Attachment_7_-_Schedule_of_Materials_Submittals_dated_8_Jun_18.pdf

PDF 1 MB Posted

Attached to
Repair HVAC Combat Camera Facility, B. 241 Federal contract opportunity
Solicitation number
FA4418-18-R-0010
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 7 Schedule of Materials Submittals dated 8 Jun 18 for Solicitation FA441818R0010 Repair HVAC Combat Camera B241

View the file

Other files for this federal contract opportunity

Other files attached to Repair HVAC Combat Camera Facility, B. 241, newest first.
File Type Posted
Amendment_0003_-_FA4418-18-R-0010_Repair_HVAC_Combat_Camera_B241.pdf PDF
Attachment_14_-_Addendum_5_dated_20_Aug_18.pdf PDF
Response_to_Question__18_-_Sketch_of_B247.PDF PDF
MFR_for_Adding_B247_Sketch_dated_17_Aug.pdf PDF
Attachment_13_-_Revised_Drawings_dated_15_August_2018.pdf PDF
Attendance_Sheet_B241.pdf PDF
Amendment_0002_-_FA4418-18-R-0010-0002_Repair_HVAC_Combat_Camera_B241.pdf PDF
Attachment_12_-_Revised_Specification_Section_23_07_00_dated_15_Aug_18.pdf PDF
FA441818R0010_Questions_and_Answers.pdf PDF
Conf_Site_Visit_Slides_3_Aug_18_B241.pptx PPTX presentation
Attachment_11_-_Addendum_4_dated_15_August_2018.pdf PDF
Attachment_10_-_Addendum_3_to_Statement_of_Work_dated_8_Aug_18.pdf PDF
Attachment_9_-_Amendment_1_to_Solicitation_dated_9_Aug_18.pdf PDF
Attachment_4_-_Drawings_dated_12_Aug_16.pdf PDF
Attachment_5_-_Wage_Determination,_SC30_dated_29_Jun_18.pdf PDF
Solicitation_FA441818R0010_Repair_HVAC_Combat_Camera_B241.pdf PDF
Attachment_6_-_Green_Procurement_Plan_dated_8_Jun_18.pdf PDF
Attachment_8_-_ACM_LBP_Report,_B241_dated_9_Nov_15.pdf PDF
Attachment_1_-_Specifications_dated_12_Aug_16.pdf PDF
Attachment_2_-_Addendum_1_dated_8_Jun_18.pdf PDF
Attachment_3_-_Addendum_2_dated_8_Jun_18.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 30 PAGES

G

G

G

G

G

G

G

G

G

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

JBC-AB Repair HVAC Combat Camera Add 1 Bldg 241

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Molding

Door sweeps

Sound blankets

1083552405C Typewritten Text Attachment 7 FA441818R0010

G

G

G

G

G

G

G

G

G

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION

JBC-AB Repair HVAC Combat Camera, Add 2, B247 and B777

CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Mobile Office Walls/Doors

Wiring - electrical

Wiring - data

Outlets - electrical and data G

Electrical - conduit

Electrical - panel

Electrical - transformer

Electrical - switches

HVAC - Mini- split system

Finishes - paint , ceiling tile, door cores

JBC-AB Repair HVAC Combat Camera Fac., Bldg. 241

01 11 00 SD-01 Preconstruction Submittals GUtility Outage GRoad Closure Requests GAir Force Work Clearance Permit GContractor's Proposed Laydown

Area Plan 01 14 00 SD-01 Preconstruction Submittals

1.2.1.1 GList of Contact Personnel

01 30 00 SD-01 Preconstruction Submittals

1.2 GView Location Map

1.3 GProgress and Completion

Pictures GResume for Superintendent

01 32 16.00 20 SD-01 Preconstruction Submittals

1.2 GQualifications

1.3.1 GBaseline Project Schedule

1.4.1 GInitial Contract Progress Report

(AF IMT 3065)

1.4.2 GInitial Contract Progress

Schedule (AF IMT 3064) SD-07 Certificates

GMonthly Project Schedule Update GBi-Weekly Contract Progress

Reports (AF IMT 3065)

1.4.2 GMonthly Contract Progress

Schedule (AF IMT 3064)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 30 PAGES

