Repair Pest Damage RFI Responses.pdf

PDF 4 MB Posted

Attached to
PKA - Repair Pest Damage L/H/S Amendment 03
Solicitation number
FA442725R0013
Issued by

About this file

The image is an Adobe PDF portfolio launch screen, advising users to open the document in Acrobat X or Adobe Reader X, or later versions. The screen displays the Adobe PDF logo, a red and white document icon, and a "Get Adobe Reader Now!" button. This appears to be a standard landing page for PDF portfolio documents, providing instructions for optimal viewing.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

Today’s Date:

From:

References:

RFI #:

To:

Response

Signature: Date:

Information Requested:

Location & Limits:

Description:

RFI

ValerieTafoya

Text Box

1)Will the Pest Control “closing of openings” require matching of surrounding finishes? i.e. stucco, siding, carpentry, roofing, etc.

2)Other than lighting, HVAC, FLS and Fire Sprinklers, are there any other sensors to be remounted?

3)If fire sprinkler and FLS devices are to be remounted , please provide the manufacturer of the Fire Alarm system for the building.

4)On the walk it was noted that the access doors through the hard ceilings were either damaged or unsightly. Are we to include new replacement access doors?

5)A good number of florescent lights were not providing light. Are we to include replacement of burnt-out bulbs?

6)The scope calls for the replacement of registers. Does this include the hard ceiling diffusers and grilles?

7)Is the new grid to match the existing grids elevation?

8)Will the 900 SQFT for the CDC library need to be relocated to an office trailer or is a shipping container sufficient?

9)Please clarify the 4” ducting tying the system together. The as built plans do not show it.

10)May the entrance side of B380B be used and closed off for the lay-down yard?

11)Is location of the roof leak to be included in the scope?

12)Is the existing ceiling fan to be reinstalled?

13)When removing the HVAC t bar grilles, is the flexible ducting back to the branch to be removed as well?

14)As the suite has had a pest issue, should duct cleaning of the HVAC system be included?

ValerieTafoya

RFI 001-PKA - Repair Pest Damage-GISHEA-SH Mechanical Inc.

1622413821C

1) Yes, the material finish has to match the surrounding. Please refer to Travis Facilities Excellence Guide 2008, page 35 (37 of 46). See attached.

2) Please refer to Scope of Work (SOW) 2.1.1 All other ceiling mounted appurtenances shall be protected and remain and 2.31 Contractor will be responsible for remounting ceiling appurtenances. Any affected appurtenances i.e. FAs, smoke duct detectors, and etc.

3) This has to be field verified by the KTR.

4) If ceiling access panels are broken, please include in the RFP.

5) Not part of the SOW.

6) Yes, refer to SOW 2.1.1 "Contractor to perform demolition and abatement of suspended acoustical ceiling and partial gypsum board ceiling for all of the first floor of building 380B a total of 8,216 SF". If the partial gyp ceiling has register and return, then it has be replace.

7) Yes, match the existing ceiling height.

8) The Occupant staff has to have access to the temp storage for the CDC learning library.

9) Please elaborate what tying clarification is needed for 4" ducting? Please provide sketch or plan showing that 4" ducting.

10) Please include in the submission of laydown area request form.

11) No, the roof leaked is part of the roof warranty. If found, please coordinate with Base CE.

12) Yes, the existing fan is part of the appurtenances and need to be re-installed.

13) This is part of KTR means and method. KTR have to determine the viability if removal of flex duct is needed or not.

14) If the HVAC ducting shows animal hazardous waste contamination on the abatement, please do include cleaning or sanitation.

RFI Date: 04/02/2025

RFI Number: 001

From:

To: COR

Informaton Requested: Request for Information

Descripton:

Locaton and Limits:

References:

Date: 04/02/2025

RFIs FA442725R0013 – B380 Repair Pest Damage L/H/S

New changes will be included and referenced in the SOW dated 15 April 2025.

1. Is a Change Order anticipated and are funds available to expedite an award? Or should our bid include anticipation of trapping and eradication of pests so there is no delay on beginning demolition?

