Amend 1 pg pdf.pdf
PDF 119 KB Posted
- Attached to
- Aircraft Corrosion Control Services Federal contract opportunity
- Solicitation number
- FA4427-09-R-0017
About this file
Amendment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B-17 - Amend 0008 - as of 19 Mar 10.pdf | ||
| A-1 - PWS - as of 19 Mar 2010.pdf | ||
| Q A - as of 19 Mar 2010.pdf | ||
| Amend 0007 - as of 12 Mar 2010.pdf | ||
| B-17 - Amend 0006 - 04 Mar 10.pdf | ||
| A-1 - PWS - 24 Feb 2010.pdf | ||
| B-17 - solicitation - as of 21 Dec 09.pdf | ||
| A-1 - PWS - as of 15 Dec 09.pdf | ||
| B-17 - Wage Determination.pdf | ||
| B-17 - PPQ - as of 15 Dec 09.doc | DOC document | |
| B-17 - solicitation - as of 21 Dec 09.pdf | ||
| B-17 - PP - as of 10-09-09.pdf | ||
| B-17 - Amend 0005 - as of 15 Dec 09.pdf | ||
| B-17 - Q A - Ltr to Prospective Offerors - as of 18 Dec 09.pdf | ||
| Amend 0004 - as of 12-14-09.pdf | ||
| Amend 0003 - pdf - extending to 15 Dec 09.pdf | ||
| Amend 0002 - pdf.pdf | ||
| B-17 - Wage Determination.pdf | ||
| A-1 - PWS - 21 Apr 09 - as of 10-09-09.pdf | ||
| solicitation - as of 10-09-09.pdf | ||
| B-17 - PP - as of 10-09-09.pdf | ||
| B-17 - Past Performance Questionnaire - as of 10-09-09.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT T' CONTRA~TID CODE I PAGE OF PAGES
1 I 2
2. AMENDMENT/MODIFICA nON NO. 3. EFFECTIVE DATE 4. REQUISI110N/PURCHASE REQ. NO. 15.PROJECTNo,(IfapPliCable) .
0001 29-OCt-2009
6. ISSUED BY CODE FA4427 7. ADMINISTERED BY (Ifotherthan item6) CODE I 60 CONSlLGCB See Item 6350 HANGARAVE AnN: BERNIEBREEDING 707-424-7734
TRAVISAFBCA94535-2632
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICIT ATION NO.
FA4427-09-R-0017
X 9B. DATED (SEE ITEM I I)
09-OCt-2009 lOA. MOD. OF CONTRACT/ORDER NO.
lOB. DATED (SEE ITEM 13)
CODE IpArn TTV rOOF
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF .SOLICIT ATIONS
GUThe abovenunDered solicitation is amended as set furth in Item 14. The hour and date specified fOrreceipt ofOIli:r o is extended, o is not extended.
Olli:r OIlst acknowledge receipt ofthis amendment prior to the hour and date specified in .the solicitation or as amended by one of the fOllowing methods:
(a) By corq>leting Item; 8 and IS, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer subrritted;---or (c) By separate letter or telegramwhich includes a rererence to the solicitation and amendment nUnDers. FAILURE OF YOURACKNOWLEDGMENTTO BE RECEIVED ATTHE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DA TE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. Ifby virtue of this amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter nnkes reuence to the solicitation and this amendment, and is received priorto the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (Ifrequired)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT /ORDER NO. AS DESCRIBED IN ITEM 14. ,
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM lOA.
B. THE ABOVE NUMBERED CONTRACT /ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor 0 is not, 0 is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENTIMODIFICATION (Organized by UCF section headings, including solicitation/contract suQject matter \\here feasible.)
8eepg 2
Except as provided herein, all teon; and conditions ofthe document rei:renced in Item9A or lOA, as heretofOre changed, remains unchanged and in full fOrceand efli:ct.
ISA. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
ISB. CONTRACTOR/OFFEROR ISC. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY 29-OCt-2009 (Signature of person authorized to sign) (Signature of Contracting Officer)
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) S3.243
FA4427-09-R-0017
Page 2 of2
SECTION SF 30 BLOCK 14 CONTINUATION PAGE:
a. SECTION SF 1449 - CONTINUATION SHEET. SOLICITATION/CONTRACT FORM. The required response date/time has changed from 30-0ct-200904:00 PM to 09-Nov-2009 04:30 PM.
b. Below Questions and answers are provided.
1. QUESTION: In regards to Executive Order # 13495 (Non-displacement Of Qua;lified Workers).
a. Will we be required to offer the current employees employed under this contract employment? ANSWER:
No
b. What is the number of fulltime employees the current contractor has on staff? ANSWER: Unknown
c. What is the number of part time, sub-contractors, or contracted workers on call? ANSWER: Unknown
2. QUESTION: A Vacuum Truck is required per the PWS for all washes outside of the Hangar 811. Is the Vacuum truck government furnished, or is thecontractot require to provide the vacuum truck?
ANSWER: Contractor provided.
3. QUESTION: In the PWS the contractor is required.to provide soap to complete the aircraft washes.
a. Who is the vendor supplying soap? ANSWER: Government provided.
b. How much soap gets used every quarter? ANSWER: Unknown as the amount varies with the number and types of washes required during a given quarter.
4. QUESTION: In the PWS the contractor is required, to provide solventto complete the aircraft washes.
a. Who is the vendor supplying the solvent? ANSWER: Unknown.
b. How much solvent gets used every quarter? ANSWER: Unknown as the amount varies with the number and types of washes required during a given quarter.
5. QUESTION: All contractor supplied equipment (nian-lifts, snorkel lifts) require safety certification every year.
Who conducts the safety/certification ofthe equipment? The base? An outside certifier hired by the contractor? If the base conducts the inspection is there a charge for thi~ service?
ANSWER: Safety/certification of the equipment is the responsibility ofthe contractor
File details come from the government source that posted it. Updated .