This solicitation seeks proposals to renovate restrooms, offices, and warehouse spaces within Building 977 at Travis Air Force Base per design documents. Required work includes architectural, mechanical, electrical, plumbing, and fire protection services to provide code-compliant spaces suitable for supporting freight terminal operations. Specific measures are also required to improve thermal comfort and safety in the warehouse and Shop 112. The solicitation was issued by the Department of the Air Force Air Mobility Command.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1
Prepared By:
Repair Air Freight Terminal B977 Final Submittal – Design Analysis Travis Air Force Base, California
Prepared For:
Travis Air Force Base
Delivery Order No. DO FA442718F0087 30 April 2019
TranSystems Project No. P50180017
TranSystems 2000 Center Street Suite 303 Berkeley, CA 94704 Tel 510.835.2761 Fax 510.835.9839 www.transystems.com
This Page is Intentionally Blank
Table of Contents
I. INTRODUCTION
II. EXISTING CONDITIONS
III. ARCHITECTURAL REQUIREMENTS
CODE AND DESIGN CRITERIA
EXISTING CONDITIONS
DEMOLITION
PROPOSED WORK
IV. MECHANICAL REQUIREMENTS
CODE AND DESIGN CRITERIA
DEMOLITION
PROPOSED WORK
V. PLUMBING REQUIREMENTS
CODE AND DESIGN CRITERIA
DEMOLITION
PROPOSED WORK
VI. ELECTRICAL REQUIREMENTS
CODE AND DESIGN CRITERIA
EXISTING CONDITIONS
DEMOLITION
PROPOSED WORK
VII. FIRE PROTECTION AND LIFE SAFETY REQUIREMENTS
CODE AND DESIGN CRITERIA
INTRODUCTION
PROJECT DESCRIPTION
BUILDING AND LIFE SAFETY CODE ANALYSIS
MEANS OF EGRESS ANALYSIS
FIRE DEPARTMENT ACCESS
FIRE SUPPRESSION SYSTEMS
FIRE ALARM/MASS NOTIFICATION AND DETECTION
APPENDIX B – PHOTOMETRIC CALCULATIONS
APPENDIX H – MECHANICAL CALCULATIONS
Page | 1
Final Submittal
Page | 2
Page | 3
I. Introduction
The objective of this project is to provide the design for the renovation of the first floor office restrooms, the customer service office, and the warehouse restrooms, within Building 977 at Travis Air Force Base. The building, which houses the base’s Air Freight Terminal, was constructed in the late 1960’s and early 1970’s, and although it’s undergone a variety of small renovations since that time, many spaces within the building remain outdated and insufficiently equipped to serve the current mission. These renovations include the architectural, mechanical, electrical, plumbing, and fire protection services necessary to provide the code-compliant spaces required by the Scope of Work suitable for supporting the current mission. These renovations focus primarily on upgrading the user comfort within these spaces, including finishes and temperature control, and ensuring that the renovated spaces meet all applicable criteria. In addition to the renovations mentioned, the Scope of Work also includes specific measures to improve the thermal comfort and safety of personnel working within the warehouse area of the freight terminal, as well as Shop 112.
II. Existing Conditions
Opened for operations in the early 1970’s, Building 977 has been in continuous operation for nearly 50 years, serving as a primary terminal for air freight traveling to, from, and through the western United States. The warehouse side of the facility is a 100,000 square-foot steel framed structure clad with metal wall panels and low-sloped roof. To the east, south, and west of the enclosed warehouse are additional open-air steel structures providing shelter for other terminal operations. The office portion of the building, which is a CMU structure to the north of the warehouse, encloses approximately 40,000 square feet of mixed office and shop space. The building sits near the northwest corner of the flightline, adjacent to the South Gate off Peterson Road.
The first floor office restrooms most recently had their fixtures and accessories upgraded within the last ten years, but the finishes haven’t been upgraded in several decades, and have fallen into dis-repair. Additionally, none of the restrooms throughout the building are currently accessible by ABA Standards. The access corridor which connects the men’s restroom to the warehouse floor has also suffered extensive wear and tear over the years, resulting in damaged finishes, insufficient lighting, and a lack of fire alarm signaling, all of which are to be addressed through this project.
The warehouse area is served by an additional set of male and female restrooms on the east side of the facility which are in similar condition, and need similar repairs, as the office restrooms referenced above. Although these restrooms are not UFAS compliant either, there are additional barriers which make these harder to upgrade than the office restrooms, and since all occupants with access to the warehouse restrooms have equal access to the office restrooms, the authority having jurisdiction at Travis AFB has determined that these restrooms do not need to be made UFAS compliant as part of this project. As a result, this part has been omitted from this Scope of Work.
Like the office restrooms, the customer service office, which houses the transport operations and scheduling team, has outdated finishes and furnishings in need of upgrade. Additionally, the mission for this space has evolved over the years, rendering the currently layout insufficient.
A concrete vault has been repurposed as a break room, without the provision of plumbing for a
Page | 4 sink or appliances, or the installation of the customary furnishings. A large closet has been constructed in the corner of the space to house a telecom rack, but without any HVAC service to the office, this closet is underserved.
The warehouse floor itself is a large cavernous space with several roll-up doors to the exterior.
