1-7 ATCH 1 SPECS 01045 10-R-0102 SABER.pdf

PDF 84 KB Posted

Attached to
Simplified Acquisition Base Engineer Requirements (SABER) Federal contract opportunity
Solicitation number
FA4427-10-R-0102
Issued by
Department of the Air Force Air Mobility Command

About this file

1-7 ATCH 1 SPECIFICATIONS 01045

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition Base Engineer Requirements (SABER), newest first.
File Type Posted
DSC_0687.JPG JPG image
DSC_0691.JPG JPG image
DSC_0689.JPG JPG image
DSC_0686.JPG JPG image
DSC_0693.JPG JPG image
10-R-0102 SABER Questions Answers 1.pdf PDF
FA4427-10-R-0102-0001 SABER Solicitation.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 14.pdf PDF
D4-2 DRAWING 33 —
D3-4 DRAWING 25 —
D4-0 DRAWING 31 —
D3-1 DRAWING 22 —
D4-6 DRAWING 37 —
D3-2 DRAWING 23 —
D4-5 DRAWING 36 —
D3-8 DRAWING 29 —
D4-4 DRAWING 35 —
D4-1 DRAWING 32 —
D3-9 DRAWING 30 —
D2-9 DRAWING 20 —
D2-5 DRAWING 16 —
D2-1 DRAWING 12 —
D1-1 DRAWING 2 —
D1-4 DRAWING 5 —
D1-3 DRAWING 4 —
D2-6 DRAWING 17 —
D1-7 DRAWING 8 —
D2-3 DRAWING 14 —
D2-4 DRAWING 15 —
D1-2 DRAWING 3 —
3-0 ATCH 1 SPECS 01650 10-R-0102 SABER.pdf PDF
1-4 ATCH 1 SPECS 01030 10-R-0102 SABER.pdf PDF
1-1 ATCH 1 SPECS COVER PAGE 10-R-0102 SABER 26 APR 10.pdf PDF
1-0 FA4427-10-R-0102 SABER SOLICITATION 7 MAY 2010.pdf PDF
2-2 ATCH 1 SPECS 01301 10-R-0102 SABER.pdf PDF
3-3 ATCH 1 SPECS 01800 10-R-0102 SABER.pdf PDF
2-0 ATCH 1 SPECS 01100 10-R-0102 SABER.pdf PDF
4-1 ATCH 7 Past Performance Questionnaire 10-R-0102 SABER.pdf PDF
3-4 ATCH 1 SPECS DIV 02 thru 25 10-R-0102 SABER.pdf PDF
3-9 ATCH 5 SEED PROJECT SCOPE 10-R-0102 SABER 26APR10.pdf PDF
2-6 ATCH 1 SPECS 01500 10-R-0102 SABER.pdf PDF
1-6 ATCH 1 SPECS 01040 10-R-0102 SABER.pdf PDF
2-7 ATCH 1 SPECS 01560 10-R-0102 SABER.pdf PDF
1-5 ATCH 1 SPECS 01031 10-R-0102 SABER.pdf PDF
3-5A ATCH 1 SPECS SUPPORT EQUIPMENT 10-R-0102 SABER.pdf PDF
3-7 ATCH 3 WAGE DETERMINATION APPLICABILITY 10-R-0102 SABER.pdf PDF
3-8 ATCH 4 SCHEDULE OF MATERIAL SUBMITTALS 10-R-0102 SABER.pdf PDF
3-1 ATCH 1 SPECS 01660 10-R-0102 SABER.pdf PDF
4-0 ATCH 6 Cost Estimate Worksheet for Seed Project 10-R-0102 SABER.pdf PDF
2-3 ATCH 1 SPECS 01400 10-R-0102 SABER.pdf PDF
Show all 50

Simplified Acquisition Base Engineer Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAVIS AFB - SABER

SECTION 01045

CUTTING AND PATCHING

1. GENERAL

1.1. Requirements Included.

1.1.1. Requirements and limitations for cutting and patching of Work.

1.2. Related Requirements.

1.2.1. Section 01010 - Summary of Work.

1.2.2. SectiOIi0 to31 - Interfacing of New and Existing Work.

Contract FA4427-to-R-OI02

1.3. Description: Execute cutting, fitting, and patching, including excavation and fill, to complete work, and to:

1.3.1. Fit the several parts together, to integrate with other work.

1.3.2. Uncover existing work to install new work.

1.3.3. Remove and replace defective and nonconforming work.

1.3.4. Remove samples of existing work for testing.

1.3.5. Provide openings in nonstructural elements for penetrations of mechanical and electrical work.

1.4. Submittals

1.4.1. Submit written request in advance of cutting or alteration which affects:

1.4.1.1.

1.4.1.2.

1.4.1.3.

1.4.1.4.

1.4.1.5.

Structural integrity of any element of project.

Integrity of weather-exposed or moisture-resistant element.

Efficiency, maintenance, or safety of any operational element.

Visual qualities of sight-exposed elements.

Work of Government or separate contractor.

TRAVIS AFB _SABER e

1.4.2 Include in request:

1.4.2.1. Identification of project.

1.4.2.2. Location and description of affected work.

1.4.2.3. Necessity for cutting or alteration.

t,ntract FA4427-1O-R-0102

1.4.2.4. Description of proposed work, and products to be used.

1.4.2.5. Alternatives to cutting and patching.

1.4.2.6. Effect on work ofGovemment or separate contractor.

1.4.2.7. Date and time work will be executed.

2. PRODUCTS

2.1 Materials.

2.1.1 Same material as original installation.

2.1.2. For any change in materials, submit request for substitution in accordance with Section 01300.

3. EXECUTION.

3.1 Inspection.

3.1.1. Inspect existing conditions, including elements subject to damage or movement during cutting and patching.

3.1.2. After uncovering, inspect conditions affecting performance of work.

3.1.3. Beginning of cutting or patching means acceptance of existing conditions.

3.2 Preparation.

3.2.1. Provide supports to assure structural integrity of surroundings. Also provide devices and methods to protect other portions of project from damage.

3.2.2. Provide protection from elements for areas which may be exposed by work; maintain excavations free of water.

TRAVIS AFB - SABER

3.3 Performance.

Contract FA4427-10-R-0102

3.3.1. Execute work by methods to avoid damage to other work, and which will provide proper surfaces to receive patching and finishing.

3.3.2. Restore damages with new products in accordance with contract requirements.

3.3.3. Refinish surfaces to match adjacent finishes. For continuous surfaces, refinish to nearest intersections for an assembly, refinish entire unit.

3.3.4. Ensure compatibility to base design.