FA4418-16-R-0005-0001_Change_Section_A.pdf

PDF 27 KB Posted

Attached to
Repair HVAC System, Training Facility, Bldg. 2400 (NNPTC)
Solicitation number
FA4418-16-R-0005
Issued by

About this file

Amendment 1 change section A for FA4418-16-R-0005 Repair HVAC System Training Facility B2400 NNPTC

View the file

Other files

File Type Posted
FA4418-16-R-0005-0004.pdf PDF
Pre-bid_QA_FA4418-16-R-0005_2016-06-17.pdf PDF
FA4418-16-R-0005-0003_Incorporate_Addendum__2_dated_15_June_2016.pdf PDF
Attachment__8_-_Addendum__2_dated_10_June_2015.pdf PDF
Pre-Proposal_Site_Visit_Slides.pdf PDF
Pre-Proposal_Site_Visit_Minutes.pdf PDF
Pre-Proposal_Site_Visit_Sign-in_sheet.pdf PDF
Pre-Proposal_Site_Visit_Photos.pdf PDF
FA4418-16-R-0005-0002__Repair_HVAC_System _Training_Facility_B2400 _NNPTC.pdf PDF
Attachment__7_-_Addendum__1_dated_25_May_2016.pdf PDF
Attachment__4_-_AF_Form_66_dated_7-22-2015.pdf PDF
Attachment__6_-_Asbestos_Survey_dated_12-22-2014.pdf PDF
Attachment__2_-_Drawings_Dated__7-22-2015_Part2.pdf PDF
Attachment__5_-_Wage_Determination_dated_2-21-2016.pdf PDF
Attachment__2_-_Drawings_Dated__7-22-2015_Part3.pdf PDF
Attachment__1_-_Specifications_dated_3-23-2016.pdf PDF
FA4418-16-R-0005_Repair_HVAC_System _Training_Facility_B2400 _NNPTC.pdf PDF
Attachment__2_-_Drawings_Dated__7-22-2015_Part1.pdf PDF
Attachment__3_-_Green_Procurement_Form_dated_4-22-2016.pdf PDF
Attachment__2_-_Drawings_Dated__7-22-2015_Part4.pdf PDF
Attachment__2_-_Drawings_Dated__7-22-2015_Part5.pdf PDF
Attachment__2_-_Drawings_Dated__7-22-2015_Part6.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DKGV 13-2153

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s:

A) To change the date questions are due from 31 May 2016 to 8 June 2016 at 11:00 AM EST.

B) All other terms and conditions remain in full effect and unchanged

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4418-16-R-0005

X 9B. DATED (SEE ITEM 11)

18-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-May-2016

CODE

628 CONTRACTING SQUADRON

101 E HILL BLVD, B503

JOINT BASE CHARLESTON SC 29404 5021

FA4418 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4418-16-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

SECTION A

SPECIAL INFORMATION AND INSTRUCTIONS TO ALL INTERESTED CONTRACTORS:

IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THEY CHECK THE

WWW.FBO.GOV WEB SITE FOR ANY AMENDMENTS TO THE SOLICITATION. YOU ARE

ENCOURAGED TO REGISTER ON THE WWW.FBO.GOV WEB SITE TO RECEIVE NOTIFICATION OF

CHANGES TO THE SOLICITATION. FAILURE TO ACKNOWLEDGE AMENDMENTS MAY RENDER

YOUR PROPOSAL NONRESPONSIVE.

1. The following items represent the “Offer”, or proposal package, that should be returned in response to this solicitation (See Section L & M of the solicitation):

a. SF 1442, Solicitation, Offer, and Award

b. The Schedule, Section B

c. Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Section I, the offeror shall submit only those pages that require a fill-in.

d. Sub-contracting Plan (if required)

e. Past Performance Information

f. SF 30, Amendment of Solicitation/Modification of Contract (applicable if amendments are not acknowledged on page 2 (reverse) of SF 1442)

g. Standard Form 24, Proposal Bond

2. PRE-PROPOSAL CONFERENCE/SITE VISIT:

a. A pre-proposal conference and site visit is scheduled for 1 June 2016 at 8:30 AM EST. The conference/site visit will be conducted at the 628th Civil Engineering Squadron (CES), Building 5, Joint Base Charleston-Weapons Station, SC. Offerors must meet at the Redbank Club NLT 08:15 AM EST. All offerors will escorted by the Government to CES Building 5 for the presentation and then to NNPTC Building 2400 for the site visit. Offerors are encouraged to attend and are requested to contact Christopher Tate, Contract Specialist, at (843) 963-5180, fax number (843) 963-2829, or e-mail at chrisopher.tate.6@us.af.mil at least seven (7) days prior to the conference date if they plan to attend. Special arrangements will be required to gain access to Joint Base Charleston, SC.

Offerors are cautioned that Joint Base Charleston has visitor control procedures requiring individuals not affiliated with the installation to obtain a visitor pass prior to entrance. SOME DELAYS SHOULD BE ANTICIPATED.

Offerors should allow sufficient time to obtain a visitor pass (requiring valid driver’s license, vehicle registration, and current proof of insurance).

b. The purpose of this conference is to visit the construction site, clarify the statement of work and terms of the solicitation, and to answer any questions concerning the solicitation. Offerors are requested to prepare all questions in writing prior to the scheduled date of the conference. Submission of questions prior to the conference is encouraged.

The deadline for all questions pertaining to this solictation will be 8 June 2016 at 11:00 AM EST.

c. Remarks and explanations provided at the conference shall NOT qualify the terms of the solicitation and statement of work. Unless the solicitation is amended in writing, it will remain unchanged. Should an amendment be issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

(End Section A)

(End of Summary of Changes) http://www.fbo.gov/ http://www.fbo.gov/ mailto:chrisopher.tate.6@us.af.mil

File details come from the government source that posted it. Updated .