01 33 00 SD-01 Preconstruction Submittals

1.7 GSubmittal register

01 35 26 SD-01 Preconstruction Submittals

1.6 GAccident Prevention Plan (APP)

1.7 GActivity Hazard Analysis (AHA)

1.6.1 GCrane Critical Lift Plan

1.5.1.2 GCrane Operators

SD-06 Test Reports 1.11Notifications and Reports

1.11.2 GAccident Reports

1.11.3Crane Reports

SD-07 Certificates

1.8 GConfined Space Entry Permit

1.8 GHot work permit

License Certificates 01 45 00 SD-01 Preconstruction Submittals

1.6.1 GConstruction Quality Control (QC)

Plan

01 45 35 SD-07 Certificates

1.5 GSpecial Inspector

1.4 GSpecial Inspection Quality

Control Plan 01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

01 50 10 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 30 PAGES

01 50 10 1.4.1 GMaterial Safety Data Sheet

(MSDS)

SD-06 Test Reports

1.8 GMonthly Green Procurement

Report

1.8 GAnnual Green Procurement

Report

1.3 GMonthly Recycling Report

GAnnual Recycling Report 01 54 00 SD-03 Product Data

Affirmative Procurement Reporting Form

Proposed environmentally preferred products.

01 57 20 SD-01 Preconstruction Submittals GConstruction Waste Management

Plan 01 57 50 SD-01 Preconstruction Submittals

1.7.1 GPreconstruction Survey

1.7.6 GRegulatory Notifications

1.5 GEnvironmental Protection Plan

1.6 GDirt and Dust Control Plan

SD-06 Test Reports 3.9.2Disposal Requirements 1.7.7Erosion and Sediment Control

Inspection Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 30 PAGES

01 57 50 3.4Erosion and Sediment Control Inspection Reports

Storm Water Inspection Reports for General Permit

1.7.8 GSolid Waste Disposal Report

SD-07 Certificates

1.7.5 GContractor 40 CFR employee

training records

SD-11 Closeout Submittals

3.4.2 GStorm Water Pollution Prevention

Plan compliance notebook 1.7.3Waste Determination

Documentation 1.7.4Disposal Documentation for

Hazardous and Regulated Waste 1.7.5Contractor 40 CFR Employee

Training Records 1.7.2Solid Waste Disposal Permit 1.7.8Solid Waste Disposal Report

Hazardous Waste/Debris Management

01 78 00 SD-03 Product Data 1.5.1Warranty Management Plan 1.5.4Warranty Tags 1.4Spare Parts Data

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 30 PAGES

01 78 00 1.5.1Instructions SD-10 Operation and Maintenance Data

3.7Operation and Maintenance Manuals

Condition Monitoring (Predictive Testing

Inspection Posted Instructions

SD-11 Closeout Submittals

3.1 GAs-Built Drawings

GRecord Drawings As-Built Record of Equipment and Materials

Final Approved Shop Drawings Construction Contract Specifications

GInterim DD Form 1354 GChecklist for DD Form 1354

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

GDeconstruction Plan 1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 30 PAGES

