FLOOR COVERINGS INSTALLATION
Solicitation number
FA4419-09-R-0107
Issued by

About this file

Attachment 1- Statement of Work

View the file

Other files

File Type Posted
Amendment to Solicitation 3 FA4419-09-R-0107.doc DOC document
ATTACHMENT_3__REFERENCE_SHEET__(SOLICITATION_ONLY)__20-Apr-09.doc DOC document
ATTACHMENT_3__REFERENCE_SHEET__(SOLICITATION_ONLY)__10-MAR-09.doc DOC document
ATTACHMENT 2 PAST PERFORMANCE SURVEY 10 MAR 09 —
Floor_Covering_Installation...Questions_&_Answers_15_Apr_09 —
Floor_Covering_Installation...Questions_&_Answers_15_Apr_09.xls XLS spreadsheet
Floor Covering Installation...Questions & Answers 14 Apr 09.xls XLS spreadsheet
Amendment to Solicitation 2.doc DOC document
PRE PREPOSAL CONFERENCE NOTES 8 Apr 09.doc DOC document
Pre-Proposal Conference FA4419-09-R-0107.ppt PPT presentation
Floor Covering Installation...Questions & Answers 8 Apr 09.xlsx XLSX spreadsheet
ATTACHMENT 1 STATEMENT OF WORK 7 Apr 09.doc DOC document
Amendment to Solicitation.doc DOC document
Floor Covering Installation...Questions & Answers 7 Apr 09.xlsx XLSX spreadsheet
Floor Covering Installation...Questions & Answers 3 Apr 09.xls XLS spreadsheet
Floor Covering Installation...Questions.xls XLS spreadsheet
Floor Covering Installation...Questions.xls XLS spreadsheet
ATTACHMENT 5 AFOSHSTD91-10 —
ATTACHMENT 3 REFERENCE SHEET —
Solicitation.doc DOC document
ATTACHMENT 4 PRICE PROPOSAL SHEET —
ATTACHMENT 2 PAST PERFORMANCE SURVEY 10 MAR 09 —
ATTACHMENT 6 TASK ORDER EXAMPLES —
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PURCHASE AND INSTALLATION OF FLOOR COVERINGS

97th AIR MOBILITY WING

ALTUS AIR FORCE BASE

OKLAHOMA 73523-5138

Approval:

//SIGNED//

DAVID S. VAUGHN, Lt Col, USAF

Functional Commander

Approval:

//SIGNED//

MICHAEL K. PIERCE, YC-02

Contracting Officer

OPR: 97 CIVIL ENGINEERS

Maintenance Engineering Element (CEOESQ)

DSN: 866-7756

COML: (580) 481-7756

linda.edens@altus.af.mil 2 March 2009

FLOOR COVERING INSTALLATION

TABLE OF CONTENTS

SECTION

TITLE

1.

DESCRIPTION OF SERVICES

1.1. COORDINATION OF WORK

1.2. REMOVAL OF FLOOR MATERIALS

1.3

FLOOR PREPARATION

1.4.

MOISTURE TESTS

1.5.

FLOORING MATERIALS

1.6.

OTHER FLOOR COVER SERVICES

1.7.

CLEANUP and DISPOSAL 2.

SERVICE DELIVERY SUMMARY

2.1.

GENERAL

2.2.

SUMMARY TABLE

3.

GOVERNMENT-FURNISHED PROPERTY AND SERVICES

4.

GENERAL CONTRACT INFORMATION

4.1.

CONTRACTOR PERSONNEL

4.2.

CONTRACTOR VEHICLES

4.3.

CONTRACTOR QUALITY CONTROL

4.4.

GOVERNMENT SURVEILLANCE

4.5.

DELIVERY ORDERS

4.6.

FURNITURE MOVING

4.7.

HAZARDOUS MATERIALS

4.8.

PERFORMANCE OF SERVICE DURING CRISIS

5.

APPENDICES

A.

SECURITY REQUIREMENTS for UNCLASSIFIED CONTRACTS B.

CARPET PRODUCTS/MATERIALS

C.

TILE/VINYL PRODUCTS/MATERIALS

D.

STONE/QUARRY PRODUCTS/MATERIALS

STATEMENT OF WORK

1. DESCRIPTION OF SERVICES: The contractor shall provide all personnel, equipment, tools, materials, supervision, administration and services necessary to remove, dispose of, purchase and install floor coverings and accessories as specified in each delivery order. The work occurs in various facilities and commercial applications, on Altus Air Force Base in indefinite quantities. All work to be performed shall be in accordance with recommended manufacturer’s commercial specifications. The guaranteed minimum contract amount for the life of the contract is $25,000 and will be applied to the Basic Year.

1.1. Coordination of Work: The contractor shall coordinate all removals and installations with

Quality Assurance Personnel (QAP). Written work schedules detailing the performance and installation dates and estimated date of completion shall be submitted to the QA prior to performance start. A copy of the building drawings depicting areas receiving services will be supplied to the contractor with issuance of the delivery order. Contractor is responsible to field verify exact measurements and quantities of the area(s) to receive installation.

1.2. Removal of Floor Materials: The contractor shall remove all flooring materials to accommodate the installation of new materials. The contractor shall clean and prepare existing substrates to receive new materials. Price for removal of floor materials shall be included in CLINS X001-X015.

1.3. Floor Preparation: Before any work begins, the contractor shall remove top layer of existing flooring and correct all defects such as rough or spalling concrete, low spots, high spots and uneven surfaces to ensure a smooth, true, and level plane except where indicated as a sloped area. Concrete curing compounds, paint, varnish, oils, release agents, sealers, waxes and adhesives shall be completely removed. Fill holes and cracks with a latex filler. Provide a latex under-layment to fill depressions and for smoothing, leveling or to create a feathered edge. Latex filler/under-layment shall have a minimum compressive strength of 2500 PSI. After cleaning and removal of loose particles, prime chalky or dusty surfaces with primer. If contractor determines that floating of floor is necessary, immediately contact the QA prior to commencement of work. Price for floor preparation shall be included in CLINS X001-X015 (does not include floating of floors).

1.4. Moisture Test: Contractor may be required to perform moisture tests as specified in the delivery order. Testing will be coordinated with the QA. Concrete floors must be allowed to cure prior to installation of flooring materials. The suitability of concrete sub floor for receiving flooring products with regard to moisture content shall be determined by spreading a 6” x 6” patch of adhesive in each of 150 SF area to receive flooring and allowed to dry over night. If latex under layment is used, test patches shall include areas covered with under layment. If the set adhesive can be scraped easily from the floor surface, the floor is not sufficiently dry. Repeat tests until adhesives adhere properly. When adhesive adheres tightly to the floor surface, proceed with the installation. Moisture tests shall be separately priced in CLINS X023.

1.5. Flooring Materials:

1.5.1. The contractor shall furnish adhesives, seam sealer, seam sticks, welding rods, seam tape, tack strips, etc. for installation of floor covering materials. Price for flooring materials shall be included in CLINS (X001 – X020)

1.5.2. Carpet Pad (CLINS X010): Carpet padding shall meet moderate to extra heavy commercial standards, minimum 1/4” thickness, 25 pound, anti-microbial density. Carpet padding for commercial applications shall be installed using the double glue or double stick down method and the standard for commercial carpet CRI – 104. Carpet padding for residential applications shall be installed using the standard for residential carpet CRI-105. Recycled padding shall be used to the greatest extent possible. See Appendix B.

1.5.3. Commercial Carpet, Broadloom and Tile CLINS (X001 – X003): Carpet/Carpet Tile for commercial applications shall be installed using the standard for commercial carpet CRI – 104. See Appendix B.

1.5.4. Ceramic, Quarry and Stone Pavers CLINS X007 - X009: All flooring shall be Class IV-Heavy Traffic or Class IV Plus-Extra Heavy Traffic as rated by the manufacturer when tested in accordance with ASTM C 1027 and ASTM C 1028. See Appendix D.

1.5.5. Vinyl Composition Tile CLINS X004 – X006 and X020: Vinyl composition tile shall be asbestos free and conform to ASTM F 1066. Materials shall be from the same lot and have the same shade and pattern. Solid vinyl tiles shall be asbestos free and conform to ASTM F1700. Stair treads/nosings shall be one piece. Surfaces of treads shall be raised, non-slip, studs, diamond, rectangle or ribbed pattern. See Appendix C.

