the height necessary to provide optimal viewing/surveillance of the intended Field of View (FOV).
3.16. IDFs for buildings 1304, 1305, 1308, 1309, 1334, 1350, 1351, 1352, 1353, 1354, 1355, and 1356 are located on the 2nd floor of each building IDFs for buildings 1331 and 1332 will be located on the 1st, 2nd, and 3rd floors. All IDFs for buildings 1314, 1315, and 1316 are located inside building 1317.
3.17. For outdoor cameras (parking lots, yards, etc.) they will be elevated on the second and third floor at standard mounting height.
4. Camera System Specifications:
4.1. The contractor shall meet or exceed the following equipment specifications also provide all additional equipment and parts needed.
• Cameras must have all-weather capability to withstand local temperature. All cameras shall have a combination of day/night and low light (non-thermal) capabilities. In addition, the cameras shall, at a minimum, start recording upon detection of any motion.
• All cameras should be FIPS 140-2 (adn 140-3 with 140-2 becomes EOL) rated.
• Connecting hardware shall be rated for operation under ambient conditions of 32 to 140 degrees F and in the range of 0 to 95 percent relative humidity, noncondensing.
• External cameras shall support a minimum resolution of 4K (3840 × 2160), and internal cameras shall support a minimum resolution of 5 MP (2592 × 1944), with support for continuous and event-based recording at a minimum of 24 frames per second.
• NVR must be capable of retaining video for 90 days and record at 30 frames per second with a compressed video file, with viewing and recording time lapse and event recording based on human movement at 2592x1944 5 MP or higher per camera at minimum.
• Recorder rate must be at least 5MP @ 5 IPS time lapse high quality and event/motion/human detection/line-crossing recording 15 IPS or higher at excellent quality
• The contractor shall utilize existing POE switches, except for buildings 1331 and 1332. For buildings 1331 and 1332, the contractor shall provide the necessary Cisco Catalyst 9300 48-port PoE+, Network Advantage to make the project/system functional. The Contractor shall contact the 60 CS to determine the appropriate POE switch model to purchase and coordinate the correct specifications of the existing PoE switches when installing the system.
• All cameras are to have the following: a minimum 50MB onboard buffer memory built into the camera motherboard, a minimum 128GB Micro SD card for secondary smart failover at camera edge recording, IR night vision capabilities, encrypted at AES256, DirectIP/Encryption communication protocol.
• Each NVR System must have expandability for future back-up, redundant recording, streaming, full remote admin, remotely over military network with end-2-end AES256 encryption. System must be able to view and control live feed of cameras from client software on all AFB workstations with proper login and password to be provided by Dorm Management and other associated entities.
• Standard warranty is provided to customers following camera system installation
• Each building and associated IDF supporting existing and newly installed surveillance cameras shall be provided with new TAA-compliant UPS battery backup systems properly sized to support both installed and newly deployed PoE network switches, and connected camera infrastructure. UPS systems shall provide a minimum of two (2) hours of backup runtime for surveillance operations and shall consist of new equipment, not reused from any existing system.
• The Contractor shall utilize existing PoE network switches where serviceable to support both existing and newly installed surveillance devices. Where required to maintain system functionality or capacity, including Buildings 1331 and 1332. The Contractor shall provide Cisco Catalyst 9300 Series 48-port PoE+ switches with Network Advantage licensing and required support services, or approved equal, compliant with TAA requirements. The Contractor shall coordinate with 60 CS to verify compatibility, capacity, licensing, and configuration requirements of the existing network environment prior to procurement and installation.
• The Contractor (Prime or Subcontractor) shall maintain qualified network engineering personnel capable of enterprise switch deployment, configuration, and integration within an operational government network environment and shall have at least one Cisco Certified Internetwork Expert (CCIE) on staff. Installation and configuration activities shall be performed by certified personnel with Cisco Certified Network Associate (CCNA) level or higher credentials, with CCIE-level engineering support available for system design, validation, and escalation. All PoE switches shall be delivered to the 60 CS for configuration and deployment. Prime or subcontractor will not configure the switch.
• The Contractor shall provide and ensure that all installed camera system components
(including cameras, mounts, cabling, nNVRs, ervers, and associated infrastructure) are covered by a manufactures standard warranty of not less than five (5) years from the date of final system acceptance by the Government.
• The system shall provide enough usable video storage after RAID/redundancy, sufficient to maintain 90 days of retention for 213 5-MP interior cameras and 57 4K exterior cameras under the specified 5 IPS continuous/time-lapse and minimum 15 IPS event recoding profile.
• There is 5 ft X 4 ft X 8 ft tall area that can be utilized as a storage space.
