As-Builts.pdf

PDF 138 MB Posted

Attached to
Travis AFB - Starbucks HVAC Air Handler Replacement - Amendment 02
Solicitation number
FA442726Q1070
Issued by

About this file

This is an as-built documentation file for the HVAC Air Handler Replacement project at Travis Air Force Base. The file contains visual and technical records of the existing Carrier air handler unit with an estimated 3,500 CFM capacity that requires replacement. As-built drawings document the current system configuration, including ductwork connections, electrical requirements, and spatial constraints within Building 549 at 350 Hangar Avenue, Travis AFB, CA 94535. These as-built records serve as baseline documentation for contractors responding to solicitation FA442726Q1070 to understand the existing infrastructure and removal scope prior to installation of the new air handling unit.

Contractors must submit responses to the 60th Civil Engineer Squadron no later than 22 June 2026 at 12:00 PM PDT (per Amendment 02). The project requires complete removal and replacement of the existing unit with all necessary labor, equipment, tools, materials, and supervision provided by the selected contractor. A mandatory site visit was scheduled for 21 May 2026 at 10:00 AM PDT, and questions regarding the solicitation had a deadline of 27 May 2026 at 4:00 PM PDT. Responses should be directed to john_rexter.de_pedro@us.af.mil and nadine.umunyana.1@us.af.mil.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .