2-2 ATCH 1 SPECIFICATIONS 01301

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition Base Engineer Requirements (SABER), newest first.
File Type Posted
10-R-0102 Questions Answers 2.pdf PDF
Pre-Bid Conference Site Visit Attendee List.pdf PDF
DSC_0684.JPG JPG image
DSC_0688.JPG JPG image
DSC_0685.JPG JPG image
DSC_0690.JPG JPG image
DSC_0689.JPG JPG image
Updated 4-1 ATCH 7 Past Performance Questionnaire 10-R-0102 SABER.pdf PDF
FA4427-10-R-0102-0001 SABER Solicitation.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 14.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 33-34.pdf PDF
D3-3 DRAWING 24 —
D3-6 DRAWING 27 —
D3-0 DRAWING 21 —
D3-7 DRAWING 28 —
D2-8 DRAWING 19 —
D4-3 DRAWING 34 —
D3-5 DRAWING 26 —
D3-8 DRAWING 29 —
D4-4 DRAWING 35 —
D4-1 DRAWING 32 —
D1-2 DRAWING 3 —
D1-6 DRAWING 7 —
D2-7 DRAWING 18 —
D1-9 DRAWING 10 —
D1-8 DRAWING 9 —
D1-5 DRAWING 6 —
D1-0 DRAWING 1 —
D2-2 DRAWING 13 —
D2-0 DRAWING 11 —
D1-7 DRAWING 8 —
1-9 ATCH 1 SPECS 01090 10-R-0102 SABER.pdf PDF
1-2 ATCH 1 SPECS TABLE OF CONTENTS 10-R-0102 SABER 26 APR 10.pdf PDF
2-9 ATCH 1 SPECS 01600 10-R-0102 SABER.pdf PDF
4-2 ATCH 8 Subcontractor Teaming Consent Form 10-R-0102 SABER.pdf PDF
1-7 ATCH 1 SPECS 01045 10-R-0102 SABER.pdf PDF
4-3 ATCH 9 Government Furnished Property Info 10-R-0102 SABER.pdf PDF
4-0 ATCH 6 Cost Estimate Worksheet —
3-2 ATCH 1 SPECS 01700 10-R-0102 SABER.pdf PDF
1-3 ATCH 1 SPECS 01010 10-R-0102 SABER.pdf PDF
2-1 ATCH 1 SPECS 01300 10-R-0102 SABER.pdf PDF
2-5 ATCH 1 SPECS 01440 10-R-0102 SABER.pdf PDF
1-8 ATCH 1 SPECS 01060 10-R-0102 SABER.pdf PDF
2-4 ATCH 1 SPECS 01410 10-R-0102 SABER.pdf PDF
2-8 ATCH 1 SPECS 01570 10-R-0102 SABER.pdf PDF
3-5 ATCH 1 SPECS DIV 26 thru 49 10-R-0102 SABER.pdf PDF
3-6 ATCH 2 SCHEDULE OF DRAWINGS 10-R-0102 SABER.pdf PDF
3-9 ATCH 5 SEED PROJECT SCOPE 10-R-0102 SABER 26APR10.pdf PDF
2-6 ATCH 1 SPECS 01500 10-R-0102 SABER.pdf PDF
1-6 ATCH 1 SPECS 01040 10-R-0102 SABER.pdf PDF
Show all 50

Simplified Acquisition Base Engineer Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAVIS AFB _SABER e

SECTION 01301

SUBMITTALS

1. GENERAL

1.1 REQUIREMENTS INCLUDED

A. Procedures.

B. Construction Progress Schedules.

C. Shop Drawings.

D. Product Data.

E. Samples.

F. Material Lists

G. Installer Qualification

1.2 PROCEDURES

!ntract FA4427-l O-R-Ol02

A. Deliver all submittals to the contracting officer within 10 days after the Issuance of Delivery Order, where "Notice to Proceed" appears in individual Specification Sections, it shall be meant to read as "Delivery Order" unless otherwise specified.

B. Submit each item using AF Form 3000, available from the contracting officer. Identify project, contractor, subcontractor, major supplier; identify pertinent drawing sheet and detail number, and specification section number, as appropriate. Identify deviations from contract documents.

C. Submit initial progress schedules, AF Form 3064, in duplicate within 5 working days before commencement of work. After review by contracting officer, revise and resubmit, as required.

D. Government's review will be limited to determinatIon If submittals are in conformance with design concept and general requirements of the project. Approval by the Contracting Officer shall not absolve the contractor from his responsibilities for specific performance of the item or items submitted.

E. Submittals shall be accepted only from the contractor (not subcontractor or material supplier), who shall check submittals for completeness, accuracy for construction purposes, and conformance with contract requirements and shall indicate his approval on each submittal.

TRAVIS AFB - SABER

1.3 CONSTRUCTION PROGRESS SCHEDULE

Contract FA4427-1O-R-0102

A. This schedule is required on delivery orders with performance periods greater than sixty days or at the discretion of the contracting officer. The Progress Schedule, AF Form 3064 shall consist of a minimwn of one work element for each division of the specification except Division One.

B. Progress schedule submitted shall address the CSI 2004 Masterformat.

C. Work shall be scheduled such that, upon start of construction, work progresses in a continuous and diligent manner. A schedule which does not reflect steady and reasonable progress throughout the construction period shall be rejected.

1.4 SHOP DRAWINGS

A. When reqUired by individual specification sections, submit the nwnber of opaque reproductions the contract requires, plus 3 copies which will be retained by the Government.

Drawings shall be submitted upon delivery order completion.

B. Shop drawings shall be prepared by persons competent and experienced in the trade involved. Drafting skill is not a requirement but accuracy and completeness are. Drawings shall reflect field measurements and conditions and shall show the relationship of the item to adjacent materials.

1.5 PRODUCT DATA

A. When required by individual specification sections submit, in duplicate, product data that indicate compliance to listed standards.

B.Mark each copy to identify applicable products, models, options, and other data;

supplement manufacturers' standard data to provide information unique to the work. Include manufacturers' installation instructions when required by the specification section.

C. Trade names of specific products used in this specification are used for purposes of defining general quality and performance. They are not used to preclude the use of products of equal characteristics by other manufacturers. The Government reserves the right to determine equality.

D. The contractor shall submit to the Government with any request for approval of substitutions, complete data including performance and chemical makeup for both the specified and proposed item.

1.6 SAMPLES

A. When required by individual specification sections, submit samples that fully illustrate functional characteristics of the product, complete with integral parts and attachments.

TRAVIS AFB -SABER e. t,ntract FA4427-10-R-OI02

B. Include identification on each sample, giving full information.

C. Samples will be retained by the contracting officer except in those instances, where the specifications permit use of the sample in the actual work.

D. Provide field finishes at project as required by individual specifications section. Install sample complete and finished. Acceptable finishes in place may be retained in completed work.

1.7 MATERIAL LISTS

A. The Contractor shall supply material safety data sheets to the SABER inspector on all hazardous materials to be used on this project. No hazardous material will be used on this project until the material safety data sheets have been reviewed and approved by the Air Force. The Contractor will maintain the approved material data sheets on the job site at a central location until the completion of the project. All contractor personnel will be advised of the material safety data sheet location. -