02 41 00 3.2.2Receipts 05 51 33 SD-02 Shop Drawings

2.3.1 GShip's Ladder

SD-03 Product Data

2.3.1 GShip's Ladder

SD-07 Certificates

1.3 GFabricator Certification for Ships

Ladder Assembly

07 21 16 SD-03 Product Data

2.1 GBlanket Insulation

SD-08 Manufacturer’s Instructions

3.3.1 GInsulation

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond breakers

2.4 GBackstops

SD-07 Certificates

3.3.6 GSealant

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.3 GFrames

2.3 GFrames

Accessories SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 30 PAGES

08 11 13 2.1 GDoors

2.3 GFrames

Accessories 08 33 23 SD-02 Shop Drawings

2.2.1 GOverhead Coiling Doors

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

2.2.1.2 GBottom Bars

2.1.1.1 GGuides

2.2.3.1 GMounting Brackets

2.2.1.8 GOverhead Drum

3.3.2 GHood

2.1.1.1 GInstallation Drawings

SD-03 Product Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

SD-05 Design Data

2.2.1 GOverhead Coiling Doors

2.2.2 GHardware

2.2.3 GCounterbalancing Mechanism

2.2.4 GManual Door Operators

SD-10 Operation and Maintenance Data

3.3.2 GManufacture's Brochures

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 30 PAGES

08 33 23 3.3.2 GParts Lists SD-11 Closeout Submittals

3.3.1 GWarranty

08 71 00 SD-02 Shop Drawings

1.3 GHardware schedule

2.2.4Keying system

SD-03 Product Data

2.2 GHardware items

GKnox Box SD-08 Manufacturer’s Instructions

3.1Installation SD-10 Operation and Maintenance Data

1.3 GHardware Schedule

SD-11 Closeout Submittals

1.4Key Bitting 09 51 00 SD-02 Shop Drawings

1.2 GApproved Detail Drawings

SD-03 Product Data

GAcoustical Ceiling Systems SD-04 Samples

2.1 GAcoustical Units

2.1.1 GAcoustic Ceiling Tiles

SD-07 Certificates

2.1 GAcoustical Units

2.1.1 GAcoustic Ceiling Tiles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 30 PAGES

09 90 00 SD-02 Shop Drawings 3.8Piping identification 3.8stencil

SD-03 Product Data

2.1 GCoating

2.1 GManufacturer's Technical Data

Sheets Sealant

SD-04 Samples

1.9 GColor

SD-07 Certificates 1.3Applicator's qualifications

1.4.1.2 GQualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.4.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1 GCoatings:

22 00 00 SD-03 Product Data

2.1 GWater Heaters

SD-06 Test Reports

3.5Tests, Flushing and Disinfection SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 30 PAGES

22 00 00 1.3Materials and Equipment 2.2.1Bolts

23 00 00 SD-02 Shop Drawings

1.4.5 GDetail Drawings

SD-03 Product Data 2.8.1.1Metallic Flexible Duct 2.8.1.2Insulated Nonmetallic Flexible

Duct Runouts 2.8.1.2Duct Connectors

2.8.2 GDuct Access Doors

Fire Dampers; G

2.8.4 GManual Balancing Dampers

2.8.8 GSound Attenuation Equipment

2.8.9.1 GDiffusers

Registers and Grilles; G

2.8.10 GLouvers

2.8.11 GAir Vents, Penthouses, and

Goosenecks;

GCentrifugal Fans;

GIn-Line Centrifugal Fans; G GCeiling Exhaust Fans; G

2.10 GAir Handling Units

2.11.1 GRoom Fan-Coil Units

2.11.2.1 GVariable Volume, Single Duct

Terminal Units

2.11.2.2 GReheat Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 30 PAGES

23 00 00 Test Procedures; G

1.2.1.2 GDiagrams

SD-06 Test Reports

3.12 GPerformance Tests

3.10 GDamper Acceptance Test

SD-07 Certificates Bolts

1.4.3Ozone Depleting Substances SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation Instructions

3.14.2Operation and Maintenance Training

SD-10 Operation and Maintenance Data

3.14.1 GOperation and Maintenance

Manuals

2.8.3 GFire Dampers

2.8.4 GManual Balancing Dampers

GAutomatic Smoke-Fire Dampers GCentrifugal Fans GIn-Line Centrifugal Fans

2.9.1.1 GCeiling Exhaust Fans

2.10 GAir Handling Units

2.11.1 GRoom Fan-Coil Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 30 PAGES

23 00 00 2.11.2.1 GVariable Volume, Single Duct Terminal Units

2.11.2.2 GReheat Units

GUnit Ventilators

SD-11 Closeout Submittals SEnergy Efficient Equipment SOzone Depleting Substances for

Refrigerants 23 05 15 SD-01 Preconstruction Submittals

1.2 GMaterial, Equipment, and Fixture

Lists

SD-02 Shop Drawings 1.2Record Drawings 1.2Connection Diagrams

1.2 GCoordination Drawings

1.2Fabrication Drawings 3.1Installation Drawings

SD-03 Product Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

2.4 GMiscellaneous Materials

2.5 GSupporting Elements

1.2 GEquipment Foundation Data

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 30 PAGES

23 05 15 1.2Manufacturer's Standard Color Charts

SD-05 Design Data

2.1 GPipe and Fittings

2.2 GPiping Specialties

2.3 GValves

SD-06 Test Reports

3.1 GHydrostatic Tests

3.1 GAir Tests

3.1Valve-Operating Tests 3.1Drainage Tests 3.1Pneumatic Tests 3.1Non-Destructive Electric Tests 3.1System Operation Tests

SD-07 Certificates 1.4.2Record of Satisfactory Field

Operation 1.4.3List of Qualified Permanent

Service Organizations 1.2Listing of Product Installations 1.2Records of Existing Conditions 3.1Surface Resistance 3.1Shear and Tensile Strengths 3.1Temperature Ratings 3.1Bending Tests 3.1Flattening Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 30 PAGES

