2-8 ATCH 1 SPECIFICATIONS 01570

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition Base Engineer Requirements (SABER), newest first.
File Type Posted
10-R-0102 Questions Answers 2.pdf PDF
DSC_0689.JPG JPG image
DSC_0686.JPG JPG image
DSC_0693.JPG JPG image
DSC_0690.JPG JPG image
DSC_0687.JPG JPG image
Updated 4-1 ATCH 7 Past Performance Questionnaire 10-R-0102 SABER.pdf PDF
10-R-0102 SABER Questions Answers 1.pdf PDF
D3-8 DRAWING 29 —
D4-4 DRAWING 35 —
D4-1 DRAWING 32 —
D3-9 DRAWING 30 —
D2-9 DRAWING 20 —
D3-0 DRAWING 21 —
D3-7 DRAWING 28 —
D2-8 DRAWING 19 —
D4-3 DRAWING 34 —
D3-5 DRAWING 26 —
D4-2 DRAWING 33 —
D3-4 DRAWING 25 —
D1-7 DRAWING 8 —
D2-3 DRAWING 14 —
D2-4 DRAWING 15 —
D1-9 DRAWING 10 —
D1-8 DRAWING 9 —
D1-5 DRAWING 6 —
D1-0 DRAWING 1 —
D2-2 DRAWING 13 —
D2-0 DRAWING 11 —
D2-5 DRAWING 16 —
D2-1 DRAWING 12 —
3-9 ATCH 5 SEED PROJECT SCOPE 10-R-0102 SABER 26APR10.pdf PDF
2-6 ATCH 1 SPECS 01500 10-R-0102 SABER.pdf PDF
1-6 ATCH 1 SPECS 01040 10-R-0102 SABER.pdf PDF
2-7 ATCH 1 SPECS 01560 10-R-0102 SABER.pdf PDF
1-5 ATCH 1 SPECS 01031 10-R-0102 SABER.pdf PDF
3-5A ATCH 1 SPECS SUPPORT EQUIPMENT 10-R-0102 SABER.pdf PDF
3-7 ATCH 3 WAGE DETERMINATION APPLICABILITY 10-R-0102 SABER.pdf PDF
3-8 ATCH 4 SCHEDULE OF MATERIAL SUBMITTALS 10-R-0102 SABER.pdf PDF
3-1 ATCH 1 SPECS 01660 10-R-0102 SABER.pdf PDF
4-0 ATCH 6 Cost Estimate Worksheet for Seed Project 10-R-0102 SABER.pdf PDF
2-3 ATCH 1 SPECS 01400 10-R-0102 SABER.pdf PDF
2-1 ATCH 1 SPECS 01300 10-R-0102 SABER.pdf PDF
2-5 ATCH 1 SPECS 01440 10-R-0102 SABER.pdf PDF
1-8 ATCH 1 SPECS 01060 10-R-0102 SABER.pdf PDF
2-4 ATCH 1 SPECS 01410 10-R-0102 SABER.pdf PDF
3-5 ATCH 1 SPECS DIV 26 thru 49 10-R-0102 SABER.pdf PDF
3-6 ATCH 2 SCHEDULE OF DRAWINGS 10-R-0102 SABER.pdf PDF
3-0 ATCH 1 SPECS 01650 10-R-0102 SABER.pdf PDF
1-4 ATCH 1 SPECS 01030 10-R-0102 SABER.pdf PDF
Show all 50

Simplified Acquisition Base Engineer Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRAVIS APB - SABER

SECTION 01570

TRAFFIC REGULATION

1. GENERAL

1.1 REQUIREMENTS INCLUDED

Contract FA4427-1 O-R-O102

1.1.1. Provide, operate and maintain equipment, services and personnel, with traffic control and protectiye devices, as required to expedite vehicular traffic flow on haul routes, at site entrances, on-site access roads, and parking areas.

1.1.2. Remove temporary equipment and facilities when no longer required, restore grounds to original, or to specified conditions.

1.2 APPROVAL OF STREET CLOSURES OR BLOCKAGES

1.2.1. All proposed street closures and blockages must be approved by the contracting officer at least 3 weeks in advance.

1.3 TRAFFIC SIGNALS AND SIGNS

1.3.1. Provide and operate traffic control and directional signals required to direct and maintain an orderly flow of traffic in all areas under contractor's control, or affected by contractor's operations.

1.3.2. Provide traffic control and directional signs, mounted on barricades or standard posts:

1. At each change of direction of a roadway and at each crossroad.

2. At detours.

3. At parking areas.

1.3.3. All traffic control requirements shall be coordinated through the Base Fire Department, Base Security Police, and Base Safety Office.

1.4 FLAGMEN

1.4.1. Provide qualified and suitably equipped flagmen when (construction operations encroach on traffic lanes, or as) required for regulation of traffic.

1.5 LIGHTS

1.5.1. Provide lights during periods of low visibility:

1. To clearly delineate traffic lanes and to guide traffic.

TRAVIS AFB - SABER e

2. For use by flagmen in directing traffic.

'ontract FA4427-10-R-0102

1.5.2. Provide illumination of critical traffic and parking area. No open flame illumination devices of any type will be permitted.

1.6 CONSTRUCTION PARKING CONTROL

1.6.1. Control vehicular parking to preclude interference with public traffic or parking, access by emergency vehicles, government's operations, or construction operations.

1.6.2. Monitor parking of construction personnel's private vehicles:

1. Maintain free vehicular access to and through parking areas.

2. Prohibit parking on or adjacent to access roads, or in non-designated areas.

1.7 HAUL ROUTES

1.7.1. Consult with governing authorities to establish public thoroughfares which will be used as haul routes and site access.

1.7.2. Confine construction traffic to designated haul routes.

1.7.3. Provide traffic control at critical areas of haul routes to expedite traffic flow, to minirnize interference with normal public traffic.