Attachment 8 - 10K SCAT Tank Requirements (Updated 26 Jun 24).pdf
PDF 149 KB Posted
- Solicitation number
- FA4419-24-Q-0037
About this file
This document contains the requirements and specifications for three (3) standalone 10,000-gallon Secondary Containment Above Ground Storage Tanks (SCATs) to be delivered to Ebbing Air National Guard Base in Fort Smith, Arkansas. The tanks must meet various technical requirements including adherence to UFC 3-460-01 and NFPA 30/30A standards, UL 2085 certification, double-wall design, underneath skid support, "M" class filtration, automatic tank gauge and high-level alarm, turnkey operation with pump and filtration, and specific dimensional and material restrictions.
The related federal contract opportunity, solicitation number FA4419-24-Q-0037, is for the acquisition of these three SCAT tanks. It is being issued by the 97th Contracting Squadron at Altus Air Force Base and will be available only via www.sam.gov. Prospective contractors must be registered in the System for Award Management (SAM) database prior to submitting proposals. The North American Industry Classification System (NAICS) code for this procurement is 332420. Responses to the solicitation are due by 16 May 2024.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirement Owner / Subject Matter Experts:
- Mr. Matt Micklos (HQ AETC/A4RMF (Logistics Readiness Division))
- MSgt Brian Patt (33 FW PIO)
- MSgt Christopher Cooper (188th LRS Fuels)
- POCs will coordinate with AFPET and DLA-E, as necessary.
Recommended Vendors: (From Air Force Petroleum Agency (AFPET):
- Envirosafe (see attached quote) – Meets most requirements listed below.
o https://abovegroundfuelstoragetanks.com/
- Highland Tank o https://www.highlandtank.com/company/
Requirement: THREE (3 EA) standalone 10K GALLON SCATS for issue of Jet A fuel to Air Force R-11 6,000-gallon refueler a/o 7,000 gallon commercial variant that has recently been stock-listed. (All connection points NATO standard as with R-11) meeting specifications below:
Specifications:
THREE (3 EA) standalone 10K GALLON SCATS
‐ DECIDING FACTOR: SINGLE, STANDALONE
‐ REQUIRED: tanks meet and in adherence to UFC 3-460-01, Table 8.1 and
NFPA 30/30A.
‐ REQUIRED: UL 2085 - REQUIRED
‐ REQUIRED: Double wall tanks (eliminates need for containment – thus no
Environment impact) ‐ REQUIRED: Tank must have underneath skid support (not saddles) for equal weight distribution (No ground or soil disruption) ‐ REQURIED: “M” class filtration for additive fuel ‐ REQUIRED: Port for Automatic Tank Gauge (ATG) and install a high-level alarm ‐ REQUIRED: Turnkey operation, to include pump and filtration capability
(only requires power and will have appropriate connection for power hookup) o NOTE: Power has been validated. Three transformers surrounding the compound (350KvA to 500Kva).
‐ REQUIRED: Cannot exceed 40FT LENGTH x 12 FT WIDTH.
‐ REQUIRED: “NO” brass fittings ‐ REQUIRED: Single point of issue from each tank ‐ REQUIRED: Flow Rate for fueling is 300GPM ‐ REQUIRED: 30ft hose length ‐ REQUIRED: Canopy installed over added system components. Must have sufficient clearance to perform maintenance or be easily removed/reinstalled to accommodate system repairs/component replacement.
‐ REQUIRED: Provide a 300 GPM EL 1581 filter/separator unit as specified in UFC 3-460-01 that qualifies for use in an ANSI 150 piping system with a minimum test pressure of 275 psi. The filter vessel should interior coated carbon steel or stainless steel. (Each filter separator must be provided with coalescers and separators that have been qualified to the performance requirements of EI 1581, Category M latest edition.)
‐ RECOMMENDED: Coated carbon steel ‐ RECOMMENDED: Ball valves. (NO butterfly valves) ‐ NOT REQUIRED: Relaxation chamber
Specifications: Supplier shall meet and submit specifications validating conformance and drawings listed above with response.
Delivery: Supplier shall deliver to Ebbing Air National Guard Base, AR to the following location. Supplier shall provide government representative updates on delivery upon issuance of order and provide an approximate delivery date thirty (30) days prior to delivery and confirm the final delivery date at least 2 days prior to actual delivery.
FB6032 188 LOGISTIC READINESS SQ
ATTN: 33 FW/DET 1
CP 479 573 5546
4850 LEIGH AVE BLDG 108
FORT SMITH AR 72903-6018
Government On-site POC:
‐ MSgt Brian Patt: Brian.patt@us.af.mil and 479-573-5920 ‐ MSgt Chistopher Cooper: christopher.cooper.8@us.af.mil and 479-573-5328