1.5.6. Vinyl/Rubber Base Cove CLIN X016: Surfaces on which new base cove is to be applied shall be patched and be free of all foreign materials. Rubber tile and products shall conform to ASTM F 1344. Base cove material shall be manufacturer’s standard 120” coils. Color shall be identified in the delivery order. Manufacturers preformed inside and outside corners shall match the straight length of base cove. The contractor shall not use straight lengths of base cove that are bent, folded, tucked or creased around corners. See Appendix C.

1.6. Other Floor Cover Services CLIN X021, X022 and X024: Contractor shall Modify/Cut Wood Doors, Seal Terrazo or Concrete Floor and Remove/Reinstall Floor Telephone and Electrical Covers as needed.

1.7. Cleanup and Disposal: Vacuum newly installed carpet using a machine with a face-beater bar element. Remove spots or stains and replace flooring materials where spots cannot be removed and clean base cove of all foreign materials. Clean all other flooring materials according to the manufacturer recommendations and specifications. The contractor is responsible for removing all waste materials and debris from the installation site and discarding at a state permitted disposal site. Price for cleanup and disposal shall be included in

CLINS X001 – X024

2.0. SERVICE DELIVERY SUMMARY (SDS):

2.1. General: The service delivery requirements are summarized into performance objectives that relate directly to essential services. The stated performance thresholds are the minimum acceptable levels of service for each stated requirement. All aspects of the contractor’s performance are subject to Government surveillance, and absence of any contract requirement from the SDS shall not detract from its enforceability nor limit the rights or remedies of the Government.

2.2. Summary Table:

Performance Objective
SOW Para or REF
Performance Threshold
Contract Manager assigned
4.1.
Zero Defects
C-II Certified Installer(s)
4.1.4
Certification to the CO
Floor Covering is installed IAW commercial or residential standards.
1.
Zero Defects
Coordinate work.
1.1.
Zero Defects
Remove and dispose of all wastes.
1.9.
Zero Defects
Deliver MSDS’s to 97 LRS/LGRDMH, Bldg 228
4.8.
Zero Defects
Contractor provides requested information, meets requested response times, and performs work in accordance with SOW and delivery order.
All
98% of the time
Contractor performance is accomplished IAW contract requirements; timeliness and adherence to schedules.
4.7.
98% of the time

3.0. GOVERNMENT FURNISHED PROPERTY AND SERVICES: Electricity, sewage, and water will be made available where existing. The contractor shall ensure all employees practice utilities conservation. Any alterations or temporary connections to Government utilities shall be the responsibility of the contractor. Any and all temporary connections shall be restored to original condition prior to the final payment of each delivery order. No temporary connections will be allowed until the contractor has submitted a detailed plan for the connection and has received approval from the Contracting Officer for the connection as planned. The plan shall include a detailed description on how the connection will be restored to its original condition or better.

4.0. GENERAL CONTRACT INFORMATION:

4.1. Contractor Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate(s) who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer prior to contract performance.

4.1.1. The contract manager or alternate shall be available during normal duty hours within 2 hours to meet on the installation with Government personnel designated by the Contracting Officer to discuss work requirements or problem areas.

4.1.2. The contract manager and alternate must be able to converse in English, both orally and in writing.

4.1.3. Contractor personnel shall present a neat appearance and be easily recognizable; this will be accomplished by wearing clothing appropriate to the tasks being performed. Employees shall attach to their person and keep in plain view the Government-issued badges/identification tags, which contain the company name and employee name/photo.

4.1.4. Contractor shall provide a foreman who is currently certified by the International Certified Floor Covering Installers Association, Commercial II or higher. The foreman shall be on Altus AFB at all times while work is being performed. Contractor shall provide copies of certification to the Contracting Officer prior to performance start date and upon any personnel changes.

4.1.5. The contractor shall not employ any person who is an employee for the United States Government if the employment of that person would create a conflict of interest.

