3-6 ATCH 2 SCHEDULE OF DRAWINGS 10-R-0102 SABER.pdf

PDF 70 KB Posted

Attached to
Simplified Acquisition Base Engineer Requirements (SABER)
Solicitation number
FA4427-10-R-0102
Issued by

About this file

3-6 ATCH 2 SCHEDULE OF DRAWINGS INDEX (DRAWINGS WILL BE UPLOADED SEPARATELY)

View the file

Other files

File Type Posted
10-R-0102 Questions Answers 2.pdf PDF
Pre-Bid Conference Site Visit Attendee List.pdf PDF
DSC_0688.JPG JPG image
DSC_0685.JPG JPG image
DSC_0684.JPG JPG image
DSC_0690.JPG JPG image
DSC_0687.JPG JPG image
DSC_0686.JPG JPG image
DSC_0689.JPG JPG image
DSC_0693.JPG JPG image
DSC_0691.JPG JPG image
Updated 4-1 ATCH 7 Past Performance Questionnaire 10-R-0102 SABER.pdf PDF
10-R-0102 SABER Questions Answers 1.pdf PDF
FA4427-10-R-0102-0001 SABER Solicitation.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 14.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 33-34.pdf PDF
D3-6 DRAWING 27 —
D4-4 DRAWING 35 —
D3-8 DRAWING 29 —
D4-1 DRAWING 32 —
D3-4 DRAWING 25 —
D4-2 DRAWING 33 —
D4-0 DRAWING 31 —
D3-1 DRAWING 22 —
D3-9 DRAWING 30 —
D4-6 DRAWING 37 —
D3-3 DRAWING 24 —
D2-9 DRAWING 20 —
D3-2 DRAWING 23 —
D4-5 DRAWING 36 —
D3-7 DRAWING 28 —
D2-8 DRAWING 19 —
D3-5 DRAWING 26 —
D4-3 DRAWING 34 —
D3-0 DRAWING 21 —
D2-2 DRAWING 13 —
D2-0 DRAWING 11 —
D1-7 DRAWING 8 —
D2-1 DRAWING 12 —
D2-5 DRAWING 16 —
D1-2 DRAWING 3 —
D1-4 DRAWING 5 —
D1-1 DRAWING 2 —
D2-3 DRAWING 14 —
D1-6 DRAWING 7 —
D1-3 DRAWING 4 —
D2-6 DRAWING 17 —
D2-7 DRAWING 18 —
D2-4 DRAWING 15 —
D1-0 DRAWING 1 —
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule of Drawings

Upgrade Fire Alarm System, Bldg 31 (XDAT 08-1128)

Travis AFB, CA94535

13-Apr-l0

DRAWING # TITLE SHEET DATE

1 Fire Protection Plan F-1 /18 of 25 2-Sep-08

2 1st and 2nd Floor Plans A-1/18 of 102 18-Aug-89

3 1st Floor Plan North A-2/19 of 102 18-Aug-89

4 1st Floor Plan South A-3/20 of 102 18-Aug-89

5 2nd Floor Plan A-4/21 of 102 18-Aug-89

6 First Floor Reflected Plan North A-5/22of 102 18-Aug-89

7 Frist Floor Reflected Plan South A6/23 of 102 18-Aug-89

8 Second Floor Reflected plan A7/24 of 102 18-Aug-89

9 Exterior Elevations A8/25 of 102 18-Aug-89

10 Exterior Elevations A9/26 of 102 18-Aug-89

11 Building Sections I A10/27 of 102 18-Aug-89

12 Building Sections All/28 of 102 18-Aug-89

13 Roof Plan A12/29 of 102 18-Aug-89

14 Foundantion Plan North S2/47 Of 102 18-Aug-89

15 Foundation Plan South S3/48 of 102 18-Aug-89

16 2nd Floor Framing Plan S4/49 of 102 18-Aug-89

17 Roof Framing Plan North , S5/50 of 102 18-Aug-89

18 Roof Framing Plan South 56/51 of 102 18-Aug-89

19 Sections & Details S7/52 of 102 18-Aug-89

20 Sections & Details S8/53 of 102 18-Aug-89

21 Electrical Site Plan E4/78 of 102 18-Aug-89

22 Lighting Floor plan North E5/79 of 102 18-Aug-89

23 Lighting Floor Plan South E6/80 of 102 18-Aug-89

24 Lighting Plan 2nd Floor E7/81 of 102 18-Aug-89

25 Power & Signal Floor Plan North E8/82 of 102 18-Aug-89

26 Power & Signal Floor Plan South E9/83 of 102 18-Aug-89

27 Power & Signal Plan 2nd Floor E10/84 of 102 18-Aug-89

28 Fire Alarm Floor Plan North Ell/85 Of 102 18-Aug-89

29 Fire alarm FloorPlan South E12/86 of 102 18-Aug-89

30 Frire Alarm Plan 2nd Floor E13/87 of 102 18-Aug-89

31 One Line Diagram E14/88 of 102 18-Aug-89

32 Fire Sprinkler System Roof Piping North S of 6 22-May-87 33 Fire Sprinkler system Roof Piping South 60f6 22-May-87 34 Fire Sprinkler System First Floor Perimeter 10f6 22-May-87 3S Fire Sprinkler System Frist Floor Perimeter 20f6 22-May-87 36 Fire Sprinkler system Frirst Floor Perimeter 20f6 22-May-87 37 Bldg 31 Floor Plan 1 of 1 30-Jan-06

File details come from the government source that posted it. Updated .