This document is a set of construction design drawings and specifications for the "Repair Taxiway Alpha & Bravo – NAAF" project at North Auxiliary Air Field in North, South Carolina, prepared for the Air Mobility Command (AMC) under Project No. SBML 12-1100. The drawings are dated April 21, 2017, and marked as 100% Design Submittal, prepared by ADC (Air Mobility Command, Joint Base Charleston – Air Base).

The project encompasses comprehensive civil, structural, and electrical work across two construction areas. Civil work includes existing site and demolition plans, grading and storm drainage plans with detailed cross-sections for Taxiway Alpha and Bravo, erosion control plans (initial, intermediate, and final phases), taxiway marking plans with detailed specifications, and paving details. Electrical work involves demolition and layout plans, circuiting plans, fixture details, mounting details, duct section details, and signage specifications. Key site infrastructure elements include work areas, haul routes, a fire station, laydown areas, and main gate access. The construction phasing plan incorporates airspace imaginary surfaces, drop zones, and operational safety considerations. Grading notes specify that all grading shall comply with project specifications and that drainage features must be installed per approved plans. The document includes work area closure tables, general safety and security requirements, project duration details, and coordination procedures for construction monitoring and inspection. Construction cost estimates and scheduling information appear on the CSPP Notes sheet (G203).

View the file

Other files

File Type Posted
Solicitation Amendment FA441827R00020004 SF 30.pdf PDF
JBLG QandA NAAF Taxiways Alpha and Bravo 20261125.xlsx XLSX spreadsheet
Solicitation Amendment FA441827R00020003.pdf PDF
Attachment 13 - Transformer NAAF.png PNG image
Attachment 12 - Geotech Report NAAF.pdf PDF
Attachment 14 - SWPPP NAAF.pdf PDF
Attachment 11 - JB Lindsey Graham Offeror Question and Answer Form.xlsx XLSX spreadsheet
Attachment 9 - Wage Determination - SC20260001.pdf PDF
Attachment 10 - Past Performance Customer Questionnaire.pdf PDF
Solicitation Amendment FA441827R00020002.pdf PDF
Solicitation Amendment FA441827R00020001.pdf PDF
NAAF Site Visit Sign In Sheet 20261104.pdf PDF
JB Lindsey Graham - Question and Answer Form.xlsx XLSX spreadsheet
NAAF Repair Taxiway Alpha and Bravo SV - List of Contractors.xlsx XLSX spreadsheet
Attachment 7 - SBML 1052018 - Combined Specifications.pdf PDF
Attachment 4 - SBML 1052018 - 100 percent drawings part 1.pdf PDF
Attachment 3 - SBML 1052018 - Submittal Register.pdf PDF
Attachment 6 - SBML 1052018 - 100 percent drawings part 3.pdf PDF
Attachment 8 - Wage Determination - SC20260040.pdf PDF
Attachment 1 - SBML 1052018 - Total Performance Time.pdf PDF
Solicitation - FA441827R0002.pdf PDF
Attachment 2 - SBML 1052018 - Recovered Material Certification.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET TITLE ISSUED REVISED

G001 TITLE SHEET 4/21/2017

G200 CONSTRUCTION SAFETY & PHASING PLAN (CSPP) 4/21/2017

G201 CSPP PARTIAL AIRSPACE IMAGINARY SURFACES 4/21/2017

G202 CSPP - DROP ZONES 4/21/2017

G203 CSPP - NOTES 4/21/2017

C001 CIVIL ABBREVIATIONS AND GENERAL NOTES 4/21/2017

C101 EXISTING SITE AND DEMOLITION PLAN - AREA 1 4/21/2017

C102 EXISTING SITE AND DEMOLITION PLAN - AREA 2 4/21/2017

C201 SITE PLAN - AREA 1 4/21/2017

C202 SITE PLAN - AREA 2 4/21/2017

C211 MARKING PLAN - AREA 1 4/21/2017

C212 MARKING PLAN - AREA 2 4/21/2017

C220 MARKING DETAILS 4/21/2017

C301 GRADING AND STORM DRAINAGE PLAN - AREA 1 4/21/2017

C302 GRADING AND STORM DRAINAGE PLAN - AREA 2 4/21/2017

C310 TAXIWAY PROFILES 4/21/2017

C320 TAXIWAY BRAVO CROSS SECTIONS 4/21/2017

C321 TAXIWAY BRAVO CROSS SECTIONS 4/21/2017

C322 TAXIWAY BRAVO CROSS SECTIONS 4/21/2017

C323 TAXIWAY ALPHA CROSS SECTIONS 4/21/2017

C620 PAVING DETAILS 4/21/2017

C630 STORM DRAINAGE DETAILS 4/21/2017

C631 STORM DRAINAGE DETAILS 4/21/2017

C701 INITIAL EROSION CONTROL PLAN - AREA 1 4/21/2017

C702 INITIAL EROSION CONTROL PLAN - AREA 2 4/21/2017

C711 INTERMEDIATE EROSION CONTROL PLAN - AREA 1 4/21/2017

C712 INTERMEDIATE EROSION CONTROL PLAN - AREA 2 4/21/2017

C721 FINAL EROSION CONTROL PLAN - AREA 1 4/21/2017

C722 FINAL EROSION CONTROL PLAN - AREA 2 4/21/2017

C740 EROSION CONTROL DETAILS 4/21/2017

C741 EROSION CONTROL NOTES 4/21/2017

E000 ELECTRICAL LEGEND & GENERAL NOTES 4/21/2017

E101 ELECTRICAL DEMOLITION PLAN 4/21/2017

E102 ELECTRICAL DEMOLITION PLAN 4/21/2017

E201 ELECTRICAL LAYOUT 4/21/2017

E202 ELECTRICAL LAYOUT 4/21/2017

E301 ELECTRICAL CIRCUITING PLAN 4/21/2017

E302 ELECTRICAL CIRCUITING PLAN 4/21/2017

E401 FIXTURE DETAILS IN ASPHALT 4/21/2017

E402 FIXTURE MOUNTING DETAILS 4/21/2017

E403 GENERAL ELECTRICAL DETAILS 4/21/2017

E404 GENERAL ELECTRICAL DETAILS 4/21/2017

E405 ELECTRICAL DUCT SECTION DETAILS 4/21/2017

E406 GENERAL ELECTRICAL DETAILS 4/21/2017

E407 SIGN DETAILS 4/21/2017

E408 SIGN DETAILS 4/21/2017

M

AT

C H

LI

N

E:

A

R

EA

C H

LI

N

E:

A

R

C H

LI

N

E:

A

R

C H

LI

N

E:

A

R

C H

LI

N

E:

A

R

C H

LI

N

E:

A

R

File details come from the government source that posted it. Updated .