This document is an attachment to a federal contract opportunity for the acquisition of three (3) 10,000-gallon Secondary Containment Above Ground Storage Tanks (SCATs) for delivery to Ebbing Air National Guard Base, Fort Smith, Arkansas. The tanks must meet specific requirements, including conformance to UFC 3-460-01, NFPA 30/30A, and UL 2085 standards. Key features required include double-wall construction, underneath skid supports, M-class filtration, automatic tank gauges, turnkey operation with pump and filtration capabilities, and a 300 GPM flow rate. The tanks cannot exceed 40ft in length by 12ft in width, and must include a catwalk, canopy, and 300 GPM filter/separator unit. The solicitation, identified as FA4419-24-Q-0037, will be issued by the 97th Contracting Squadron at Altus Air Force Base, Oklahoma, under NAICS code 332420. Prospective contractors must be registered in the System for Award Management (SAM) prior to submitting proposals.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirement: THREE (3 EA) standalone 10K GALLON SCATS for issue of Jet A fuel to Air Force R-11 6,000-gallon refueler a/o 7,000-gallon commercial variant that has recently been stock-listed. (All connection points NATO standard as with R-11) meeting specifications below:
Specifications:
THREE (3 EA) standalone 10K GALLON SCATS
‐ DECIDING FACTOR: SINGLE, STANDALONE
‐ REQUIRED: Tanks meet and in adherence to UFC 3-460-01, Table 8.1 and
NFPA 30/30A.
‐ REQUIRED: UL 2085 - REQUIRED
‐ REQUIRED: Double wall tanks (eliminates need for containment – thus no
Environment impact) ‐ REQUIRED: Tank must have underneath skid support (not saddles) for equal weight distribution (No ground or soil disruption) ‐ REQURIED: “M” class filtration for additive fuel ‐ REQUIRED: Port for Automatic Tank Gauge (ATG) and install a high-level alarm ‐ REQUIRED: Turnkey operation, to include pump and filtration capability
(only requires power and will have appropriate connection for power hookup) o NOTE: Power has been validated. Three transformers surrounding the compound (350KvA to 500Kva).
‐ REQUIRED: Cannot exceed 40FT LENGTH x 12 FT WIDTH.
‐ REQUIRED: “NO” brass fittings ‐ REQUIRED: Single point of issue from each tank ‐ REQUIRED: Flow Rate for fueling is 300GPM ‐ REQUIRED: 30ft hose length ‐ REQUIRED: Install catwalk in accordance with OSHA 29 CFR 1910 Subpart
D, that provides access from the rear of the tank and is of sufficient length to provide access to all tank openings/hatches. Walkway panels should be removable to allow for periodic maintenance and inspections. Stairs/ladders with safety shield and catwalk to be constructed of aluminum or galvanized steel. (See Attachment 9 for photograph of example catwalk).
‐ REQUIRED: Canopy installed over added system components. Must have sufficient clearance to perform maintenance or be easily removed/reinstalled to accommodate system repairs/component replacement.
‐ REQUIRED: Provide a 300 GPM EL 1581 filter/separator unit for each tank as specified in UFC 3-460-01 that qualifies for use in an ANSI 150 piping system with a minimum test pressure of 275 psi. The filter vessel should interior coated carbon steel or stainless steel. (Each filter separator must be provided with coalescers and separators that have been qualified to the performance requirements of EI 1581, Category M latest edition.)
‐ RECOMMENDED: Coated carbon steel ‐ RECOMMENDED: Ball valves. (NO butterfly valves) ‐ NOT REQUIRED: Relaxation chamber
Specifications: Supplier shall meet and submit specifications validating conformance and drawings listed above with response.
Delivery: Supplier shall deliver to and off-load to the locations designated by the government at Ebbing Air National Guard Base, AR. Supplier shall be responsible for installation at site in accordance NFP30A, which shall include:
‐ Providing government representative updates on delivery upon issuance of order and provide an approximate delivery date thirty (30) days prior to delivery and confirm the final delivery date at least 2 days prior to actual delivery.
‐ If using a crane to offload, must notify customer at least 60 days prior to final delivery to arrange for a waiver from FAA
‐ Securing the tanks once placed in final location.
‐ Receive sufficient fuel from customer into each tank for inspection and adjustments as needed to ensure operation.
‐ Calibrate jet system meter IAW NIST Handbook 44 ‐ Place system into operation and provide instructions to final customer.