Attachment 7 - Additional Photos.pdf
PDF 17 MB Posted
- Attached to
- Boiler Restoration
- Solicitation number
- FA441925Q0015
About this file
This file contains photos documenting a Cleaver Brooks CB Packaged Boiler (Model CB 100-70) located at Building 509. The images show detailed views of the boiler's control panel, electrical components, piping systems, and nameplate specifications.
The boiler, manufactured in 1989, has a maximum pressure rating of 60HW PSI and an input rating of 2,329,000 BTU/HR using natural gas. The electrical specifications show it requires 460V, 3-phase, 60Hz power with a 4.5 amp main power supply. The control system includes flame failure monitoring, load demand control, burner switch, manual flame control, modulating mode selection, fuel valve control, and low water indicators. The photos also document two separate boiler room entrances labeled as "Boiler 1" and "Boiler 2", showing the physical layout and access points for maintenance and service.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional Photos
| boiler 1 controls |
| boiler 1 data plate |
| boiler 1 frontside |
| boiler 1 overview |
| boiler 2 top valves |
| Outside mechroom both boilers |
| boiler 1 controls |
| boiler 1 data plate |
| boiler 1 frontside |
| boiler 2 top valves |
| Outside mechroom both boilers |
File details come from the government source that posted it. Updated .