Attachment 3 - SBML 1052018 - Submittal Register.pdf
PDF 298 KB Posted
- Solicitation number
- FA441827R0002
About this file
This is an AF Form 66, Schedule of Material Submittals, for a construction project to repair Taxiway Alpha and Bravo at North Auxiliary Airfield in North, South Carolina. The document is dated April 21, 2017, and represents the 100% Design Submittal phase. The project is managed by Greg Jones, P.E., with JBC Project No. SBML 12-1100 and ADC Project No. 16222.
The form establishes a comprehensive schedule of 171 line items requiring contractor submissions throughout the project lifecycle, organized by submittal type categories including preconstruction submittals (SD-01), shop drawings (SD-02), product data (SD-03), samples (SD-04), design data (SD-05), test reports (SD-06), certificates (SD-07), manufacturer's instructions (SD-08), manufacturer's field reports (SD-09), operation and maintenance data (SD-10), and closeout submittals (SD-11). Submittals cover diverse work areas including project management and scheduling, safety and environmental compliance, demolition, concrete pavement repairs, pipe lining (CIPP), lighting and navigation aids, asphalt paving, grading and landscaping, drainage systems, and maintenance documentation. Most items require five copies, with some items requiring two copies. Submission deadlines follow standard protocols: preconstruction items are due within 45 calendar days after Notice to Proceed, certain items are due prior to final inspection, and others are due prior to use or as required. The form includes fields for tracking required submission dates, dates received in contracting, return suspense dates, contractor notifications, approval status, resubmittals, and final approvals, enabling comprehensive project documentation and compliance management.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Taxiway Alpha & Bravo at
North Auxiliary Airfield North, South Carolina Orangeburg County
AF Form 66 Schedule of Material Submittals
April 21, 2017
100% Design Submittal
Project Manager: Greg Jones, P.E.
gregj@adcengineering.com JBC Project No. SBML 12-1100 ADC Project No. 16222
PROJECT NUMBER
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
01 11 00, Para 1.4.2, "Outage Requests"; G
01 11 00, Para 1.4.2, "Road
Closure Requests"; G
01 11 00, Para 1.4, "Work
Clearance"; G
01 14 00, Para 1.2.1.1, "List of Contact Personnel"; G
01 30 00, Para 1.3.2, "Resume for the proposed
Superintendent"; G
01 32 16.00 20, Para 1.2, "Project Schedule"; G
01 32 16.00 20, Para 1.3.1, "Initial Contract Progress
Report (AF IMT 3065)"; G
01 32 16.00 20, Para 1.3.2, "Initial Contract Progress
Schedule (AF IMT 3064)"; G
01 32 16.00 20, Para 1.2.3, "Project Schedule Updates";
G
01 32 16.00 20, Para 1.3.1, "Monthly Contract Progress
Reports (AF IMT 3065)"; G
01 32 16.00 20, Para 1.3.2, "Monthly Contract Progress
Schedules (AF IMT 3064)";
G
01 33 00, Para 1.7, "Submittal Register"; G
01 35 13, Para 3.1.2, "Heavy
Equipment and Vehicle List"
01 35 13, Para 3.1.2, "Existing Conditions Survey"
01 35 13, Para 3.1.2, "Construction Operations
Plan"
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N C
E
D A
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
L
R
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
'S
IN
S
T R
U C
T
IO
N S
L
I
N
U
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
IO
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
(c) Prior to Use.
