This is a Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP) for construction activities at the Repair Taxiway Alpha & Bravo North Auxiliary Airfield located at North Auxiliary Airfield in Orangeburg County, North Carolina. The plan was prepared by ADC Engineering, Inc. with Project Manager Greg Jones, P.E., and was finalized on April 21, 2017, as a 100% submittal. The primary permittee is Joint Base Charleston, with the permittee/owner contact listed as 628 CES/CC at 210 W Stewart Avenue, Joint Base Charleston, SC 29404. The day-to-day operator is to be determined.

The construction project involves replacement of existing asphalt with near-asphalt overlay, new asphalt shoulders, grading of existing contours, and new lighting and signage. The work will be implemented across three distinct Erosion Prevention and Sediment Control phases: initial perimeter controls and sediment control BMPs, bulk construction activities with rock check dams and stone filter rings, and final site stabilization with permanent seeding and sod removal of BMPs. Key stormwater management requirements include temporary and permanent seeding or stabilization, sediment control BMPs (stone filter rings, sediment bags, rock check sediment traps, and reinforced silt fence), structural control BMPs with pavement or turf stabilization, construction entrance dust control, and water quality BMPs. The plan establishes non-numeric effluent limits addressing stormwater volume and velocity control, soil exposure and compaction preservation, soil stabilization, steep slope management (30% grade or greater), sediment discharge minimization, and pollutant discharge minimization. Prohibited discharges include concrete washout wastewater, stucco and paint washout, fuels and oils, and soaps or solvents used in equipment washing, with specific allowable non-stormwater discharges identified. Compliance requirements include SWPPP availability for inspecting officials, pre-construction conferences, weekly inspections with on-site documentation, maintenance within seven calendar days of identified BMP deficiencies, record keeping for pre-construction conferences and stabilization logs, and final stabilization when permanent seeding or sodding achieves greater than 70 percent density.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .