3-5 ATCH 1 SPECS DIV 26 thru 49 10-R-0102 SABER.pdf

PDF 603 KB Posted

Attached to
Simplified Acquisition Base Engineer Requirements (SABER) Federal contract opportunity
Solicitation number
FA4427-10-R-0102
Issued by
Department of the Air Force Air Mobility Command

About this file

3-5 ATCH 1 SPECIFICATIONS DIV 26 THRU 49

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition Base Engineer Requirements (SABER), newest first.
File Type Posted
10-R-0102 Questions Answers 2.pdf PDF
Pre-Bid Conference Site Visit Attendee List.pdf PDF
DSC_0684.JPG JPG image
DSC_0688.JPG JPG image
DSC_0685.JPG JPG image
DSC_0690.JPG JPG image
DSC_0687.JPG JPG image
Updated 4-1 ATCH 7 Past Performance Questionnaire 10-R-0102 SABER.pdf PDF
FA4427-10-R-0102-0001 SABER Solicitation.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 14.pdf PDF
FA4427-10-R-0102 SABER Solitication Pg 33-34.pdf PDF
D3-3 DRAWING 24 —
D3-6 DRAWING 27 —
D3-0 DRAWING 21 —
D3-7 DRAWING 28 —
D2-8 DRAWING 19 —
D4-3 DRAWING 34 —
D3-5 DRAWING 26 —
D4-2 DRAWING 33 —
D3-4 DRAWING 25 —
D4-0 DRAWING 31 —
D1-2 DRAWING 3 —
D1-6 DRAWING 7 —
D2-7 DRAWING 18 —
D1-9 DRAWING 10 —
D1-8 DRAWING 9 —
D1-5 DRAWING 6 —
D1-0 DRAWING 1 —
D2-2 DRAWING 13 —
D2-0 DRAWING 11 —
D2-5 DRAWING 16 —
D2-1 DRAWING 12 —
D1-1 DRAWING 2 —
1-9 ATCH 1 SPECS 01090 10-R-0102 SABER.pdf PDF
1-2 ATCH 1 SPECS TABLE OF CONTENTS 10-R-0102 SABER 26 APR 10.pdf PDF
2-9 ATCH 1 SPECS 01600 10-R-0102 SABER.pdf PDF
4-2 ATCH 8 Subcontractor Teaming Consent Form 10-R-0102 SABER.pdf PDF
1-7 ATCH 1 SPECS 01045 10-R-0102 SABER.pdf PDF
4-3 ATCH 9 Government Furnished Property Info 10-R-0102 SABER.pdf PDF
4-0 ATCH 6 Cost Estimate Worksheet —
3-2 ATCH 1 SPECS 01700 10-R-0102 SABER.pdf PDF
1-3 ATCH 1 SPECS 01010 10-R-0102 SABER.pdf PDF
2-1 ATCH 1 SPECS 01300 10-R-0102 SABER.pdf PDF
2-5 ATCH 1 SPECS 01440 10-R-0102 SABER.pdf PDF
1-8 ATCH 1 SPECS 01060 10-R-0102 SABER.pdf PDF
2-4 ATCH 1 SPECS 01410 10-R-0102 SABER.pdf PDF
2-8 ATCH 1 SPECS 01570 10-R-0102 SABER.pdf PDF
3-6 ATCH 2 SCHEDULE OF DRAWINGS 10-R-0102 SABER.pdf PDF
3-0 ATCH 1 SPECS 01650 10-R-0102 SABER.pdf PDF
1-4 ATCH 1 SPECS 01030 10-R-0102 SABER.pdf PDF
Show all 50

Simplified Acquisition Base Engineer Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAVIS AFB - SABER Contract FA4427-1O-R-OI02

25. 26 - ELECTRICAL

25.1. 26 00 00 - ELECTRICAL

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Electrical and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - ELECTRICAL

http://www.wbdg.org/ccb/browse

TRAVIS AFB - SABE' e Contract FA4427-1O-R-OI02

26. 27 - COMMUNICATIONS

26.1. 27 00 00 - COMMUNICATIONS

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Communications and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - COMMUNICATIONS

TRAVIS AFB - SABER Contract FA4427-1O-R-O102

27. 28-ELECTRONIC SAFETY AND SECURITY

27.1. 28 00 00 - ELECTRONIC SAFETY AND SECURITY

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Electronic Safety & Security and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www. wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - ELECTRONIC SAFETY AND SECURITY

TRAVIS AFB - SAB'~ - Contract FA4427-1 O-R-Ol02

28. 29 - RESERVED

28.1. 290000 - RESERVED

F. GENERAL

(l) UNIFIED FACILITY GUIDE SPECIFICA nONS (UFGS) All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED

TRAVIS AFB - SABER ,Contract FA4427-lO-R-O102

29. 30 - RESERVED

29.1. 3000 00 - RESERVED

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide SpecifiGations are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building DesignGuide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED

TRAVIS AFB - SAB. e Contract FA4427-1 O-R-O102

30. 31 - EARTHWORK

30.1. 31 0000 - EARTHWORK

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Earthwork and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - EARTHWORK

TRAVIS AFB - SABER. Contract FA4427-1O-R-0102

31. 32 - EXTERIOR IMPROVEMENTS

31.1. 320000 - EXTERIOR IMPROVEMENTS

F. GENERAL

(l) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) All standard UFGS specifications, pertaining to Exterior Improvements and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building. Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - EXTERIOR IMPROVEMENTS

TRAVIS AFB - SAB' Contract FA4427-10-R-0102

32. 33 - UTILITIES

32.1. 330000 - UTILITIES

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Utilities and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccblbrowse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - Ul'ILITIES http://www.wbdg.org/ccblbrowse

33. 34-TRANSPORTATION

33.1. 340000- TRANSPORTATION

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS spec:ifications, pertaining to Transportation and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide: Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide: Specifications at http://www. wbdg.org/ccblbrowse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - TRANSPORTATION

TRAVIS AFB - SABI~ e Contract FA4427-1O-R-0102

34. 35 - WATERWAY & MARINE CONSTRUCTION

34.1. 350000 - WATERWAY & MARINE CONSTRUCTION

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Waterway & Marine Construction and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www. wbdg.org/ccblbrowse org.php?0=70.

G. .PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - WATERWAY & MARINE CONSTRUCTION

35. 36 - RESERVED

35.1. 36 0000 - RESERVED

F. GENERAL

(I) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specific:ations are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications, at http://www.wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED

TRAVIS AFB - SAB' fit Contract FA4427-1O-R-0102

36. 37 - RESERVED

36.1. 37 00 00 - RESERVED

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The.

Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccblbrowse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED

37. 38 - RESERVED

37.1. 380000 - RESERVED

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICA nONS (UFGS) All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specific:ations are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED

TRAVIS AFB - SAB' e Contract FA4427-10-R-0102

38. 39 - RESERVED

38.1. 39 00 00 - RESERVED

F. GENERAL

(I) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version ofthe Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED

39. 40 - PROCESS INTEGRATION

39.1. 40 00 00 - PROCESS INTEGRATION

F. GENERAL

(l) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) All standard UFGS specifications, pertaining to Process Integration and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - PROCESS INTEGRATION

""'"'--- -- -.--------- """"' ••••su_

TRAVIS AFB - SABI

1 e Contract FA4427-1O-R-OI02

40. 41- MATERIAL PROCESSING & HANDLING EQUIPMENT

40.1. 41 00 00 - MATERIAL PROCESSING & HANDLING EQUIPMENT

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Material Processing & Handling Equipment and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www. wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H.EXECUTION (Not Used)

END OF SECTION - MATERIAL PROCESSING & HANDLING EQUIPMENT

TRAVIS AFB - SABER Contract FA4427-1 O-R-OI02

41. 42 - PROCESS HEATING COOLING & DRYING EQUIPMENT

41.1. 420000 - PROCESS HEATING COOLING & DRYING EQUIPMENT

F. GENERAL

(l) uNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) All standard UFGS specifications, pertaining to Process Heating Cooling & Drying Equipment and applicable to the scope of effort identified in each Delivery Order, in the most recent version ofthe Unified Facilities Guide Specifications are incorporated into this specification by reft:rence. The Contractor may download the latest version of these specifications for free fromthe Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/cc:b/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - PROCESS HEATING COOLING & DRYING EQUIPMENT

'--_"""""_-- ••••••• ••••••••------------------~------------~ .._w http://www.wbdg.org/cc:b/browse

TRAVIS AFB - SAB' e Contract FA4427-1O-R-0102

42. 43 - PROCESS GAS & LIQUID HANDLING PURIFICATION & STORAGE

EQUIPMENT

42.1. 43 00 00 - PROCESS GAS & LIQUID HANDLING PURIFICATION &

STORAGE EQUIPMENT

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Process Gas & Liquid Handling Purification & Storage Equipment and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www. wbdg.org/ccblbrowse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - PROCESS GAS & LIQUID HANDLING PURIFICATION &

STORAGE EQUIPMENT

TRAVIS AFB - SABER Contract FA4427-1O-R-0102

43. 44 - POLLUTION CONTROL EQUIPMENT

43.1. 44 00 00 - POLLUTION CONTROL EQUIPMENT

F. GENERAL

(l) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) All standard UFGS specifications, pertaining to Pollution Control Equipment and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccblbrowse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - POLLUTION CONTROL EQUIPMENT

, II

TRAVIS AFB - SAB e Contract FA4427-1 O-R-O102

44. 45 - INDUSTRY SPECIFIC MANUFACTURING EQUIPMENT

44.1. 45 00 00 - INDUSTRY SPECIFIC MANUFACTURING EQUIPMENT

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UfGS specifications, pertaining to Industry Specific Manufacturing Equipment and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www. wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - INDUSTRY SPECIFIC MANUFACTURING EQUIPMENT

TRAVIS APB - SABER Contract FA4427-1O-R-0102

45. 46 - RESERVED

45.1. 460000 - RESERVED

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED

TRAVIS AFB - SABI e Contract FA4427-1O-R-OI02

46. 47 - RESERVED

46.1. 47 00 00 - RESERVED

F. GENERAL

. (l) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccb/browse org.php?0=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED

47. 48 - ELECTRICAL POWER GENERATION

47.1. 48 00 00 - ELECTRICAL POWER GENERATION

F. GENERAL

(1) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS)

All standard UFGS specifications, pertaining to Electrical Power Generation and .applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www. wbdg.org/ccblbrowse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - ELECTRICAL POWER GENERATION

TRAVIS AFB - SAB' • Contract FA4427-10-R-0102

48. 49 - RE~ERVED

48.1. 49 00 00 - RESERVED

F. GENERAL

(l) UNIFIED FACILITY GUIDE SPECIFICATIONS (UFGS) All standard UFGS specifications, pertaining to Reserved and applicable to the scope of effort identified in each Delivery Order, in the most recent version of the Unified Facilities Guide Specifications are incorporated into this specification by reference. The Contractor may download the latest version of these specifications for free from the Whole Building Design Guide, Construction Criteria Base Web Site for the Unified Facilities Guide Specifications at http://www.wbdg.org/ccblbrowse org.php?o=70.

G. PRODUCTS (Not Used)

H. EXECUTION (Not Used)

END OF SECTION - RESERVED