(d) As Required.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
01 35 13, Para 3.1.2, "Safety
Plan"
01 35 13, Para 3.1.2, "Schedule of Work"
01 35 23, Para 1.3, "Safety
Plan Compliance Document
(SPCD)"; G
01 35 26, Para 1.6, "Accident
Prevention Plan (APP)"; G
01 35 26, Para 1.7, "Activity
Hazard Analysis (AHA)"; G
01 35 26, Para 1.6.1.1, "Critical Lift Plan"; G
01 35 26, Para 1.5.1.3, "Crane Operators"; G
01 35 26, Para 1.11, "Notifications and Reports"
01 35 26, Para 1.11.2, "Accident Reports"; G
01 35 26, Para 1.11.3, "Crane Reports"
01 35 26, Para 1.8.1, "Confined Space Entry
Permit"
01 35 26, Para 1.8.1, "Hot
Work Permit"
01 35 26, Para 1.13, "License Certificates"
01 45 00, Para 1.6, "QC
Plan"; G
01 50 00, Para 1.3, "Construction Site Plan"; G
01 50 00, Para 3.4.1, "Traffic
Control Plan"; G
01 50 00, Para 1.4, "Backflow Preventers"
01 50 00, Para 2.2.4, "Backflow Preventer Tests"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
01 50 00, Para 1.4.1, "Backflow Tester"
01 50 00, Para 1.4, "Backflow Preventers"
01 54 00.00 31, Para 1.5.2.1, "Affirmative Procurement
Reporting Form"; G
01 57 19.00 31, Para 1.7.1, "Preconstruction Survey"; G
01 57 19.00 31, Para 1.8.3, "Regulatory Notifications"; G
01 57 19.00 31, Para 1.5, "Environmental Protection
Plan"; G
01 57 19.00 31, Para 1.6, "Dirt and Dust Control Plan";
G
01 57 19.00 31, Para 3.9.2, "Disposal Requirements"
01 57 19.00 31, Para 1.8.4, "Erosion and Sediment
Control Inspection Reports"
01 57 19.00 31, Para 3.4, "Erosion and Sediment
Control Inspection Reports"
01 57 19.00 31, Para 3.4, "Storm Water Inspection
Reports for General Permit"
01 57 19.00 31, Para 1.8.5, "Solid Waste Disposal
Report"; G
01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR employee training records";
G
01 57 19.00 31, Para 3.4.2, "Storm Water Pollution
Prevention Plan compliance notebook"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
01 57 19.00 31, Para 1.8, "Waste Determination
Documentation"
01 57 19.00 31, Para 3.7.2, "Waste Determination
Documentation"
01 57 19.00 31, Para 1.8.1, "Disposal Documentation for
Hazardous and Regulated
Waste"
01 57 19.00 31, Para 1.8.2, "Contractor 40 CFR
Employee Training Records"
01 57 19.00 31, Para 1.7.2, "Solid Waste Disposal
Permit"
01 57 19.00 31, Para 1.8.5, "Solid Waste Disposal
Report"
01 57 19.00 31, Para 3.7.2, "Hazardous Waste/Debris
Management"
01 57 19.00 31, Para 1.8.3, "Regulatory Notifications"
01 57 20.00 31, Para 1.4.1, "Material Safety Data Sheet
(MSDS)"
01 57 20.00 31, Para 1.8, "Green Procurement"
01 57 20.00 31, Para 1.8, "Green Procurement"
01 57 20.00 31, Para 1.3, "Recycling Report"
01 57 20.00 31, Para 1.3, "Recycling Report"
01 74 19.00 31, Para 1.3.3, "Construction Waste
Management Plan"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
01 78 00, Para 1.5.1, "Warranty Management
Plan"
01 78 00, Para 1.5.4, "Warranty Tags"
01 78 00, Para 1.4, "Spare
Parts Data"
01 78 00, Para 3.9, "Preventative Maintenance"
01 78 00, Para 3.9, "Condition Monitoring"
01 78 00, Para 3.9, "Inspection"
01 78 00, Para 1.5.1, "Instructions"
01 78 00, Para 3.7, "Operation and Maintenance