23 05 15 3.1Transverse Guided Weld Bend Tests

SD-10 Operation and Maintenance Data

3.11Operation and Maintenance Manuals

23 05 48.00 40 SD-02 Shop Drawings 1.2Installation Drawings 1.2Outline Drawings

SD-03 Product Data

1.2 GEquipment and Performance

Data

2.2.7 GIsolators

SD-06 Test Reports 2.4Type of Isolator 2.4Type of Base 2.4Allowable Deflection 2.4Measured Deflection

23 05 93 SD-01 Preconstruction Submittals GRecords of Existing Conditions

SD-02 Shop Drawings

1.3.3 GTAB Schematic Drawings and

Report Forms SD-03 Product Data

1.3 GEquipment and Performance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 30 PAGES

23 05 93 GTAB Related HVAC Submittals SD-06 Test Reports

GCompleted Pre-Final DALT Report

3.3.6 GCertified Final DALT Report

SD-07 Certificates

1.5.1 GIndependent TAB Agency and

Personnel Qualifications

GDALT and TAB Submittal and Work Schedule

GTAB Pre-Field Engineering Report

23 07 00 SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

3.1.1 GDisplay Samples

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 30 PAGES

23 07 00 SReduce Volatile Organic Compounds (VOC)

SRecycled Content 23 09 00 SD-02 Shop Drawings

3.3 GDDC Contractor Design Drawings

3.3 GDraft As-Built Drawings

3.3 GFinal As-Built Drawings

SD-03 Product Data GProgramming Software GController Application Programs GConfiguration Software

2.2 GManufacturer's Product Data

SD-06 Test Reports

3.1.1Existing Conditions Report

3.5.2 GStart-Up Testing Report

3.6.1 GPVT Procedures

3.6.3 GPVT Report

1.9.1 GPre-Construction Quality Control

(QC) Checklist

1.9.2 GPost-Construction Quality Control

(QC) Checklist SD-10 Operation and Maintenance Data

3.7 GOperation and Maintenance

(O&M) Instructions

3.9.1 GTraining Documentation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 30 PAGES

23 09 00 SD-11 Closeout Submittals

2.5 GEnclosure Keys

3.2.6.1 GPassword Summary Report

1.9.3 GCloseout Quality Control (QC)

Checklist 23 11 25 SD-02 Shop Drawings

1.5.2 GGas Piping System

2.2 GGas Piping System

3.2 GGas Piping System

SD-03 Product Data GPipe and Fittings

1.5.2 GGas Equipment Connectors

1.5.2 GGas Piping System

2.2 GGas Piping System

3.2 GGas Piping System

2.1 GPipe Coating Materials

GPressure Regulators GRisers GTransition Fittings

2.3 GValves

2.2.4 GWarning and Identification Tape

SD-06 Test Reports

3.15 GTesting

3.15.1 GPressure Tests

3.15.2 GTest with Gas

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 30 PAGES

23 11 25 1.5.1 GWelders Procedures and Qualifications

1.5.1 GAssigned Number, Letter, or

Symbol

SD-10 Operation and Maintenance Data

1.3.1 GGas Facility System and

Equipment Operation

1.3.2 GGas Facility System Maintenance

1.3.3 GGas Facility Equipment

Maintenance 23 23 00 SD-02 Shop Drawings

2.2 GRefrigerant Piping System

SD-03 Product Data

2.2Refrigerant Piping System 1.5.2Spare Parts 1.3.1Qualifications 3.5Refrigerant Piping Tests 3.1Verification of Dimensions

SD-06 Test Reports 3.5Refrigerant Piping Tests

SD-07 Certificates 2.1Service Organization

SD-10 Operation and Maintenance Data

1.5 GMaintenance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 30 PAGES

23 23 00 3.4 GOperation and Maintenance Manuals

3.4 GDemonstrations

23 52 43.00 20 SD-02 Shop Drawings

1.3.2.2Fuel Train 1.3.2.2Wiring Diagram

SD-03 Product Data 2.1Boilers 2.3Boiler Trim and Control

Equipment 2.2Burners and Control Equipment 2.3.17Stack, Breeching, and Supports

SD-06 Test Reports 3.4.1Operational Tests 1.3.3Water Analysis

SD-07 Certificates 2.1Boilers 2.2Burners and Control Equipment 2.3Boiler Trim and Control

