Attachment 14 - Addendum 5 dated 20 Aug 18 to Solicitation FA441818R0010 Repair HVAC Combat Camera B241

View the file

Other files

File Type Posted
Amendment_0003_-_FA4418-18-R-0010_Repair_HVAC_Combat_Camera_B241.pdf PDF
Response_to_Question__18_-_Sketch_of_B247.PDF PDF
MFR_for_Adding_B247_Sketch_dated_17_Aug.pdf PDF
Attachment_12_-_Revised_Specification_Section_23_07_00_dated_15_Aug_18.pdf PDF
Amendment_0002_-_FA4418-18-R-0010-0002_Repair_HVAC_Combat_Camera_B241.pdf PDF
Attachment_11_-_Addendum_4_dated_15_August_2018.pdf PDF
Attachment_13_-_Revised_Drawings_dated_15_August_2018.pdf PDF
Attendance_Sheet_B241.pdf PDF
Conf_Site_Visit_Slides_3_Aug_18_B241.pptx PPTX presentation
FA441818R0010_Questions_and_Answers.pdf PDF
Attachment_9_-_Amendment_1_to_Solicitation_dated_9_Aug_18.pdf PDF
Attachment_10_-_Addendum_3_to_Statement_of_Work_dated_8_Aug_18.pdf PDF
Attachment_7_-_Schedule_of_Materials_Submittals_dated_8_Jun_18.pdf PDF
Solicitation_FA441818R0010_Repair_HVAC_Combat_Camera_B241.pdf PDF
Attachment_8_-_ACM_LBP_Report,_B241_dated_9_Nov_15.pdf PDF
Attachment_5_-_Wage_Determination,_SC30_dated_29_Jun_18.pdf PDF
Attachment_6_-_Green_Procurement_Plan_dated_8_Jun_18.pdf PDF
Attachment_4_-_Drawings_dated_12_Aug_16.pdf PDF
Attachment_1_-_Specifications_dated_12_Aug_16.pdf PDF
Attachment_2_-_Addendum_1_dated_8_Jun_18.pdf PDF
Attachment_3_-_Addendum_2_dated_8_Jun_18.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment #14 FA441818R0010

Addendum 5 B241/Temporary Swing Space

Repair HVAC Combat Camera Facility – B241

DKFX 14-1065

20 August 2018

Statement of Work

1. Drawings Sheets A120 and A121 Delete Note 3 Sprinkler Heads are to be centered in ceiling tiles. Place new ceiling grid system in same location as existing ceiling grid system.

2. Drawings Sheets A120 and A121. All Audio Visual Equipment will be removed by the government.

3. Drawings Sheets A120 and A121 Existing Ceiling Fans are to be demolished and not reinstalled.

END OF ADDENDUM