4.2. Contractor Vehicles:

4.2.1. The contractor shall provide and maintain vehicles for transportation to meet the requirements of this contract. All vehicles used in the performance of this contract shall have the company name prominently displayed on both sides of the vehicle and be maintained to present a clean, neat, and professional appearance at all times.

4.2.2. All vehicles used in the performance of this contract shall be in operable condition and meet the local, state, and federal safety requirements. Vehicles found to be unsafe and unable to function as designed, shall be removed from the installation and replaced at contractor expense. Vehicular repairs shall not be done on base. The contracting officer may inspect the contractor’s vehicles at any time and direct the removal of any unsafe or objectionable vehicle from the installation.

4.2.3. All vehicles shall be registered, licensed, insured and operated in accordance with the Oklahoma State directives, Department of Transportation (ODOT) and Altus AFB traffic regulations by a licensed operator/driver.

4.3. Contractor Quality Control:

4.3.1. The contractor shall establish and maintain a complete Quality Control Plan (QCP) to ensure the requirements of the contract are provided as specified. Quality Control Plan shall be submitted to the Contracting Officer after contract award, but prior to start of performance.

4.3.2. The plan shall describe the method(s) for identifying and preventing defects in the quality of service performed before the level of performance becomes unacceptable.

4.3.3. Safety: The contractor and all employees shall comply with AFOSH STD 91-10, Civil Engineering Information, Chapter 1, Chapter 2 and Appendix 2

4.3.4. The QCP shall include a section on adherence to above safety procedures.

4.4. Government Surveillance: Government will perform inspections at the completion of each delivery order. Work performance will be measured against the Service Delivery Summary listed in paragraph 2.0.

4.5. Delivery Orders:

4.5.1. Work requirements will be identified through issuance of delivery order(s). Each order will designate the contract line item(s), quantities, extended amount(s), date work is to commence, completion date, building number, and drawing(s). The contractor may be required to perform floor covering installation on multiple delivery orders at one time. Contractor shall submit specifications to QA for approval prior to commencement of work. The Government may require product samples or swatches. For subsequent delivery orders for same Clin, the Government may not require contractor to submit specifications.

4.5.2. Performance Time: Installations will commence within 90 calendar days after issuance of delivery order. Performance period for each delivery order will be a minimum of 90 calendar days. If floor covering materials requires more than a 90 calendar day delivery time from the manufacture, the contractor shall provide a letter from the manufacturer stating the estimated date of shipment to contractor. Contracting Officer will negotiate a revised installation start date with contractor. Upon agreement, modification will be issued to the delivery order. Installations shall be accomplished during normal duty hours of 7:30 a.m. to 4:30 p.m. Monday through Friday. The contractor shall request, in writing, for performance periods outside the normal working hours. The contractor has 24 hours to respond regarding repair or replacement of damaged flooring materials caused by installation problems. A repair/replacement time will be coordinated with the Contracting Officer.

4.5.3. Holidays: The contractor is not required to provide services on the following holidays: New Year’s Day, Martin Luther King’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.

4.5.4. Pre-Installation Requirements: The contractor shall notify the QA immediately of any condition(s) that will prevent the suitable completion of the delivery order, such as sub-floor conditions preventing a proper installation, etc.

4.6. Furniture Moving:

4.6.1. Furniture Moving: The contractor shall be responsible for the removal and reinstallation of the following furniture type items: desks, bookcases, cabinets, credenzas, tables, boxes, chairs, trashcans, and dormitory furnishings. Contractor will not be responsible for the moving of computer equipment, vending machines, personal items, safes, pool tables, or wall hangings. Furniture moved by the contractor shall be returned to its original location. Cost of furniture moving shall be included in CLINS X001 – X015.

4.6.2. System and Modular Furniture: Defined as furniture set in square/cubicle patterns with desks/tables/cabinets built integrally into or hung onto the wall system. The contractor shall only lift and reset System and Modular Furniture to the extent necessary for tucking carpet tile under walls/legs. Contractor will not disassemble/reassemble modular/system furniture.