2. How many points of entry have been previously detected and sealed?

3. There are many more than 22 air supply diffusers and 22 return air diffusers. Who determines which drops are demolished and replaced? Have the damaged locations been identified? Will Contractor receive a building drawing with these locations called out?

4. Per RFP 01 35 2, 1.7.1.2: "The Contractor Quality Control Manager cannot be the SSHO on this project". Per RFP 01 00 00, 1.22: "The contractor shall provide a full-time construction superintendent IAW FAR 52.236-6 Superintendence by the Contractor at all times during the period of construction". Is it acceptable to provide a one position triple hat that serves as Quality Control Manager/SSHO/Superintendent?

5. Per the RFP "If contractor requires occupants to vacate the building while construction is being completed, contractor will need to provide temporary office spaces for 5 occupants as well as on site temporary storage for CDC’s learning library which is equivalent to 900 square feet", during the 03/31/25 site walk, it was noted from discussions with staff members that approximately 8 people occupy the building—7 during the day and 1 at night. Can you please confirm whether the requirement for temporary office space for 5 occupants is accurate, or if it will be updated?

6. Per the RFP "If contractor requires occupants to vacate the building while construction is being completed, contractor will need to provide ....on site temporary storage for CDC’s learning library which is equivalent to 900 square feet", based on the 03/31/25 site walk, would it be acceptable to keep the CDC library items within the building—relocating them as needed during phased construction and demolition—in order to avoid using off-site storage?

7. Trailer Requirements for Relocation of staff members:

a. Are there any specific specifications or standards required for the type of temporary trailer to be provided for staff use?

b. Is there a minimum square footage requirement for the staff relocation trailer?

c. Would a construction trailer equipped with two separate restrooms

(male/female) be considered acceptable?

d. Is the use of a Starlink satellite connection acceptable for providing internet access to support computer and desk operations within the staff relocation trailer?

8. Per the RFP 60 CES Requirements, section D30 HVAC states: "HVAC System Renovation – For any renovation of existing HVAC systems the HVAC design shall include design values for all equipment including existing equipment. If the system will connect to existing ductwork serving other areas of the facility the airflow requirements at all terminals units shall be provided in the design drawings to ensure that a proper TAB can be performed on the system. All equipment, ductwork, etc. connected to new or modified equipment as well as any distribution systems that serve the same areas as new or modified equipment will be part of the project scope." Contractor is not modifying any ductwork at all, per the scope of work, only flexible ducting back to existing duct is required.

a. Is a mechanical design with design values required?

b. Is Testing and Balancing and Commissioning going to be required?

Gov’t Responses:

1. Please refer to SOW section 1.1. As part of the base bid the Ktr will perform abatement of hazardous waste from animal waste in addition to professional pest control to close any openings both from the exterior of the building as well as between sections “A” and “B” of the building to prevent further infestation of racoons. Also refer to 2.2 Provide Pest Control service. Based on the finding, there should be a recommendation from the professional pest control.

2. Contractor has to field verify and defer to the 2.2.1 Pest Service control service, “close up all openings that are providing entry into building 380B.”

3. Please refer to SOW section 2.3.1 for the quantities.

4. No triple hat is allowed in Travis AFB. Although a dual hat might be considered for

Superintendent/ SSHO but subject to CO approval.

5. 8 staff was discussed and confirmed, please use the updated staff occupants.

6. The SOW requires a temporary storage.

7. Trailer Requirements:

a. The space configuration should be identical to the staff occupant.

b. The space area should be identical to the staff occupant. Minimum 36 SF/admin staff for an open space configuration.

c. All gender restroom would be acceptable.

d. Include temporary commercial internet for the dislocated staff. Also, if the staff needs a secured connection, the end-user has to coordinate with the Davis Grant Hospital IT for the temporary secured internet connection.

8. Per the RFP 60 CES Requirements, section D30 HVAC states: "HVAC System Renovation:

a. “Not applicable”.

b. “Not applicable”.