Over the years, the use of diesel powered fork-lifts has worn off the traffic striping on the warehouse floor, and discolored the insulation panels lining the walls. Over time, these insulation panels have come dislodged one by one, and have begun to fall to the warehouse floor, causing a safety concern for occupants and reducing the thermal insulation against the hot summer and cold winter temperatures. Adding to the issue of thermal comfort, the gas-fired heaters installed to warm the space in the winter are old enough that they can no longer be easily serviced, and their rate of failure increases with every year.
Page | 5
III. Architectural Requirements
Code and Design Criteria
National Material Standards: ASTM and ANSI National Safety Standards: OSHA, NFPA, and UL International Building Code (2015) and California Building Code (2016) Whole Building Design Guide (WBDG) UFC 1-200-01, General Building Requirements (With Change 2) July 2013 UFC 3-101-01, Architecture Unified Facilities Guide Specifications (UFGS) Uniform Federal Accessibility Standard (UFAS) OL Occupational Safety and Health Standards EPA Code of Federal Regulations Facilities Excellence Guide (FEG), Travis AFB, 2008
Existing Conditions
As discussed in Section II, the existing finishes throughout the areas referenced are in various states of disrepair, making these spaces unpleasant, uncomfortable, and in some cases, unsafe to use. The renovations included in this project focus on enhancing user comfort and safety to make the freight terminal a more desirable place to work.
Demolition
First Floor Office Men’s Restroom and Rear Access Corridor:
All existing plumbing, electrical, and fire alarm fixtures and accessories will be removed and salvaged for re-use as appropriate. All floor, wall, and ceiling finishes, including the tile, gypsum board, and t-bar ceiling, as well as all counters, doors, and door frames will be removed and recycled as appropriate. All toilet partitions, lockers, benches, and chairs will be removed and recycled as appropriate. Finally, the main entrance from the corridor, the northern end of the lavatory and urinal walls, and the chase wall at the rear access door will be demolished to create space for accessible paths of egress.
First Floor Office Women’s Restroom:
All existing plumbing, electrical, and fire alarm fixtures and accessories will be removed and salvaged for re-use as appropriate. All floor, wall, and ceiling finishes, including the tile, gypsum board, and t-bar ceiling, as well as all counters, doors, and door frames will be removed and recycled as appropriate. All toilet partitions, lockers, benches, and chairs will be removed and recycled as appropriate. Finally, the main entrance from the corridor will be demolished, and a new entrance way created, to create space for an accessible path of egress.
Page | 6
Customer Service Office: Open Office, Supervisor Office, Break Room, Server Room:
Prior to demolition, the existing power distribution panels in the open office area and the supervisors office, as well as the step-down transformer and disconnect will be removed for relocation, and the server rack will be protected in place. All existing electrical, telecommunications, and fire alarm fixtures and accessories will be removed and salvaged for re-use as appropriate. All floor, wall, and ceiling finishes, including the carpet, resilient flooring, gypsum board, acoustical paneling, and t-bar ceiling, as well as all counters, doors, and door frames will be removed and recycled as appropriate. All furnishings, appliances, and portable equipment will be removed and recycled as appropriate. Finally, penetrations will be made in the walls and roof for proposed plumbing and HVAC lines.
Shop 112:
Penetrations will be made in the walls and roof for proposed HVAC lines.
Warehouse Restrooms:
All existing plumbing, electrical, and fire alarm fixtures and accessories will be removed and salvaged for re-use as appropriate. All floor, wall, and ceiling finishes, including the tile, gypsum board, and t-bar ceiling, as well as all counters, doors, and door frames will be removed and recycled as appropriate. All toilet partitions will be removed.
Warehouse Area:
Remove all wall insulation panels that have become dislodged from exterior wall.
Proposed Work
First Floor Office Men’s Restroom and Rear Access Corridor:
Construct new UFAS compliant main and rear entrances, as well as compliant shower facilities in place of the existing shower facilities. Install new tile floors, tile and gypsum board walls, and t-bar and gypsum board ceilings, as well as new counters and hollow metal doors and frames.
Connect new plumbing fixtures to the existing plumbing lines. Install new electrical and fire alarm fixtures, toilet partitions, and toilet and restroom accessories to finished surfaces. Finally, install new lockers and benches within the locker-room space.
First Floor Office Women’s Restroom:
Construct a new UFAS compliant main entrance as well as compliant shower facilities in place of the existing shower facilities. Install new tile floors, tile and gypsum board walls, and t-bar and gypsum board ceilings, as well as new counters and hollow metal doors and frames.
Connect new plumbing fixtures to the existing plumbing lines. Install new electrical and fire alarm fixtures, toilet partitions, and toilet and restroom accessories to finished surfaces. Finally, install new lockers and benches within the locker-room space.
Page | 7
Customer Service Office: Open Office, Supervisor Office, Break Room, Server Room:
Existing block and concrete walls will be furred out to provide a chase for routing plumbing, electrical, and telecommunication lines. Install plumbing and HVAC lines as described in the plumbing and mechanical sections. Relocate the power distribution panelboards and associated components to less obtrusive locations. Provide sealed finish to concrete floor in the open office area, add a resin floor finish to the break room and server room, and install carpet in the supervisor office. Install gypsum board walls throughout and a t-bar ceiling in all spaces except the break room. Finally, install new electrical, telecommunication, and fire alarm fixtures as well as new furnishings and appliances.
