This document appears to be a set of Questions and Answers related to Solicitation FA4419-24-Q-0037 for the acquisition of three (3) 10,000-gallon Secondary Containment Above Ground Storage Tanks (SCATs) for delivery to Ebbing ANG Base, Fort Smith, Arkansas.

The key details are:

  • The relaxation chamber is not required as the fuel will have a Static Dissipating Additive that negates the need.
  • Each of the 3 tanks will need its own independent pumping system.
  • The power requirements are for 30 HP and 300 GPM for each of the 3 SCATS.
  • Drawings are required to be submitted with the bid per the Tank Requirements Attachment.
  • The solicitation indicates that funds are not presently available, and the government reserves the right to cancel the solicitation. Proposals are due by 16 May 2024.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1- I see that a relaxation chamber is listed as NOT required, however, NFPA 407 states each tank will need a relaxation chamber, especially for bottom-loading trucks. Please advise as to whether or not I should include the relaxation chamber.

a. The relaxation chamber is not necessary as we will be receiving fuel that has Static Dissipating Additive that negates the need.

2- Will all 3 tanks need their own separate pumping systems each? Or will we have 1 pumping system able to utilize all 3 tanks?

a. All 3 tanks need to operate independently, therefore will need their own pumping system.

3- I see that the spec shows transformers with 350KvA to 500Kva Transformers. Can you verify the voltage that will be utilized for the pumping equipment?

a. Plan is there will be enough power for all 3 SCATS to run independently at 30 HP and 300 GPM.

4- Are drawings required for bid?

a. Yes, per the Tank Requirements Attachment, drawings are required.