5. Post Warranty Failure and Repair Requirements:
5.1. Upon expiration of manufacturer warranty coverage, the contractor shall assume responsibility for diagnosis, repair, and restoration of all systems components under this contract. This includes cameras, cabling, mounts, NVRs, and associated infrastructure.
5.2. The Contractor shall guarantee system operability regardless of warranty status to ensure no lapse in maintenance support due to expired manufacturer warranties.
5.3. Labor covered, parts separate: The Contractor shall provide troubleshooting and labor under contract. Replacement parts require Government approval and funding, not to exceed (NTE) $5,000 per incident. The Contractor is authorized to procure parts necessary to restore system functionality up to a NTE amount of $3,000 per incident without Government approval.
5.4. Preventive Maintenance (PM): The Contractor shall perform routine maintenance to sustain optimal system performance and extend equipment lifespan.
5.5. A semi-annual inspection (at minimum) to perform the following tasks:
• Visually inspect all cameras and their field of view
• Cleaning and alignment adjustments
• Quick systems health verification
• Systems diagnostics (for remote monitoring)
• Offline camera alerts (for remote monitoring)
• Storage/recording verification (for remote monitoring)
5.6. An annual on-site inspection (at minimum) to perform the following tasks:
• Full inspection of all cameras and infrastructure
• All major preventive maintenance tasks outlined in section 5.7
5.7. Preventive maintenance tasks include:
• Cleaning all camera lenses, housing, and enclosures
• Inspecting and adjusting camera angles focus, and field of view
• Verifying image clarity (day/night functionality)
• Checking and testing all cabling, connectors, and power supplies
• Inspecting mounting hardware for stability and signs of wear, corrosion, or tampering
• Testing recording functionality on all NVRs and storage systems
• Verifying proper date/time synchronization across the system
• Conducting firmware/software updates as approved by the Government
• Validating network connectivity and bandwidth performance
• Identifying and reporting any degraded or failing components
6. Corrective Maintenance (On-Call Repairs): The Contractor shall provide unscheduled maintenance to restore system functionality in the event of failures or performance degradation.
6.1. Response Times: For critical failures (system-wide or high-priority camera outage), a response and resolution is expected within 24 hours unless otherwise agreed upon between the Contractor and the COR. For non-critical issues, response and resolution is expected within 72 hours unless otherwise agreed upon between the Contractor and the COR.
6.2. Corrective Maintenance Tasks include the following:
• Troubleshooting and repairing inoperable cameras, or camera components.
• Replacing defective parts with Government approved equivalents
• Restoring connectivity and recording capability
• Reconfiguring system settings as required
7. Recognized Holidays: The contractor will not perform any services on the following Holidays, or the accompanying Air Mobility Command Family Days listed below:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Independence Day
Christmas Day
8. Hours of Operation: The contractor is responsible for conducting business between the hours of
0730-1600 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Military exercises, inclement conditions caused by Mother Earth, civil unrest resulting in base closure, etc. are considered inherent government delays. The Contractor will be notified as soon as possible if any delays are anticipated.
8.1. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
9. Place of Performance: The work to be performed under this contract will be performed at the
Travis AFB Dormitory Campus, 60 CES IT office (building 899) and the 60th Communications Squadron (building 243).
10. Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
11. Post Award Conference/Periodic Progress Meetings: Progress meetings will occur with the contract manager and/or alternate at a minimum of once a month with a minimum of one hour OR on an as needed basis. Meetings are to discuss progress, conflicts, recommendations, etc.
12. PHASE IN /PHASE OUT PERIOD: Dorm Management will determine the order in which buildings the installation/removal will occur. Installation/removal will occur by building based on the availability of funds.
PART 2
TECHNICAL EXHIBIT LISTING
11. TECHNICAL EXHIBIT LIST:
11.1. Technical Exhibit 1 – Travis Dormitory Campus Layout (Campus Map, Exterior Field of Vision/Coverage Required and Current/Proposed Camera Layout). NOTE: As-built drawings will be made available to the offeror.
11.2. Technical Exhibit 2 – Current equipment List
11.3. Technical Exhibit 3 – Deliverables Schedule
TECHNICAL EXHIBIT 1
Travis Dormitory Campus Layout
Exterior Field of Vision/Coverage Required -
D = Field of Vision Requested
Proposed New External Camera
31! 310
3().1 •
NORTH
!14 ill
3:.0
3!5 3'3 Jll 319 315
313 305
C:
.I
1'3 )0, 107 106
1:.0
106 I 108
3"' ..114
-111 214 211 -110
STORAGE
I 2••
_111. 2ll
NORTH ••
211.
AUNOR',
I
3RDFLOOR
STORAGE
STIJD\"
3U ..111.
ill w
DA\'ROOM
..181
I lSTFLOOR
_101
-104 orncr
Building 1308 - Current/Proposed Camera Layout
I 11• .111. _lU
LOOR
111 .lll. 114
Existing Camera= 32 Proposed Additional New Camera= 14 Field of View Direction
Building 1309 - Current/Proposed Camera Layout
!O:? ,... '°' ,..