Warehouse Restrooms:
Install new tile floors, tile and gypsum board walls, and t-bar and gypsum board ceilings, as well as new counters and hollow metal doors and frames. Connect new plumbing fixtures to the existing plumbing lines. Install new electrical and fire alarm fixtures, toilet partitions, and toilet and restroom accessories to finished surfaces.
Warehouse Area:
After the damaged and deteriorating insulation has been removed, install semi-rigid insulation as needed to cover all exterior walls in the warehouse space. Once covered, install corrugated metal panels, supported with Z-Girts and bent plates, along exterior walls to secure insulation and provide a maintainable finish. Lastly, paint the warehouse floor with new traffic lines in accordance with the Government furnished striping plan.
See Mechanical, Plumbing, Electrical, and Fire Protection and Life Safety Sections of this document for more detailed information pertaining to those disciplines.
Code and Design Criteria
Demolition
Page | 10
V. Plumbing Requirements
Industry Codes:
ASTM Standards International Plumbing Code (IPC) International Energy Conservation Code (IECC)
ASHRAE 90.1
ASHRAE 189.1
Government Standards:
The Unified Facilities Criteria (UFC) are required by this project are referenced in the contract documents or cross-referenced within referenced documents. The following are significant UFC’s available on the website that are applicable to this project:
UFC 3-420-01; Plumbing Systems, with Change 10
All aboveground domestic water and waste/vent piping systems, in the Men’s and Women’s Toilet/Locker rooms, shall be removed back to the limits of these areas, except for the piping within the block plumbing chases. The piping inside these chases will be retained up to the connection point above the chase walls in the ceiling cavity of the first floor. The piping system will need to be isolated off to allow the remaining areas of the building to continue to operate.
Addition of temporary valves may be required for isolation with short building outage (prearranged). All plumbing fixtures shall be removed, and all associated appurtenances removed to the connection at the plumbing wall or at the floor. The underground waste piping shall be video taped from accessible points within the space to the exterior of the building.
From this video footage, it will be determined what approach the underground plumbing will take.
All aboveground domestic water and waste/vent piping systems, in the Warehouse Restroom area, shall be retained to the supply stops at each fixture. All plumbing fixtures shall be removed, and all associated appurtenances removed to the connection at the wall or at the floor. Slab cutting will be kept to a minimum to allow for the reconfiguration of the restroom area and associated fixtures.
The Second Floor Restroom floor drains will be removed in their entirety, including the waste piping below in the first floor ceiling space and re-piped as part of the First Floor work.
In the Men’s and Women’s Toilet/Locker Rooms, all new efficient plumbing fixtures will be provided in an updated arrangement (based on architectural layout). The domestic piping
Page | 11 systems will connect to the mains at the wall line, where piping is not concealed within concrete masonry unit walls, and all new distribution will be installed to serve the fixtures with the require utilities, including the connection points at the top of the plumbing chase walls that serve all the associated fixtures. Pending the video results, if acceptable, the existing underground waste system will be “jet-flushed” and reutilized to greatest extent possible to minimize the slab cutting.
In the Warehouse Restroom in the northwest corner of the Warehouse area, all new efficient plumbing fixtures will be provided in the same arrangement (based on architectural layout). The domestic piping systems will connect to the fixtures with the require utilities. The existing underground waste system will be reutilized to greatest extent possible to minimize any slab cutting.
The Second Floor Restrooms will have a new floor drain installed in each space that will be re-piped back to the main in the first floor ceiling space. The floor drain body will be installed to coincide with the flooring system so as not to allow water infiltration through or around the floor drain assembly and into the first floor ceiling area.
Customer Service Office (112) will require waste, vent and domestic water to serve a new kitchenette sink in the existing vault area. This will require core drilling through the back of the vault and tie into plumbing utilities within the existing water heater room.
Page | 12
VI. Electrical Requirements
Code and Design Criteria
Lighting and Power Distribution:
UFC 3-501-01 Electrical Engineering UFC 3-520-01 Interior Electrical Systems UFC 3-530-01 Interior and Exterior Lighting Systems and Controls UFC 3-560-01 Electrical Safety, O&M UFC 3-580-01 Telecommunications Interior Infrastructure Planning and Design CBC 2016 California Code Set
Existing Conditions
The existing electrical system for B977 appears to have been pieced together over the years in response to various small scale improvement projects following the original build-out in the 1960’s and 70’s. Power is sourced primarily from the utility yard on the west side of the building, and distributed through a series of panelboards to the various areas. The telecommunications infrastructure has been overhauled much more recently, and consists of a handful of server rooms throughout the building distributing copper cabling throughout the building.
Restrooms:
Existing light fixtures will be removed and replaced with new fixtures and controls meeting applicable requirements. Many of the existing receptacles will need to be relocated based on changes to the lavatory, shower, and locker areas. Existing conduit and conductors feeding items to be replaced or relocated are to be demolished back to the branch circuit and rein-stalled per the proposed design.
Offices:
Existing light fixtures will be removed and replaced with new fixtures and controls meeting applicable requirements. Existing receptacles will need to be removed or relocated based on changes to the furniture layout. Existing conduit and conductors feeding items to be replaced or relocated are to be demolished back to the branch circuit and reinstalled per the proposed design. The existing power distribution panel in the open office area of CSO 113 will need to be removed and relocated to accommodate the furring out of the walls. Existing block and concrete walls will be furred out to provide a chase for concealment of electrical and telecommunications conduits. The existing fire alarm panel in the Supervisors Office, as well as the supporting disconnect and transformer, will need to be removed and relocated, with the power connection modified as needed to accommodate the new location.