Equipment SD-08 Manufacturer’s Instructions

2.1Boilers 2.3.7Feedwater Treatment Feeder

SD-10 Operation and Maintenance Data

2.1Boilers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 30 PAGES

23 64 26 SD-03 Product Data GGrooved Mechanical

Connections For Steel

2.4.6 GCalibrated Balancing Valves

GAutomatic Flow Control Valves 2.4.7Pump Discharge Valve

2.4.8 GWater Temperature Mixing Valve

2.4.9 GWater Temperature Regulating

Valves 2.4.10Water Pressure Reducing Valve 2.4.11Pressure Relief Valve 2.4.12Combination Pressure and

Temperature Relief Valves

2.5.8 GExpansion Joints

2.6 GPumps

Combination Strainer and Pump Suction Diffuser; G

Expansion Tanks; G Air Separator Tanks; G

2.9 GWater Treatment Systems

SD-06 Test Reports

3.1.1.3Piping Welds NDE Report

3.5.2 GPressure Tests Reports

SD-07 Certificates 3.1.1.1Employer's Record Documents

(For Welding)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 30 PAGES

23 64 26 3.1.1.2Welding Procedures and Qualifications

Unions Flanges Gaskets Bolting

SD-10 Operation and Maintenance Data

2.9 GWater Treatment Systems

2.4.6 GCalibrated Balancing Valves

GAutomatic Flow Control Valves

2.4.7 GPump Discharge Valve

2.4.11 GPressure Relief Valve

2.4.12 GCombination Pressure and

Temperature Relief Valves

2.5.8 GExpansion Joints

2.6 GPumps

2.5.2 GCombination Strainer and Pump

Suction Diffuser

2.7 GExpansion Tanks

2.8 GAir Separator Tanks

23 81 23.00 20 SD-03 Product Data

2.1 GComputer room air conditioning

units

2.3.2 GSpace temperature control

system drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 30 PAGES

23 81 23.00 20 2.1.4Filters 1.4Refrigerants

SD-06 Test Reports

3.3.2 GField Test Schedule

3.3.1 GManufacturer's Field Test Plans

3.3.6 GField Test Reports

2.1.2Aquatic Toxicity

SD-07 Certificates

2.2 GCertificate of Specification

Compliance

3.3.3 GCredentials of the Manufacturer's

Field Test Representative SD-08 Manufacturer’s Instructions

3.1.2Installation Manual for Each Type of CRACU

SD-10 Operation and Maintenance Data

2.1 GComputer Room Air Conditioning

Units

23 82 00.00 20 SD-03 Product Data 2.1Unit Heaters 2.2Infrared Heaters

SD-10 Operation and Maintenance Data

2.1Unit Heaters 2.2Infrared Heaters

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 30 PAGES

23 82 19.00 40 SD-01 Preconstruction Submittals 1.3Material, Equipment, and Product

Installation Lists SD-02 Shop Drawings

2.2Fabrication Drawings

3.1 GInstallation Drawings

SD-03 Product Data

2.2 GEquipment and Performance

Data 2.2Coils 2.2Casing

2.2 GEnclosure

2.2 GMotors

2.2 GFan

2.2 GDrain Pans

2.2 GFilters

2.2 GControls

2.2 GVibration Isolation

SD-04 Samples 2.2Manufacturer's Standard Color

Chart SD-07 Certificates

1.3Listing of Product Installations

2.2 GCertificates of Conformance

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 30 PAGES

23 82 19.00 40 3.3 GOperation and Maintenance Manuals

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1 GMaterial, Equipment, and Fixture

Lists SD-03 Product Data

2.1.1 GConduits and Raceways

2.1.2 GWire and Cable

3.2.1.8 GSplices and Connectors

2.1.3 GSwitches

2.1.5 GOutlets, Outlet Boxes, and Pull

Boxes

2.1.7 GCircuit Breakers

2.1.8 GLamps and Lighting Fixtures

SD-06 Test Reports 3.3Continuity Test 3.3Phase-Rotation Tests 3.3Insulation Resistance Test

SD-07 Certificates

1.4 GCertification

SD-08 Manufacturer’s Instructions Part 2Manufacturer's Instructions

26 05 48.00 10 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.3Equipment Requirements