!10 :?I!
"cl'
�: ' . l 2 ffiFLOOR � ."F.". :'.l ill :01 ,ro , !07 '°' :n ""' i � ee:
ill
4.
Existing Camera= 27 Proposed Additional New Camera= 15 Field of View Direction
O.\\'ROOM
Building 1314 - Current/Proposed Camera Layout z z
• Existing Camera= 12
• Proposed Additional New Camera= 0 t Field of View Direction
Ill
104 A 103 A t 102 A 101 A
104B 101B
103B
104 C 1040 1030 103 C 102 C 102 0 101 C
301 C 3010 3020 302C 303C 3030 3040 304C
Hall itch•nllivin itch•nllivin
301 302 ' Hall Hall itch•nllivin
Kitch•nllivin
Hall 301 B 302B 303B 304B
301 A 302A 303A Ill 304 A
STEPS
STEPS
C 1010 1020 102 C 103 C 1030 1040 104 C
103 A
104 A
201 A
Hiill
Hiill Hiill
Hiill
Building 1315 - Current/Proposed Camera Layout
201 C 2010
Existing Camera= 12 Proposed Additional New Camera= 0 Field of View Direction •
Existing Camera = 13 Proposed Additional New Camera= 0
I Field of View Direction
Telecommunications Room (TR)
Bldg. 1318
(Main Hub / TR) Connects to Bldg.
1316 and 1317 via fiber. NVRs stored here.
Tcom
Existing Camera = 34 Proposed Additional New Camera = 13
Existing Camera= 33 Proposed Additional New Camera= 13 i Field of View Direction
3:?1 3!3
:?l:?
I� M +, n
IA �+
!'<ORTH
I
221 :?19
:?11 :?09 :?03 :?01
:?14
:?10 :?08
3� iJ
111 109 107 105 103 101
,,/' .,I •
STAIRS <n •
21"-U FLOOR
STAIRS "'
208 207 206 205
.<...n.
Building 1351 - Current/Proposed Camera Layout
."..' � ::1
Existing Camera= 33 Proposed Additional New Camera= 14
Building 1352 - Current/Proposed Camera Layout
Existing Camera= 27 Proposed Additional New Camera= 12 Field of View Direction
220 219 218 217 216 215
KITCHEN
1:::
STAIRS
ELEC
• 101 102 I 103 104 a
• STAIRS • 109 110 111 I 112 113 114
I lSTFLOOR t:, i::::
• i;: ·<>
� I ,1, ig::i I lSTFLOOR
105 106 107 108 ,_, ig::i
ILULWAY
ELEC
115 116 117 118 119 120 orncr •
STAIRS -o
300 30:? 306 308
303 305 307 309 311
JU 316 318 3!0
,, "I"''
315 319 3:?l 323
106 108 110 u: 114 118 120 I:?!
107 109 111 113 117 119 1:1
}Hi 1!3
306 308
• 324
"I"''
214 •...,, 224 6 t
217 219 221 223 225 227 229 231
• 120 122 r m
Building 1353 - Current/Proposed Camera Layout
10-l I lSTFLO
Existing Camera = 26 Proposed Additional New Camera= 12
Building 1354 - Current/Proposed Camera Layout
Existing Camera = 28 Proposed Additional New Camera= 11 Field of View Direction
� 301 303 305 307 309
200 202 204 206I 2.iDFLO
OR
� 201 203 205 207 209
.V., .. i 100 102 104 106 lST
�R
101 103 105 109
211 213 215
A
,I.",' n
NO
t i:l rg
RTH
::l
0 �
111 113 115 , :'.;
200 206 :os :?16 :?18 ::o to "'"
"' i "6'
:01 203 205 !07
:ns !17 i
+q, :?!I :?!3
225 .,"..