4.7. Hazardous Materials/Waste: Prior to bringing on Altus AFB, the contractor shall contact the 97 LRS/LGRDMH, (580) 481-7728 to obtain a registration number for all hazardous materials to be used in the performance of this contract. Contractor shall provide to 97 LRS/LGRDMH a Material Safety Data Sheet (MSDS) for each Hazardous Material listed in OSHA Hazard Communication Standard 29 CFR 1910.1200 in accordance with AAFBI 32-7001, Hazardous Material Management. AAFBI 32-7001 outlines requirements for the procurement, usage and disposal of hazardous materials on Altus AFB. In addition, the contractor shall observe proper storage practices for hazardous materials stored on base.

4.7.1. The contractor shall only use containers that are properly labeled.

4.7.2. Material Safety Data Sheets (MSDS) shall be available, on site, for all hazardous materials in accordance with 29 CFR 1910.1200, Subpart Z.

4.7.3. Hazardous materials shall be stored and used in accordance with 29 CFR 1910.1200, Subpart Z, paragraphs (f) (5 through 11).

4.7.4. Ozone Depleting Substances: No ozone depleting substances (refrigerants or other compounds) will be released in any capacity during performance on this contract.

4.7.5. Lead Base Paint: No paint with a lead content of 0.06% or greater will be used in any capacity on this project.

4.7.6. Asbestos Materials: It is not anticipated that the contractor will encounter Asbestos Containing Materials (ACM). However, during removal of existing floor coverings, should the contractor encounter or suspect the presence of ACMs, all work shall be suspended. The contractor shall immediately notify the Contracting Officer of the situation. Government will investigate the situation and perform required testing and abatement. Contractor operations shall resume after abatement and the area is declared safe/free of ACMs. The use of any asbestos containing materials in new products is prohibited.

4.8. Performance of Services During Crisis: Floor covering services at Altus AFB are not considered mission essential and only limited service will continue in the event of crisis, whether declared by the National Command Authority under provisions of DoDI 3020.37, or otherwise. Contractor employees, with approved background checks, will be allowed unescorted access to the base for performance of work in all Force Protection Conditions except “Delta”. The Contracting Officer will notify the contractor of a “Delta” condition as soon as possible after security procedures have been implemented.

5. APPENDECIES:

A. General Security Requirements for Unclassified Contracts

B. Carpet Products/Materials

C. Tile/Vinyl Products/Materials

D. Stone/Quarry Products/Materials

APPENDIX A: General Security Requirements for Unclassified Contracts

A1. GENERAL:

1.1. Scope: These standards apply to all new construction, demolition, rehabilitation, alteration, modification, repair and maintenance contracts for existing facilities.

1.2. General Requirements: Compliance with Laws: The contractor shall comply, and ensure that all subcontractor(s) comply with all applicable Federal, State, and Local laws, regulations, ordinances and standards related to safety and security matters at Altus AFB.

1.3. Pass and Identification Requirements:

1.3.1. The contractor shall ensure the following pass and identification items required for contract performance are obtained for employees and non-government owned vehicles. All “contractor owned” or “contractor personnel owned” vehicles operating on the flight line must have a valid AAFB Form 18 (temporary flight line pass) displayed in the lower left corner of the vehicle window. Contractor must submit request to Airfield Management in Base Operations, Bldg. 185 to obtain AAFB Form 18. One (1) or a combination of the following may be needed:

a. DD Form 1172, Application for Uniformed Services Identification Card, (AFI 36-3001 and AETCR 30-1).

b. AETC Form 58, Civilian Identification Card, (AETCR 30-1).

c. Locally developed Contractor Badge (SFS OI 31-18)

d. Altus AFB Contractor’s Badge

1.3.2. Personnel Badges: All contractor employees will be issued an Altus AFB Contractor’s Badge, upon successful completion of a NCIC background check conducted by Altus AFB security forces, for unescorted access. Each contractor employee will provide the following information, but not limited to, while completing the Individual Application for Contractor Badge Business on Altus AFB, OK. This information is: full name to include first, middle, and last name, social security number, date of birth, address, driver’s license number and state of issue, number of years resident of the State of Oklahoma and Jackson County. This information will be protected under the procedures listed under the Privacy Act of 1974. Those contractor employees whose background checks reveal adverse criminal history may be denied access to Altus AFB.