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 30 PAGES

26 05 48.00 10 3.2 GLighting Fixtures in Buildings

1.3 GEquipment Requirements

1.2.4 GContractor Designed Bracing

26 08 00 SD-06 Test Reports

3.1 GAcceptance tests and inspections

SD-07 Certificates

1.4.1 GQualifications

1.4.3 GAcceptance test and inspections

procedure 26 09 23.00 40 SD-03 Product Data

2.1Photoconductive Control Devices

2.7 GLighting Contactor

GTime Switch GPhotocell Switch

SD-06 Test Reports 3.2System Operation Tests

SD-10 Operation and Maintenance Data

2.1 GLighting Control System, Data

Package 5

26 20 00 SD-02 Shop Drawings

2.12 GPanelboards

2.19 GWireways

SD-03 Product Data

2.11 GReceptacles

2.12.2 GCircuit breakers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 30 PAGES

26 20 00 2.9 GSwitches

2.13 GEnclosed circuit breakers

GMotor controllers GCATV outlets GGrounding Busbar GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.3 GGrounding system test

SD-07 Certificates

2.10 GFuses

SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

26 51 00 SD-03 Product Data

GFluorescent lighting fixtures GFluorescent electronic ballasts GFluorescent electromagnetic ballasts GFluorescent lamps GDimmer switch GLighting contactor GTime switch

2.4 GPhotocell switch

2.5 GPower hook fixture hangers

2.6 GExit signs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 30 PAGES

26 51 00 2.7 GEmergency lighting equipment GCentral emergency system

2.8 GOccupancy sensors

GElectronic dimming ballast GDimming ballast controls GLight Level Sensor

1.6.3.3Energy Efficiency SD-04 Samples

1.6.1 GLighting fixtures

SD-06 Test Reports

3.3Operating test SD-10 Operation and Maintenance Data

1.4.1 GLighting Control System

1.8Operational Service

26 56 00 SD-01 Preconstruction Submittals

1.5.2 GPhotometric Plan

1.6.1 GLED Luminaire Warranty

SD-02 Shop Drawings

1.5.1.1 GLuminaire drawings

GPoles SD-03 Product Data

2.2 GLED Luminaires

2.2.2 GLuminaire Light Sources

2.2.3 GLuminaire Ballasts, Generators

and Power Supply Units (Drivers)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 30 PAGES

26 56 00 GLighting contactor

2.4.2 GTime switch

GLighting Control Relay Panel

2.4.3 GMotion Sensor

GBi-level HID Controller

2.4.1 GPhotocell

GConcrete poles GAluminum poles GSteel poles GFiberglass poles

2.5Brackets

2.3 GObstruction Marker Luminaires

SD-05 Design Data

1.5.3 GDesign Data for luminaires

SD-06 Test Reports

1.5.4 GLED Luminaire - IES LM-79 Test

Report

1.5.5 GLED Light Source - IES LM-80

Test Report 3.1Operating test

SD-07 Certificates

1.6.1 GLuminaire Useful Life Certificate

SD-08 Manufacturer’s Instructions Concrete poles Fiberglass poles

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 30 PAGES

26 56 00 SD-10 Operation and Maintenance Data Electronic Ballast Warranty Operational Service

28 05 26.00 40 SD-01 Preconstruction Submittals 3.8.2Grounding Systems

SD-02 Shop Drawings 1.4Record Drawings

SD-03 Product Data 2.1Ground Rods 2.2Ground Wires 2.3Connectors and Fasteners 3.7Bonding

SD-06 Test Reports 3.8.1Bond Resistance Test 3.8.2Ground Resistance Tests

Ground Isolation Test 3.8.4Continuity Isolation Test

SD-08 Manufacturer’s Instructions 3.8.2Grounding Systems

28 31 76.00 00 SD-02 Shop Drawings Shop Drawings WARNING: Text in tags exceeds the maximum length of 300 characters

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 30 PAGES

28 31 76.00 00 Product Data WARNING: Text in tags exceeds the maximum length of 300 characters

SD-05 Design Data Design Data WARNING: Text in tags exceeds the maximum length of 300 characters

SD-08 Manufacturer’s Instructions GMaterial Safety Data

SD-09 Manufacturer’s Field Reports

GFactory test reports SD-10 Operation and Maintenance Data

GMaintenance Manuals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

DKFX 14-1065 Submittal Schedule B241 Addendum 1 B241
DKFX 14-1065 Submittal Schedule B241 Addendum 2 B247 and B777
DKFX 14-1065 Submittal Schedule B241