3-6 ATCH 2 SCHEDULE OF DRAWINGS INDEX (DRAWINGS WILL BE UPLOADED SEPARATELY)
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Drawings
Upgrade Fire Alarm System, Bldg 31 (XDAT 08-1128)
Travis AFB, CA94535
13-Apr-l0
DRAWING # TITLE SHEET DATE
1 Fire Protection Plan F-1 /18 of 25 2-Sep-08
2 1st and 2nd Floor Plans A-1/18 of 102 18-Aug-89
3 1st Floor Plan North A-2/19 of 102 18-Aug-89
4 1st Floor Plan South A-3/20 of 102 18-Aug-89
5 2nd Floor Plan A-4/21 of 102 18-Aug-89
6 First Floor Reflected Plan North A-5/22of 102 18-Aug-89
7 Frist Floor Reflected Plan South A6/23 of 102 18-Aug-89
8 Second Floor Reflected plan A7/24 of 102 18-Aug-89
9 Exterior Elevations A8/25 of 102 18-Aug-89
10 Exterior Elevations A9/26 of 102 18-Aug-89
11 Building Sections I A10/27 of 102 18-Aug-89
12 Building Sections All/28 of 102 18-Aug-89
13 Roof Plan A12/29 of 102 18-Aug-89
14 Foundantion Plan North S2/47 Of 102 18-Aug-89
15 Foundation Plan South S3/48 of 102 18-Aug-89
16 2nd Floor Framing Plan S4/49 of 102 18-Aug-89
17 Roof Framing Plan North , S5/50 of 102 18-Aug-89
18 Roof Framing Plan South 56/51 of 102 18-Aug-89
19 Sections & Details S7/52 of 102 18-Aug-89
20 Sections & Details S8/53 of 102 18-Aug-89
21 Electrical Site Plan E4/78 of 102 18-Aug-89
22 Lighting Floor plan North E5/79 of 102 18-Aug-89
23 Lighting Floor Plan South E6/80 of 102 18-Aug-89
24 Lighting Plan 2nd Floor E7/81 of 102 18-Aug-89
25 Power & Signal Floor Plan North E8/82 of 102 18-Aug-89
26 Power & Signal Floor Plan South E9/83 of 102 18-Aug-89
27 Power & Signal Plan 2nd Floor E10/84 of 102 18-Aug-89
28 Fire Alarm Floor Plan North Ell/85 Of 102 18-Aug-89
29 Fire alarm FloorPlan South E12/86 of 102 18-Aug-89
30 Frire Alarm Plan 2nd Floor E13/87 of 102 18-Aug-89
31 One Line Diagram E14/88 of 102 18-Aug-89
32 Fire Sprinkler System Roof Piping North S of 6 22-May-87 33 Fire Sprinkler system Roof Piping South 60f6 22-May-87 34 Fire Sprinkler System First Floor Perimeter 10f6 22-May-87 3S Fire Sprinkler System Frist Floor Perimeter 20f6 22-May-87 36 Fire Sprinkler system Frirst Floor Perimeter 20f6 22-May-87 37 Bldg 31 Floor Plan 1 of 1 30-Jan-06