1.3.3. Retrieving Identification Media: The Contractor shall retrieve all identification media, from employees who depart for any reason before the contract expires, e.g., terminated for cause, retirement, etc., and return badges/media to the Contracting Officer (CO).

1.4. Listing of Employees: The contractor shall maintain a current listing of employees. The list shall include employee's name, social security number and date of investigation if contract work involves unescorted entry to Air Force restricted or other sensitive areas designated by the Installation Commander. The list shall be validated and signed by the contractor representative with the authority to bind the contractor, and provided to the CO and 97th Security Forces Squadron (SFS) prior to the contract start date. Updated listings shall be provided when an employee's status or information changes.

1.5. Freedom of Information Act Program (FOIA): The Contractor shall comply with DoD Regulation 5400.7/Air Force Supplement, DoD Freedom of Information Act Program, and requirements. The regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding For Official Use Only (FOUO) material.

1.6. Reporting Requirements: The contractor shall comply with AFI 71-101, Volume-1, Criminal Investigations, and Volume-2, Protective Service Matters, requirements. Contractor personnel shall report to the Contracting Officer any information or circumstances of which they are aware that may pose a threat to the security of Department Of Defense (DOD) personnel, Contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment and as required thereafter.

1.7. Security:

1.7.1. Personnel Security: Contractor personnel requiring unescorted entry to restricted or other sensitive areas designated by the Installation Commander, shall comply with AFI 31-101, The Air Force Installation Security Program, and AFI 31-501, Personnel Security Program Management, requirements.

1.8. Traffic Laws: The Contractor and its employees shall comply with base traffic regulations in accordance to the provisions of AFI 31-204.

1.9. Base Exercises: Upon implementation of a Base exercise, the Contractor will be required to present an Altus AFB Contractors Badge indicating they are exempt. When determined to be in the best interest of the Government, the 97 SFS will release the contractor to continue their work.

APPENDIX B: Carpet Products/Materials

B.1. Carpet Tile Specifications, Dormitory Use (CLIN X015):

Carpet tile to be comprised of recycled and/or bio-based flooring materials.

Manufacturer:

Lees (or Approved Equal)

Construction:

Tufted

Style:

DV222

Density:

30 oz/yd

Dye Method:

Yarn Dyed

Backing:

Integrated Cushion Thermobond (ICT)

Total Weight:

150.45 ozs/yd2

Wear Warranty:

Lifetime (10 Year)

Static Control:

Less than 3.5 kv

Radiant Panel:

Class 1

Smoke Density:

Less than 450

Color and pattern to be selected by the government from the contractor’s showroom display and manufacture’s standard samples.

B.2. Carpet Tile Specifications, Industrial/Administrative Use (CLIN X003):

Carpet tile to be comprised of recycled and/or bio-based flooring materials.

Manufacturer:

Mowhawk (or Approved Equal)

Style:

Collegiate 28 Modular

Construction:

Ultra Performance System

Face Yarn:

Colorstrand SD Nylon

Tufted Yarn Weight:

28 ozs/yd2

Gauge:

1/10

Stitches Per Inch

Primary Backing:

Composite Foundation

Secondary Backing:

EcoFlex Modular System

Wear Warranty:

Lifetime Limited (10 Year)

Static Control:

Less than 3.5 kv

Radiant Panel:

Class 1

Smoke Density:

Less than 450

Color and pattern to be selected by the government from the contractor’s showroom display and manufacturer’s standard samples.

B.3. Carpet, Broadloom Specifications, Industrial/Administrative Use (CLIN X001 – X002):

Carpet shall be comprised of recycled and/or bio-based flooring materials. Broadloom carpet shall have 100% coverage on seam sealer.

Manufacturer:

Mowhawk (or Approved Equal)

Style:

Basic Premise

Construction:

Ultra Performance System

Face Yarn:

Colorstrand Nylon

Tufted Yarn Weight:

26 ozs/yd2

Dye Method:

Solution

Tufted Pile Height:

.125 low / .188 high

Gauge:

1/10

Stitches Per Inch:

8.8

Primary Backing:

Composite Foundation

Secondary Backing:

None

Wear Warranty:

Lifetime Ultra Performance

Static Control:

Less than 3.5 kv

Radiant Panel:

Class 1

Smoke Density:

Less than 450

Color and pattern to be selected by the government from the contractor’s showroom display and manufacture’s standard samples.

