Attachment 1 – Statement of Work (SOW) 11 Oct 19.pdf

PDF 22 KB Posted

Attached to
Renovate Travis AFB B977 Air Freight Terminal Federal contract opportunity
Solicitation number
FA442720R0004
Issued by
Department of the Air Force Air Mobility Command

About this file

This statement of work and related federal contract opportunity provide details for renovating the Travis Air Force Base Building 977 air freight terminal. The contractor shall provide all labor, materials, tools and equipment to renovate the first floor office restrooms, customer service office, and warehouse restrooms per the final design submittals. Renovations include architectural, mechanical, electrical, plumbing and fire protection work to provide code-compliant spaces suitable for supporting current base missions. Improvements focus on upgrading user comfort within spaces and ensuring renovated areas meet all criteria. The statement of work also includes measures to improve thermal comfort and safety for personnel in the warehouse area and Shop 112. The solicitation is issued by the Department of the Air Force Air Mobility Command to renovate Travis AFB Building 977 per the statement of work and design documents provided.

View the file

Other files for this federal contract opportunity

Other files attached to Renovate Travis AFB B977 Air Freight Terminal, newest first.
File Type Posted
Solicitation Amendment FA442720R00040005 SF 30.pdf PDF
Attachment 10 - Environmental Report.pdf PDF
Attachment 3 - TAFB B977 Drawings 08.21.2019, Rev1, 2 Apr 20.pdf PDF
B977 Air Freight Terminal RFI Questions and Answers.pdf PDF
Attachment 11 - Painting Requirements.pdf PDF
Solicitation Amendment FA442720R00040004 SF 30.pdf PDF
B977 Attendee Roster.pdf PDF
Solicitation Amendment FA442720R00040003 SF 30.pdf PDF
Attachment 7 - Past Performance Questionnaire - Version 2.pdf PDF
Solicitation Amendment FA442720R00040002 SF 30.pdf PDF
Solicitation Amendment - FA442720R00040002.pdf PDF
Attachment 6 - Davis Bacon Wage Determination CA20200007 3 Jan 2020.pdf PDF
Attachment 5 - Contract Security Clause 5 Mar 19.pdf PDF
Solicitation Amendment FA442720R00040001 SF 30 (1).pdf PDF
Attachment 4 - TAFB B977 Specifications 21 Aug 19.pdf PDF
Attachment 2 - TAFB B977 Design Analysis 21 Aug 19.pdf PDF
Attachment 9 – Contractor Bid Pricing Schedule.pdf PDF
Travis AFB Solicitation - FA442720R0004.pdf PDF
Attachment 7 - Past Performance Questionnaire.pdf PDF
Attachment 3 - TAFB B977 Drawings 21 Aug 19.pdf PDF
Attachment 8 – Contractor Request for Information Sheet.pdf PDF
Attachment 5 - TAFB B977 Specifications 21 Aug 19.pdf PDF
Attachment 7 - Davis Bacon Wage Determination CA20200007 3 Jan 2020.pdf PDF
Attachment 6 - Contract Security Clause 5 Mar 19.pdf PDF
Attachment 3 - TAFB B977 Drawings 21 Aug 19.pdf PDF
Travis AFB Solicitation - FA442720R0004.pdf PDF
Attachment 2 - TAFB B977 Design Analysis 21 Aug 19.pdf PDF
Attachment 8 - Past Performance Questionnaire.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Repair Air Freight Terminal, B977

TRAVIS AFB, CALIFORNIA

Project Number: XDAT 16-1042

TRIRIGA Number: 1023631 DATE: 11 October 2019

1.0 DESCRIPTION OF WORK: The contractor is to provide all supplies, materials, tools, equipment, and qualified labor necessary to renovate the first floor office restrooms, the customer service office, and the warehouse restrooms within building 977 per Tran Systems Final Design Submittals (See 2a,2b and 2c). These renovations include the architectural, mechanical, electrical, plumbing, and fire protection services necessary to provide the code-compliant spaces required by the Scope of Work (SOW) suitable for supporting the current mission. These renovations focus primarily on upgrading the user comfort within these spaces, including finishes and temperature control, and ensuring that the renovated spaces meet all applicable criteria. The SOW also includes specific measures to improve the thermal comfort and safety of personnel working with the warehouse area of the freight terminal, as well as Shop 112.

2.0 STATEMENT OF WORK: See “2a. TAFB B977 Design Analysis”

2.1 Architectural Requirements: See “2a. TAFB B977 Design Analysis” pages 5-7, Code and Design Criteria, Existing Conditions, Demolition and Proposed Work for the following facility areas:

a. First Floor Office Men’s Restroom and Rear Access Corridor

b. First Floor Office Women’s Restroom

c. Customer Service Office: Open Office, Supervisor Office, Break Room, Server Room

d. Shop 112

e. Warehouse Restrooms

f. Warehouse Area

2.2 Mechanical Requirements: See “2a. TAFB B977 Design Analysis” pages 8-9, Code and Design Criteria, Demolition and Proposed Work for the following facility areas:

a. First Floor Office Men’s and Women’s Toilet/Locker Rooms

b. Northwest Restroom

c. Customer Service Office (112)

d. Shop (113)

e. Customer Service Office IT Room

f. Warehouse Area

g. The new equipment being provided under this scope of work shall be DDC controlled and connected to the base wide EMCS system.

2.3 Plumbing Requirements: See “2a. TAFB B977 Design Analysis” pages 10-11, Code and Design Criteria, Demolition, and Proposed Work for the following facility areas:

a. First Floor Office Men’s and Women’s Toilet/Locker Rooms

b. Customer Service Office (112)

c. Warehouse Restroom

d. Second Floor Restrooms

2.4 Electrical Requirements: See “2a. TAFB B977 Design Analysis” pages 12-13, Code and Design Criteria, Existing Conditions, Demolition and Proposed Work for the following facility areas and systems:

a. Restrooms

b. Offices

c. Power Distribution Systems

d. Interior Lighting

e. Electrical Calculations

2.5 Fire Protection and Life Safety Requirements: See “2a. TAFB B977 Design Analysis” pages 14-21, Code and Design Criteria, Introduction, Project Description, Building and Life Safety Code Analysis, Fire Department Access, Fire Suppressions Systems, Fire Alarm/Mass Notification and Detection.

2.6 Photometric Calculations: See“2a. TAFB B977 Design Analysis” Appendix B

2.7 Mechanical Calculations: See“2a. TAFB B977 Design Analysis” Appendix H

3.0 DESIGN DRAWINGS: See “2b. TAFB B977 Design Drawings”

3.1 General Drawings: See “2b. TAFB B977 Design Drawings” G-000 to G-101

3.2 Architectural Drawings: See “2b. TAFB B977 Design Drawings” A-001 to A-601

3.3 Mechanical-Plumbing Drawings: See “2b. TAFB B977 Design Drawings” M-001 to M602

3.4 Fire Sprinkler Drawings: See “2b. TAFB B977 Design Drawings” FX001 to FX101

3.5 Electrical Drawings: See “2b. TAFB B977 Design Drawings” E-001 to E-651

3.4 Telecommunication Drawing: See “2b. TAFB B977 Design Drawings” T-101

3.5 Fire Alarm Drawings: See “2b. TAFB B977 Design Drawings” FA001 to FA101

4.0 DESIGN SPECIFICATIONS: See “2c. TAFB B977 Specifications”