Page | 13
Proposed Work
Power Distribution Systems:
The addition and/or replacement of select HVAC Units will be supported with new runs from existing power distribution panels managing equipment loads. Load assessments will be performed by the contractor prior to construction to ensure the specified panels can accommodate the designed loading of the additional equipment. Although general purpose and lighting loads are not expected to increase substantially, similar load assessments will be performed for any additions to ensure the available capacity.
General purpose receptacles will be replaced, relocated, or added as necessary in accordance with UFC and NEC requirements. Receptacles will be placed based on revised fixture and furniture layouts to properly support occupant needs. Excess or unnecessary receptacles will be removed and their circuits repurposed as appropriate.
Interior Lighting:
New lighting fixtures will be installed in all spaces covered by the scope of work in accordance with UFC, NEC, and CBC requirements. All fixtures will be recessed within the ceiling.
Photometric Calculations have been included with Appendix C.
Electrical Calculations:
Lighting Photometric Calculations: Data is shown in Appendix C.
Power distribution system loading calculations: To be provided with subsequent submittals.
Page | 14
VII. Fire Protection and Life Safety Requirements
This design analysis report includes general fire protection and life safety design requirements that are based upon the project’s Request for Proposal (RFP) and applicable standards and design guides. The applicable design criteria referenced in this report include the following:
UFC 1-200-01 General Building Requirements, Change 1 UFC 3-600-01 Design: Fire Protection Engineering for Facilities, Change 2
IBC International Building Code, 2015 edition IFC International Fire Code, 2015 edition
NFPA 1 Fire Code, 2015 edition.
NFPA 13 Standard for the Installation of Sprinkler systems, 2016 edition NFPA 70 National Electrical Code, 2017 edition NFPA 72 National Fire Alarm and Signaling Code®, 2016 edition NFPA 101 Life Safety Code®, 2015 edition NFPA 720 Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment, 2015 edition
Travis Air Force Base Facilities Excellence Guide, 2008 edition
Introduction
This design analysis report presents the intent and methodology of the fire protection and life safety program for the Air Freight Terminal, Building 977 at Travis Air Force Base (TAFB). This report will describe the overall approach to the application of active and passive fire protection features for the building, as required by the project’s Statement of Work (SOW), responses to RFI’s, applicable Unified Facilities Criteria (UFC), and nationally recognized Codes and standards. The Authority Having Jurisdiction (AHJ) for this project is the Air Force Civil Engineering Corps Fire Protection Engineer (FPE).
Project Description
This project includes selective demolition and renovation of the Air Freight Terminal, Building 977 at Travis Air Force Base in Fairfield, California. The project is to demolish the existing First Floor Men’s and Women’s Restrooms, First Floor Customer Service Office, and Warehouse Restrooms. These spaces will be renovated to meet user needs, in addition to small improvements in other spaces.
The building is equipped with a wet pipe fire sprinkler system that will be modified to accommodate the floor plan changes. The building is also equipped with a fire alarm system that will be modified.
The project will meet the requirements for building rehabilitation as regulated by Chapter 43 of NFPA 101 and Chapter 34 of UFC 3-600-01. All work within the scope of work will meet existing
Page | 15 occupancy provisions and the building will not be less conforming with the UFC and NFPA 101 than before the project renovations.
Building and Life Safety Code Analysis
Design and construction will be in accordance with the fire resistive construction requirements, maximum allowable floor area and building height limitations, and building separation/exposure protection requirements of the 2015 IBC, selected fire resistive construction requirements of the 2015 Life Safety Code®, and applicable requirements of the referenced UFCs. The following sections of this report will provide a summary of these requirements along with brief discussions of design compliance with the requirements.
OCCUPANCY AND HAZARD CLASSIFICATIONS:
Occupancy classifications are assigned to all rooms and spaces in accordance with the definitions provided in IBC Chapter 3 and NFPA 101® Chapter 6. Hazard classifications are assigned in accordance with the definitions provided in NFPA 101® Chapter 6.
Use and Occupancy Classifications
In accordance with IBC Chapter 3, NFPA 101® Chapter 6, and the building uses described in this report, the applicable occupancy classifications are listed in Table 1 below.
Table 1 – Use and Occupancy Classifications
Room Name Description of Use
Occupancy Classifications
IBC NFPA 101®
Office / Restroom / Locker Room
Office Space Group B Business
Warehouse Storage Space S-1 Storage
Building Occupancy Classification
Based on the information presented in Table 1 above, the building will be classified as follows:
For the purposes of applying IBC requirements:
Nonseparated mixed use building, Primary occupancy: Group S-1 Secondary occupancy: Group B
For the purposes of applying NFPA 101® requirements:
Storage occupancy building (NFPA 101® 6.1.13) with incidental areas in accordance with 6.1.14.1.3.
In accordance with IBC Section 508.3, the most restrictive provisions of the code shall apply.