B.4. Commercial Padding (CLIN X010) Use recycled products to the greatest extent possible.

Thickness:

1/4" to 9/16”

Facing:

100% Synthetic Rubber

Density:

25 pound, anti-microbial

APPENDIX C: Vinyl Products/Materials – Tile, Linoleum, Sheet and Cove Base

C.1. VINYL COMPOSITION FLOORING CLIN X004 – X006

C.1.1. Armstrong, Excelon Imperial Texture or CO approved equal. Asbestos free, ASTM designation F-1066. (CLIN X004) Thickness 1/8”

Size 12” x 12”

Vinyl enhanced tile

Color and pattern to be selected by the government from the contractor’s showroom display and manufacturer’s standard samples.

C.1.2. Armstrong, luxury solid vinyl flooring, Wood Collections with borders and Natural Options Marble/Stone collection or CO approved equal. Asbestos free, ASTM designation F-1066 (CLIN X005) Thickness 1/8”

Size 12” x 12” or a 16” x 16”

Luxury Vinyl Flooring – Imitation stone, wood, or quarry

Color and pattern to be selected by the government from the contractor’s showroom display and manufacturer’s standard samples.

C.1.3. Durastone, Quartz Series or CO approved equal. Asbestos free, ASTM designation F-1066. (CLIN X006) Thickness 0.160”

Size 16” x 16”

High Performance Flooring - Imitation quarry, stone, marble, wood parquet, laminates, etc

Color and pattern to be selected by the government from the contractor’s showroom display and manufacturer’s standard samples.

C.1.4. Armstrong, Classic Corlon and Timberline Series, or CO approved equal, Linoleum and Sheet flooring. Asbestos free, ASTM designation F-1066 (CLIN X005) Gauge 0.126”

Size 6.5’ wide and 12’ wide x 98.4’ length

Color and pattern to be selected by the government from the contractor’s showroom display and manufacturer’s standard samples.

C.2. BASE COVE: Armstrong, Roppe or CO approved equal, solid colors. (CLIN X016) Thickness:

1/8”

Height:

4”

Length:

120” Coils

Color and pattern to be selected by the government from the contractor’s showroom display and manufacture’s standard samples. Each delivery order may have a different color rubber cove base.

C.3. INSIDE/OUTSIDE CORNERS: Armstrong, Roppe or CO approved equal, solid colors. (CLIN X016) Thickness:

1/8”

Height:

4”

Color and pattern to be selected by the government from the contractor’s showroom display and manufacture’s standard samples. All inside and outside corners will be factory made with the same height and thickness as straight runs of cove base being used.

C.4. STAIR TREADS, RISERS, STRINGERS: Musson Rubber Co, Color Series III. Stair treads, risers and stringers shall conform to composition and reclaimed rubber. Armstrong or CO approved equal. (CLIN X020) Thickness:

5/16” (Heavy Wear)

One piece Tread/Nosing with separate riser; lengths of 60” for full stair width application.

Raised non-slip stud, diamond rectangle or ribbed pattern.

Color and style to be selected from the contractor’s showroom display or samples.

APPENDIX D: Stone Products/Materials – Ceramic, Quarry and Stone Tile

D1.1. Ceramic Tile: Glazed or unglazed tiles/mosaics. (CLIN X007) Manufacturer: Daltile, Keystones Series with 1” x 1” Field Tile/Accents or CO approved equal.

Size 2”

Thickness ¼” +/-

Edge bonded into min 12” x 24” sheets

Color and pattern to be selected by the government from the contractor’s showroom display and manufacture’s standard samples.

D1.2. Quarry Tile/Stone Pavers: Polished or unpolished floor tile (CLIN X008 – X009) Manufacturer: Mohawk, Bolanzo and Quarry Stone Series with Inserts/Accents or CO approved equal.

Size 12” x 12”, 16” x 16” or 17” x 17”

Thickness 5/16” Nominal

Color and pattern to be selected by the government from the contractor’s showroom display and manufacturer’s standard samples.