221 I 220
321 I 320
302 303 304 305 306 307
324 323 322 329
NORTH •
I:
107 108 m
132 I 131 130 129 I 128 127 126 125
4 223 222
209 210 2ll 212 213
X•ORTH
--l
229 I 22-8
,1•;;:
2n m
Building 1355 - Current/Proposed Camera Layout
319 318 317
314 315 316
Existing Camera= 38 Proposed Additional New Camera= 2
Building 1356 - Current/Proposed Camera Layout
332 331 330 329 I 328
V>
3RDFL
OOR
� 301 302 303 304 305
Existing Camera= 40 Proposed Additional New Camera= 3 Field of View Direction
209 210 2ll
124 123 122
109 no Ill
227 22-6 225
206 207 208
214 215 216 l
TECHNICAL EXHIBIT 3
Current Equipment List
PartNum Name Manu Num Description Quantity
APC SMART UPS APC APC SMART UPS APC Smart-UPS 15.00
750VA 750VA X 750VA
Rack/Tower LCD 120V
APC
SmartUPS,600 Watts /750 VA,Input 120V /Output 120V, Interface Port SmartSlot, USB, Extended runtime model, Rack Height 2 U
AR2480 APC AR2480 NetShelter SV 42U 800mm Wide x 1060mm Deep Enclosure with Sides Black
1.00
APC UPS 2200 AV-
RM
Anixter APC UPS 2200 AV-
RM
APC Smart-UPS
2200 VA RM 2U
3.00
ERF-17N-USB Anixter ERF-17N-USB Eclipse ERF-17N- USB Rack Mount
USB
Monitor/Keyboard
1.00
SBX-7 Anixter SBX-7 SBX Series Rack, SBX-7
15.00
NS3702-24P-4S Lenel NS3702-24P-4S 24 Port Gigabit Ethernet and 4 Gigabit SFP Ports, PoE+ and L3 Routing
28.00
S30-2SLC-10 Lenel S30-2SLC-10 SFP-Port Gigabit 2 Fiber Mini GBIC Module SM 1310Nm - 10km
56.00
SW-TRUVIS-CH8 Lenel SW-TRUVIS-CH8 TruVision Channel License for when adding a TruVision recorder into OnGuard . Sold as an 8 pack.
53.00
SWS-DV Lenel SWS-DV OnGuard Video Security Server Software License on CD – include this part number if you want standalone video system. Includes OnGuard digital video server software license, system administration for video, communication server for video, alarm monitoring for video, a single OnGuard digital video client license, flexnet softkey and first year support plan
SUSP-W-VO.
(USE
CONFIGURATIO
N #3D)
3.00
TVD-3203 Lenel TVD-3203 TruVision IP outdoor dome camera, 1.3mpx , 2.8~12mm motor lens, wdr, true d/n, 30m ir, alarm, sd/shdc slot, intelligence, poe (803.af) /24vac, heater, IP66, ik10, ntsc, Onboard analytics not presently
416.00 supported on OnGuard or Prism
TVD-3205 Lenel TVD-3205 TruVision IP outdoor dome camera, 3.0mpx , 8~32mm motor lens, wdr, true d/n, 50m ir, alarm, sd/shdc slot, intelligence, poe (803.af) /24vac, heater, IP66, ik10, ntsc, Onboard analytics not presently
13.00 supported on
OnGuard or Prism
TVN-2132P-12T Lenel TVN-2132P-12T TruVision NVR 21P; 32 channel IP high performance network video recorder with 8 HDD bays for extended storage; 12TB storage; with power cord
[DOES NOT
integrate GoEntry] [Will integrate with TruPortal 1.5
14.00 and OnGuard 2013 Add-on]
FIBER MATERIAL
FROM
Windy City Wire 08/2011
FIBER MATERIAL
FROM
1.00
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Continuity Book to include:
1. How to operate and perform all functions of the system.
2. Final drawing showing the building floor plan with conduit runs, rack elevations, locations of the control monitors, switches,VMSs, UPS, and individual cameras. 3.
Make/model and serial number of each item in the system and any manufacturer provided
Within 30 days after installation
2 (1 for Dorm Office and 1 for
CE ITEC)
Hard and soft copy
60 CES
Dormitory Office instruction manuals
User Training Prior to project completion
15 Personnel In person training 60 CES Dormitory Office
PART 3
OPTION TO INSTALL CAMERAS IN FUTURE CONSTRUCTED FACILITIES
12. BACKGROUND: Dormitory buildings 1304 and 1305 are scheduled for demolition with a projected completion date in 2027 and, as such, do not require camera installation at the time on initial contract performance if award occurs prior to that date.
13. OPTION SCOPE: The Government hereby grants the Contractor the exclusive right and option to furnish and install security camera systems in the newly constructed Dormitory Buildings 1304 and 1305, provided such installation occurs within the five-year contract period, inclusive of the one (1) base option year, resulting from this contract award.
14. OPTION EXERCISE: Exercise of this option shall be at the sole discretion of the Government and subject to the availability of funds, completion and acceptance of construction, and satisfactory performance by the Contractor. The Government shall provide written notice of its intent to exercise this option within a reasonable timeframe following substantial completion of the new facilities.
15. PERFORMANCE REQUIREMENTS: All work performed under this option shall comply with the technical, security, and performance requirements outlined elsewhere in this PWS and shall be executed under the same terms and conditions as the base contract unless otherwise modified by bilateral agreement.
16. PRICING: Pricing for this option shall be in accordance with the pricing methodology established in this contract and finalized at the time the option is exercised, unless otherwise specified.
| z |
| z |