Page | 16
Hazard Classifications
Based on the building uses described in the previous section of this report, applicable hazard classifications for the buildings, as defined in NFPA 101® 6.2.2, include the following:
Low Hazard Contents (NFPA 101® 6.2.2.2):
Offices and bathrooms
Ordinary Hazard Contents (NFPA 101® 6.2.2.3):
No applicable rooms or spaces
High Hazard Contents (NFPA 101® 6.2.2.4):
No applicable rooms or spaces within the area of work
CONSTRUCTION CLASSIFCATION:
In accordance with IBC Table 601 the existing building most nearly resembles Type II-B construction. The building will be Type II-B Construction to match the existing construction type.
HEIGHT AND AREA ANALYSIS:
No additional stories or areas are being added to the building. No height or area analysis is necessary.
FIRE RESISTIVE CONSTRUCTION ANALYSIS:
IBC Fire Resistive Construction Requirements
No change is being made to the construction type. No analysis is necessary.
IBC Exterior Exposure Protection Requirements
No change is being made to the exterior of the building. No analysis is necessary.
UFC and NFPA Fire Resistive Construction Requirements
No change is being made to fire resistive construction requirements. No analysis is necessary.
Protection of Opening and Penetrations
In accordance with IBC Chapter 7, NFPA 101® Chapter 8, and NFPA 90A Chapter 5, analyses of required opening and penetration protection are presented in Tables 2 & 3 below. All existing ratings shall be maintained.
Page | 17
Table 2 – Opening and Penetration Protection Analysis
Type of Separation Assembly Required/Allowed Provided Door Openings
- 1-Hour rated fire barriers (NFPA 101®
8.3.3 & 8.3.4.2)
- 45-minute assemblies, see Table 8 Notes 1-3
- N/A
Window Openings
- 1-Hour rated fire barriers (NFPA 101®
8.3.3 & 8.3.4.2)
- 45-minute assemblies, see Table 8 Notes 3-6
Air Transfer Openings
- 1-Hour rated fire barriers (NFPA 90A
5.3.1.2 & 5.4.1.1)
- 90-minute fire dampers, see Table 8 Notes 7-11
All Other Penetrations
- 1-Hour rated fire barriers (NFPA 101®, 8.3.5)
- 1-hour ‘F’ or ‘F’ & ‘T’ rated fire stopping systems, see Table 8 Notes 12-16
- To Be Verified
During Construction
Table 3 – Supplemental Notes for Table 2 For Potentially Rated Exterior Wall or Mechanical Room
Note # Requirements
Doors must be tested, labeled and installed in accordance with NFPA 252 &
NFPA 80.
Glazing in doors must comply with IBC 715.4.3.2 or NFPA 101® 8.3.3.6, as appropriate.
Doors must be self-closing or automatic closing in accordance with IBC 715.4.8 or NFPA 101® 8.3.3.3, as appropriate, and must have active latch bolts.
Windows must be tested, labeled and installed in accordance with NFPA 257 &
NFPA 80.
Windows tested in accordance with ASTM E 119 or ANSI/UL 263 shall be permitted.
The total combined area of glazing in fire door and fire window assemblies in a fire barrier cannot exceed 25% of the fire barrier area that is common with any room.
Fire dampers must be tested in accordance with UL 555 and must be labeled.
Fire damper actuating links must have a temperature 50 °F above the normal temperature within the ductwork system, but no less than 160 °F. (IBC 716.3.3.4) emperature rating must be
Page | 18
Table 3 – Supplemental Notes for Table 2 For Potentially Rated Exterior Wall or Mechanical Room
Note # Requirements
Smoke dampers must be activated by smoke detectors in accordance with NFPA
72®. (IBC 716.3.3.2/907.3)
Dampers must be provided with access large enough to permit inspection and maintenance.
Fire-stopping systems must be tested in accordance with ASTM E814 or they must be tested as part of a fire-rated wall assembly.
13 Sleeves at penetrations must be installed in accordance with IBC 713.2.
Insulation and coverings must not pass through penetrations unless tested as part of the fire-stopping system.
Maximum diameter of penetrating items is 4-inches and maximum aggregate area of items is 0.7 square feet per 100 square feet of wall or floor area.
Connections between combustible and noncombustible piping may not occur within 36-inches of a penetration fire-stopping system.
INTERIOR FINISH AND INSULATION MATERIALS:
In accordance with NFPA 101® 7.1.4, 10.2 and occupancy specific chapters, and UFC 3-600-01 Section 2-7, an analysis of interior finish and insulation materials requirements is presented in Table 4 below.
Table 4 – Interior Finish and Insulation Materials Analysis
Finish or Insulation Material Required/Allowed Provided Wall and Ceiling Finishes (NFPA 101®
Section 10.2.3)
- All Areas
- Class A, B or C
- To be confirmed by construction submittals
Floor Finishes (NFPA 101® Section 10.2.7.2)
- All Areas
- Minimum critical heat flux > 0.1 W/cm2 construction submittals
Insulation Materials
(UFC 3-600-01, 8-3)
- Thermal and acoustical insulation
- FS
review of construction submittals
Notes FS = Flame Spread rating, SD = Smoke Developed rating
Page | 19
MEANS OF EGRESS ANALYSIS
OCCUPANT LOAD AND EGRESS FACTORS:
The alternations within the scope of work will not result in a change in the number of occupants.
No analysis is necessary.
REQUIRED EXIT CAPACITY AND NUMBER OF EXITS:
Required Number of Exits
No change is being made to the number of exits. No analysis is necessary.