Manuals"; G
01 78 00, Para 3.1, "As-Built
Drawings"; G
01 78 00, Para 3.3, "Record
Drawings"; G
01 78 00, Para 3.6, "As-Built
Record of Equipment and
Materials"
01 78 00, Para 3.4, "Final
Approved Shop Drawings"
01 78 00, Para 3.5, "Construction Contract
Specifications"
01 78 00, Para 3.1, "Interim
DD FORM 1354"; G
01 78 00, Para 3.1, "Checklist for DD FORM
1354"; G
02 41 00, Para 1.2.1, "Demolition Plan"; G
02 41 00, Para 1.1, "Existing
Conditions"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
02 41 00, Para 1.6, "Notification"; G
03 30 53, Para 1.4, "Installation Drawings"; G
03 30 53, Para 2.2.3.1, "Air-
Entraining Admixture"
03 30 53, Para 2.2.3.2, "Water-Reducing or
Retarding Admixture"
03 30 53, Para 2.2.9, "Curing
Materials"
03 30 53, Para 2.2.6, "Expansion Joint Filler Strips
03 30 53, Para 3.1.3.3, "Batching and Mixing
Equipment"
03 30 53, Para 3.2, "Conveying and Placing
Concrete"
03 30 53, Para 2.2.7, "Formwork"
03 30 53, Para 2.3, "Mix
Design Data"; G
03 30 53, Para 2.3, "Ready-
Mix Concrete"
03 30 53, Para 2.2.5, "Mechanical Reinforcing Bar
Connectors"
03 30 53, Para 2.2.2, "Aggregates"
03 30 53, Para 2.1.3, "Concrete Mixture
Proportions"; G
03 30 53, Para 3.8.3, "Compressive Strength
Testing"; G
03 30 53, Para 3.8.3, "Slump"; G
03 30 53, Para 3.8.3, "Air
Content"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
03 30 53, Para 2.2.4, "Water"
03 30 53, Para 2.2.1, "Cementitious Materials"
03 30 53, Para 2.2.1.2, "Pozzolan"
03 30 53, Para 2.2.2, "Aggregates"
03 30 53, Para 2.3, "Delivery
Tickets"
22 05 83.63, Para 2.1, "Installation Equipment"; G
22 05 83.63, Para 2.2.1, "CIPP Lining Tube"; G
22 05 83.63, Para 2.1, "Epoxy Resin"; G
22 05 83.63, Para 2.1, "Liner
Materials"; G
22 05 83.63, Para 3.2, "CIPP
Manufacturer's Written
Installation Instructions"
22 05 83.63, Para 3.2, "Report Summarizing The
Extent Of the Pipe Lining
Performed"; G
22 05 83.63, Para 3.2, "Pre-
Lining Inspection"
22 05 83.63, Para 3.2, "Post-
Lining Inspection"
22 05 83.63, Para 1.4, "Manufacturer's Warranty"
22 05 83.63, Para 3.2, "Record Drawings"
26 56 20.00 10, Para 2.1, "Lighting and Visual
Navigation Aids"; G
26 56 20.00 10, Para 1.3.5, "As-Built Drawings"
26 56 20.00 10, Para 2.2, "Materials and Equipment"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
26 56 20.00 10, Para 1.3.3, "Protection Plan"
26 56 20.00 10, Para 3.26, "Training"
26 56 20.00 10, Para 3.26, "Special Tools"
26 56 20.00 10, Para 3.26, "List of Parts"
26 56 20.00 10, Para 3.26, "Maintenance and Repair"
26 56 20.00 10, Para 3.28, "Posted Instructions"
26 56 20.00 10, Para 3.24, "Field Quality Control"
26 56 20.00 10, Para 3.24.3, "Visual Inspection"
26 56 20.00 10, Para 1.3.2, "Qualifications"
26 56 20.00 10, Para 2.2, "Materials and Equipment"
26 56 20.00 10, Para 3.26, "Operation and Maintenance
Procedures"; G
31 00 00, Para 3.4, "Shoring"; G
31 00 00, Para 1.4.1, "Dewatering Work Plan"; G
31 00 00, Para 3.8, "Utilization of Excavated
Materials"; G
31 00 00, Para 3.14, "Shoulder Construction"
31 00 00, Para 3.17, "Testing"
31 00 00, Para 3.17, "Testing"
32 01 11.51, Para 3.1, "Paint
