1-2 ATCH 1 SPECS TABLE OF CONTENTS 10-R-0102 SABER 26 APR 10.pdf
PDF 119 KB Posted
- Solicitation number
- FA4427-10-R-0102
About this file
1-2 ATCH 1 SPECIFICATION TABLE OF CONTENTS
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRAVIS AFB - SABER
TABLE OF CONTENTS
Contract FA4427-1 O-R-O102
SECTION 01010 GENERAL REQUIREMENTS ........................................••
SECTION 01030 METRIC MEASUREMENTS 25
SECTION 01031 INTERFACING OF NEW AND EXISTING WORK 27
SECTION 01040 COORD INATI0N 30
SECTION 01045 CUTTING AND PATCHING 39
SECTION 01060 REGULA TORY REQUIREMENTS 42
SECTION 01090 REFERENCE STANDARDS 43
SECTION 01100 SPECIAL PROJECT PROCEDURES 69
SECTION 01300 DELIVERY 0RD ER PROPOSALS , 75
SECTION 0130 1 SUBMITTALS 88
SECTION 01400 QUALITY CONTROL 91
SECTION 01410 TESTING LABORATORY SERVICES 93
SECTION 01440 CONTRA CTO R' S QUALITY CO NTR 0L 96
SECTION 01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 107
SECTION 01560 ENVIRONMENTAL GENERAL REQUIREMENTS 139
SECTION 01570 175
TRAFFIC REGULATION 175
SECTION 01600 MATERIAL AND EQUIPMENT 177
SECTI ON 01650 STARTING OF SYSTEMS 182
SECTION 01660 TESTING, ADJUSTING, AND BALANCING OF SYSTEMS 185
SECTION 01700 DELIVERY ORDER CLOSE OUT 187
SECTION 01800 SPECIAL CONDITIONS 197
1. 02 - EXISTING CO ND ITIO NS 20 1
2. 03 - CON CRE TE ; 202
3. 04 - MASONRy , 203
4. 05 - ME TALS 204
5. 06 - WOOD, PLASTICS AND COMPOSITES 205
6. 07- THERMAL AND MOISTURE PROTECTION 206
7. 08 - OPE NIN GS 207
8. 09- FINISHES 208
9. 10- SPECIALTIES 209
10. 11- EQUIPMENT ; 210
11. 12- FURNISHINGS 211
12. 13- SPECIAL CONSTRUCTION ...............................................................................................•
TRAVIS AFB - SABER Contract FA4427-1O-R-O102
13. 14- CO NVE YIN G EQ UIPMENT ~ 213
14. 15- RESERVED 214
15. 16- RESERVED 215
16. 17- RESERVED 216
17. 18 - RESERVE D 217
18. 19 - RESERVED 218
19. 20 - RESERVED 219
20. 21 - FIRE SUPPRESSION 220
21. 22 - PLUMBING 221
22. 23 - HEATING VENTILATING AND AIR CONDITIONING 222
23. 24 - RESERVED ~ 223
24. 25 - INTEGRATED AUTOMATION 224
25. 26 - ELECTRICAL ,...........................•.................•
26. 27 - COMMUNICATIONS 226
27. 28 - ELECTRONIC SAFETY AND SECURITY 227
28. 29 - RESERVED 228
29. 30 - RESERVED 229
30. 31 - EARTHWORK 230
31. 32 - EXTERI OR IMPROVEMENTS 231
32. 33 - UTILITIES ; 232
33. 34 - TRANSPORTATION 233
34. 35 - WATERWAY & MARINE CONSTRUCTION 234
35. 36 - RESERVED 235
36. 37 - RES ERVE D ......................................................................•
37. 38 _ RESERVED 237
38. 39 - RESERVED 238
39. 40 - PROCESS INTEGRA TION 239
40. 41 _ MATERIAL PROCESSING & HANDLING EQUIPMENT 240
41. 42 - PROCESS HEATING COOLING & DRYING EQUIPMENT 241
42. 43 _ PROCESS GAS & LIQUID HANDLING PURIFICA nON & STORAGE EQUIPMENT 242
43. 44 _ POLLUTION CONTROL EQUIPMENT 243
44. 45 - INDUSTRY SPECIFIC MANUFACTURING EQUIPMENT 244
45. 46 _ RESERVED 245
46. 47 _ RESERVED 246
47. 48 _ ELECTRICAL POWER GENERATION 247
48. 49 - RES ER VE D 248
APPENDIX A SUPPORT EQUIPMENT SPECIFICATIONS A-1
TRAVIS AFB - SABER
This page intentionally left blank
Contract FA4427-10-R-OI02
File details come from the government source that posted it. Updated .