Minimum Dimensions for Egress System Components
No change is being made to the means of egress components. No analysis is necessary.
Required Egress Capacity
No change is being made to the egress capacity. No analysis is necessary.
ARRANGEMENT OF MEANS OF EGRESS:
No change is being made to the arrangement of means on egress components. No analysis is necessary.
ILLUMINATION, EMERGENCY LIGHTING, & EGRESS PATH MARKINGS:
Sections 7.8, 7.9 & 7.10 of NFPA 101® present general requirements for illumination, emergency lighting and egress path markings, respectively, in all means of egress components.
Applicability of these requirements, along with any additional requirements and/or exceptions to the general requirements, is addressed in the occupancy specific chapters. The following sub-sections will provide a summary of the general requirements and the occupancy specific exceptions, and will compare the requirements against the proposed design.
Illumination
In accordance with NFPA 101® 7.8.1.1: When required by the occupancy specific chapters of NFPA 101®.
Must be provided in stairs, aisles, corridors, ramps, escalators, walkways and exit passageways.
Page | 20
Must be in accordance with the requirements of NFPA 101® 7.8.1.2 thru 7.8.1.5.
Occupancy specific requirements from NFPA 101® include the following:
NFPA 101® 39.2.8:
o No applicable exceptions or additional requirements.
NFPA 101® 42.2.8:
o No applicable exceptions or additional requirements.
Emergency Lighting
In accordance with NFPA 101® 7.9.1: When required by the occupancy specific chapters of NFPA 101®.
Must be provided in stairs, aisles, corridors, ramps, escalators, walkways and exit passageways.
Must be in accordance with the requirements of NFPA 101® 7.9.1.3 & 7.9.2.
NFPA 101® 39.2.9:
o No applicable exceptions or additional requirements.
NFPA 101® 42.2.9:
o No applicable exceptions or additional requirements.
Egress Path Markings
In accordance with NFPA 101® 7.10.1: When required by the occupancy specific chapters of NFPA 101®.
Must be provided at all exterior exit doors and at interior locations as necessary to assure that a sign is visible from any direction in an exit access component Must be in accordance with the requirements of NFPA 101® 7.10.1 thru 7.10.8.
NFPA 101® 39.2.10:
o No applicable exceptions or additional requirements.
NFPA 101® 42.2.10:
o No applicable exceptions or additional requirements.
FIRE DEPARTMENT ACCESS
No changes are being made to the site or exterior of the building. No analysis is necessary for fire department vehicle and roof access.
FIRE SUPPRESSION SYSTEMS
Design and construction will be in accordance with the fire suppression systems requirements of UFC 3-600-01. The following sections of this report will provide a summary of these requirements along with brief discussions of design compliance with the requirements.
FIRE SPRKINLER SYSTEMS:
Page | 21
This building is equipped with an existing sprinkler system. The existing system will be modified to accommodate the floor plan changes within the area of work.
The sprinkler system providing coverage to the Customer Service Office, Men’s and Women’s Toilet/Locker Rooms, and Warehouse Men’s and Women’s Toilet Rooms will be designed with a density of 0.10 gpm/ sq.
ft. over a minimum design area of 1,500 square feet. This will include a 250 gpm hose allowance
FIRE ALARM/MASS NOTIFICATION AND DETECTION
Design and construction will be in accordance with the fire detection and alarm systems requirements of UFC 3-600-01, UFC 4-010-01, NFPA 72, and RFI’s. The following sections of this report will provide a summary of these requirements along with brief discussions of design compliance with the requirements.
FIRE ALARM SYSTEMS:
The building is equipped with an existing fire alarm system. The fire alarm system will be modified to add detection and notification devices to accommodate the floor plan changes and facility improvements.
- The system must be capable of providing occupant notification throughout the building via speakers and strobes.
- Automatic initiating devices (i.e. detectors) must be connected to the fire alarm system.
- Placement and installation of audiovisual notification appliances must be in accordance with NFPA 101®and NFPA 72.
- The system must be connected to a central alarm or alarm monitoring location such as the Base Fire Department or a central dispatch center.
- Wireless fire alarm systems are not permitted.
- The systems must also be configured to initiate transmission of an alarm signal to a constantly attended location (i.e. Base Fire Department or central dispatch center).
Alarm systems are required to be independent and cannot be part of another system such as security or energy monitoring in accordance with UFC 3-600-01, Section 9-18.1.2.
- The Fire Alarm system can affect shutdown of HVAC unit in accordance with UFC 3-600-01, Section 9-18.1.2.2.
FIRE DETECTION SYSTEMS:
UFC 3-600-01, Section 9-19 requires carbon monoxide detectors to be installed in accordance with NFPA 720 where combustible fuel burning equipment is present.
Carbon monoxide detectors shall be powered by the fire alarm control panel.
Page | 22
Carbon monoxide detectors must be located in each space where fuel burning equipment is located.
At least one detector must be located in each HVAC zone served by a separate air handler in the facility.
FIRE ALARM REPORTING SYSTEMS:
There are no changes to the fire alarm reporting system within the scope of work.