Removal Process Plan"; G
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
32 01 11.51, Para 1.3, "Mechanical paint removal equipment"
32 01 11.51, Para 1.4, "Test
Section Results"
32 01 17.16, Para 3.4, "Installation of Sealant"
135 32 11 23, Para 2.1, "Plant
32 11 23, Para 1.4, "Sampling and Testing"; G
32 11 23, Para 1.4.2.4, "Field
Density Tests"; G
32 12 10, Para 3.7, "Sampling and Testing"
32 12 15.13, Para 2.1, "Placement Plan"; G
32 12 15.13, Para 2.1.6, "Diamond Grinding Plan"; G
32 12 15.13, Para 2.4, "Mix
Design"; G
32 12 15.13, Para 3.1, "Contractor Quality Control";
G
32 12 15.13, Para 2.2, "Aggregates"
32 12 15.13, Para 2.3, "Asphalt Cement Binder"
32 12 15.13, Para 2.2, "Aggregates"; G
32 12 15.13, Para 3.1.3.10, "QC Monitoring"
32 12 15.13, Para 2.3, "Asphalt Cement Binder"; G
32 12 15.13, Para 3.7, "Testing Laboratory"
32 17 23, Para 2.1.1, "Application Equipment List";
G
32 17 23, Para 3.2, "Exterior
Surface Preparation"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
32 17 23, Para 1.3.1, "Material Safety Data Sheets
(MSDS)"; G
32 17 23, Para 2.2.2.1, "Reflective media for airfields"; G
32 17 23, Para 2.2.1, "Waterborne Paint"; G
32 17 23, Para 2.2.2.1, "Reflective Media for
Airfields"; G
32 17 23, Para 2.2.1, "Waterborne Paint"; G
32 17 23, Para 1.3.2, "Qualifications"; G
32 17 23, Para 2.2.1, "Waterborne Paint"
32 17 23, Para 1.3.1, "Volatile Organic
Compound"; G
32 17 23, Para 2.2.1, "Waterborne Paint"; G
32 92 19, Para 2.5.3, "Wood
Cellulose Fiber Mulch"
32 92 19, Para 2.4, "Fertilizer"
32 92 19, Para 2.2.3, "Topsoil Composition Tests"
163 32 92 19, Para 2.1, "seed" 5
32 92 23, Para 2.4, "Fertilizer"
32 92 23, Para 2.2.1, "Topsoil composition tests"
166 32 92 23, Para 2.1, "sods" 5
33 40 00, Para 3.3, "Placing
Pipe"
33 40 00, Para 2.1, "Pipe for
Culverts and Storm Drains"
33 40 00, Para 2.1.2, "Resin
Certification"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
JBC SBML 12-1100
TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
DATE CONTRACTOR
NOTIFIED
APPROVED DISAPPROVED
PROJECT TITLE
Repair Taxiway Alpha & Bravo
SOLICITATION/CONTRACT NO.
REMARKS
DATE RECEIVED
IN CONTRACTING
DATE
TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW UP
SCHEDULE OF MATERIAL SUBMITTALS
S D
-1
O P
E R
A T
IO
N
M
A
IN
T E
N A
N
T A
S D
-0
M A
N U
F A
C T
U R
E R
'S F
IE
P O
R T
S
REQUIRED
SUBMISSION
DATE
CONTRACTOR
RESUBMITTAL
FINAL
APPROVAL
S D
-0
S A
M P
L E
S
S D
-0
D E
S
IG
N D
A T
A
S D
-0
C E
R T
IF
IC
A T
E S
S D
-0
M A
N U
F A
C T
U R
E
T R
U C
T
IO
N S
L
I
M
B
E
R
ITEM OR DESCRIPTION
OF ITEM, CONTRACT
REFERENCE, TYPE OF
SUBMITTAL
(Ref spec & para no.)
S D
-0
P R
E C
O N
S T
R U
C T
B M
IT
T
A L
S
S D
-0
S H
O P
D R
A W
IN
G
S
S D
-0
P R
O D
U C
T D
A T
A
O T
H E
R S
A S
S P
E C
IF
IE
D
S D
-0
T E
S T
R E
P O
R T
S
S D
-1
C L
O S
E O
U T
S U
B M
IT
T
A L
S
33 40 00, Para 3.7.5, "Determination of Density"
33 40 00, Para 2.2.4, "Frame
And Covers"
AF Form 66
(a) As soon as possible but in no case later than 45 calendar days after NTP.
(b) Prior to Final Inspection.
File details come from the government source that posted it. Updated .