Bid Schedule
Travis AFB, CA Prepared by: TranSystems
Date: 30 April 2019
Exterior Enclosure Exterior Wall Backup Construction 1 LS Insulation & Vapor Barrier 1 LS
Roofing 1 LS Interior Construction
Drywall Partition 1 LS Interior Finishes
TYPE 1 - 3-5/8" MTL STUD W/ 5/8" CEMENT BACKERBOARD BS 1 LS
TYPE 1A - 6" MTL STUD W/ 5/8" CEMENT BACKERBOARD BS 1 LS
TYPE 1B - 3-5/8" MTL STUD W/ 5/8" CEMENT BACKERBOARD 1S & GWB 1S 1 LS
TYPE 1C - 3-5/8" MTL STUD W/ 5/8" CEMENT BACKERBOARD 1S 1 LS
TYPE 1D - 3-5/8" MTL STUD W/ 5/8" GWB 1S 1 LS
TYPE 2 & TYPE 4 - 5/8" CEMENT BACKERBOARD 1S 1 LS
TYPE 2A & 4A - 5/8" CEMENT BACKERBOARD BS 1 LS
TYPE 3 - 2-1/2" MTL STUD W/ 5/8" GWB 1S 1 LS
TYPE 3A - 3-5/8" MTL STUD W/ 5/8" GWB 1S 1 LS
TYPE 5 - 7/8" FURRING CHANNEL W/ 5/8" GWB 1S 1 LS
TYPE 6 - (2)3-5/8" MTL STUD W/ 5/8" CEMENT BACKERBOARD 1S & PLASTER 1S 1 LS
HM DOOR/HM FRAME, 3 x 7 SINGLE 1 LS HM DOOR/EXIST. HM FRAME, 3 x 7 SINGLE 1 LS Compartments, Cubicles & Toilet Partitions 1 LS Toilet & Bath Accessories 1 LS Lockers 1 LS Casework 1 LS Other Interior Specialties 1 LS Paint 1 LS Tile Wall Finishes 1 LS Tile Floor Finishes 1 LS Carpeting 1 LS Hardeners and Sealers 1 LS Epoxy Floor Finishes 1 LS Wall Base Finishes 1 LS Acoustical Ceiling Tiles & Panels 1 LS Gypsum Wallboard Ceiling Finishes 1 LS
Plumbing Plumbing Fixtures 1 LS Pipes & Fittings 1 LS Waste and Vent Pipe & Fittings 1 LS Floor Drains 1 LS
HVAC
Air Distribution, Heating & Cooling 1 LS Exhaust System 1 LS Air Handling 1 LS Unit Heaters 1 LS Package Units 1 LS Ductless Split Systems 1 LS HVAC Controls 1 LS Testing & Balancing 1 LS HVAC Commissioning 1 LS
Fire Protection Sprinklers 1 LS
Electrical Secondary 1 LS Panels & Transformers 1 LS Branch Wiring 1 LS Lighting Equipment 1 LS
Line TotalDescription Quantity Unit
Bid Schedule
Travis AFB, CA Prepared by: TranSystems
Date: 30 April 2019
Line TotalDescription Quantity Unit
Other Lighting and Branch Wiring 1 LS Fire Alarm Systems 1 LS Telecommunications Systems 1 LS
Appliances 1 LS Selective Building Demolition 1 LS
Subtotal
Escalation Mid Point of Construction % Subtotal
General Conditions / Onsite Field Personnel % Subtotal
General Contractor Overhead % Subtotal
Bonds and Insurance % Subtotal
Contractor Profit % Subtotal
Base Bid
APPENDIX B
PHOTOMETRIC CALCULATIONS
BASIS OF DESIGN
ROOM ILLUMINATED TARGET ILLUMINATION CRITERIA PER UFC 3-530-01
QTY OF FIXTURES
IN ROOM
FIXTURE
TYPE
WATTS PER
FIXTURE
WATTS IN ROOM
APPROX SQUARE
FOOTAGE OF ROOM
ACTUAL WATTS PER
SQUARE FOOT OF ROOM
*MAX W/SF ALLOWED BY
ASHRAE 90.1/189.1-2016
*MAX WATTAGE ALLOWED
BY ASHRAE 90.1/189.1-2016
BUILDING 977 AREAS
Customer Service Office 30 FC at 2'6" AFF, 2:1 avg:min 17 RDI24 38.0 646 780 0.83 0.73 569 Server Room 50 FC at 3' AFF, 3:1 avg:min 4 RT14 18.5 74 156 0.47 0.39 61
2 RT22 18.4
1 RT14 18.5
Superintendant Office 30 FC at 2'6" AFF, 2:1 avg:min 4 RDI24 38.0 152 210 0.72 0.84 176 Locker Rooms: 15 FC on floor; 2:1 avg:min 4 RT22 18.4
Restrooms: 15 FC fixtures and vanities; 2:1 avg:min 4 RT14 18.5 Showers: 10FC; 2:1 avg:min 4 RDL 11.0
Locker Rooms: 15 FC on floor; 2:1 avg:min 14 RT22 18.4 Restrooms: 15 FC fixtures and vanities; 2:1 avg:min 10 RT14 18.5
Showers: 10FC; 2:1 avg:min 8 RDL 11.0 Women's Warehouse Toilet 15 FC fixtures and vanities; 2:1 avg:min 1 RT14 18.5 19 40 0.46 0.77 31 Men's Warehouse Toilet 15 FC fixtures and vanities; 2:1 avg:min 3 RT14 18.5 56 128 0.43 0.77 99
1,724 3,411 1,887
WATTS USED SQUARE FEET MAX WATTS ALLOWED
91.3%
TRAVIS AIR FORCE BASE B977 REPAIR - LIGHTING SUMMARY (2-25-2019)
PERCENTAGE USED OF MAXIMUM ALLOWABLE WATTAGE OVER ALL AGGREGATED ROOMS:
Break Room 15 FC at 2'6" AFF, 2:1 avg:min 55 120 0.46 0.84 101
Women's Toilet/Locker/Showers
0.43 639
531 1,485 0.36Men's Toilet/Locker/Showers
192 492 0.39 0.43
T R
A V
IS
A
IR
F
O R
C E B
A S
E
B U
IL
D
IN
G
R
E P
A
IR
L
IG
H T
IN
G
P H
O T
O M
E T
R
IC
S T
A T
IS
T
IC
S
Designer
DDP
Date
Scale
Not to Scale
LIGHTING PHOTOMETRIC STATISTICS
PHOTOMETRIC CALCULATION AREA Avg Max Min Max/Min Avg/Min
Break Room FC on Countertop 40.8 fc 46.5 fc 34.3 fc 1.4:1 1.2:1
Break Room FC on Floor 32.3 fc 37.2 fc 26.4 fc 1.4:1 1.2:1
Corridor Warehouse-to-Men's Room FC on Floor 18.4 fc 20.1 fc 13.6 fc 1.5:1 1.4:1
Customer Service FC on Desktops 57.3 fc 73.6 fc 28.7 fc 2.6:1 2.0:1
Men's HC Shower Entry FC on Floor 15.2 fc 17.3 fc 14.0 fc 1.2:1 1.1:1
Men's Toilet/Locker FC on Countertops 43.6 fc 48.7 fc 36.4 fc 1.3:1 1.2:1
Men's Toilet/Locker Room FC on FLoor 26.2 fc 37.2 fc 13.3 fc 2.8:1 2.0:1
Men's Warehouse Toilet FC on Countertop 43.4 fc 48.6 fc 32.7 fc 1.5:1 1.3:1
Men's Warehouse Toilet FC on FLoor 23.1 fc 32.4 fc 14.7 fc 2.2:1 1.6:1
Server Room FC at 3'H 49.3 fc 62.8 fc 32.5 fc 1.9:1 1.5:1
Superintendant Office FC on Desktops 42.8 fc 50.1 fc 30.9 fc 1.6:1 1.4:1
Typical Men's Shower Entry FC on Floor 19.5 fc 20.3 fc 18.5 fc 1.1:1 1.1:1
Typical Shower Stall FC on Floor 20.4 fc 21.1 fc 20.1 fc 1.0:1 1.0:1
Women's Shower Entry FC on Floor 22.6 fc 25.7 fc 20.2 fc 1.3:1 1.1:1
Women's Toilet/Locker FC on Countertop 53.4 fc 62.8 fc 38.9 fc 1.6:1 1.4:1
Women's Toilet/Locker Room FC on Floor 23.5 fc 39.3 fc 12.6 fc 3.1:1 1.9:1
Women's Warehouse Toilet FC on Countertop 31.3 fc 38.2 fc 25.9 fc 1.5:1 1.2:1
Women's Warehouse Toilet FC on Floor 23.1 fc 24.8 fc 21.8 fc 1.1:1 1.1:1
A V
IS
A
IR
F
O R
C E B
A S
E B
U
IL
D
IN
G
R E P
A
IR
L
IG
H T
IN
G
P H
O T
O M
E T R
IC
C
A L C
U L A
T
IO
N S
M E
N 'S
L O
C K
E R
R O
O M
A R
E A
Designer
DDP
Date
Scale
Not to Scale
1 of 1MEN'S LOCKER ROOM AREA - LIGHTING PHOTOMETRIC CALCULATION
A V
IS
A
IR
F
O R
C E B
A S
E B
U
IL
D
IN
G
R E P
A
IR
L
IG
H T
IN
G
P H
O T
O M
E T R
IC
C
A L C
U L A
T
IO
N S
W O
M E
N 'S
L O
C K
E R
R O
O M
A R
E A
Designer
DDP
Date
2/25/2019
Scale
Not to Scale
WOMEN'S LOCKER ROOM AREA - LIGHTING PHOTOMETRIC CALCULATION
A V
IS
A
IR
F
O R
C E B
A S
E B
U
IL
D
IN
G
R E P
A
IR
L
IG
H T
IN
G
P H
O T
O M
E T R
IC
C
A L C
U L A
T
IO
N S
O F F
IC
E A
R E
A S
Designer
DDP
Date
Scale
Not to Scale
1 of 1OFFICE AREAS - LIGHTING PHOTOMETRIC CALCULATION
A V
IS
A
IR
F
O R
C E B
A S
E B
U
IL
D
IN
G
R E P
A
IR
L
IG
H T
IN
G
P H
O T
O M
E T R
IC
C
A L C
U L A
T
IO
N S
F R
E
IG
H T
T E
R M
IN
A
L W
A R
E H
O U
S E T
O
IL
E T S
Designer
DDP
Date
/201
Scale
Not to Scale
FREIGHT TERMINAL WAREHOUSE TOILETS - LIGHTING PHOTOMETRIC CALCULATION
APPENDIX H
MECHANICAL CALCULATIONS
BASIS OF DESIGN
File details come from the government source that posted it. Updated .