Wage Determination SC21 Orangeburg.pdf

PDF 95 KB Posted

Attached to
Rubber Removal/Paint Striping Federal contract opportunity
Solicitation number
FA4418-10-R-0005
Issued by
Department of the Air Force Air Mobility Command

About this file

Sect J Attachment 3

View the file

Other files for this federal contract opportunity

Other files attached to Rubber Removal/Paint Striping, newest first.
File Type Posted
Mod 1.pdf PDF
Wage Determination SC11 Charleston.pdf PDF
Resealing Joints UFGS-32 01 19.61.pdf PDF
Final AF66.pdf PDF
Pavement Markings UFGS-32 17 23.00 20.pdf PDF
Standards for Airport Markings.pdf PDF
ETL04-10 Determining the Need for Rubber Removal.pdf PDF
FA4418-10-R-0005.pdf PDF
Schedule B Price Schedule.pdf PDF
SOW_RWY_RBR_28APR2010.pdf PDF
ETL04-2 Standard Airfield Pavement Marking Schemes.pdf PDF
Runway Rubber Removal UFGS-32 01 11.52.pdf PDF
Green Procurement Form.pdf PDF
UFGS-32 01 11.51.pdf PDF
ufc_3_250_08fa Sealing Joints.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J: Attachment 3

General Decision Number: SC100021 03/12/2010 SC21

Superseded General Decision Number: SC20080021

State: South Carolina

Construction Type: Highway

Counties: Abbeville, Allendale, Bamberg, Barnwell, Beaufort, Calhoun, Cherokee, Chester, Chesterfield, Clarendon, Colleton, Darlington, Dillon, Edgefield, Fairfield, Georgetown, Greenwood, Hampton, Horry, Jasper, Kershaw, Lancaster, Laurens, Lee, Marion, Marlboro, McCormick, Newberry, Oconee, Orangeburg, Saluda, Sumter, Union and Williamsburg Counties in South Carolina.

IN ALLENDALE AND BARNWELL COUNTIES, DOES NOT INCLUDE THE SAVANNAH RIVER SITE

HIGHWAY CONSTRUCTION PROJECTS (does not include tunnels; building structures in rest area projects;

railroad construction; bascule, suspension and spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction; and other major bridges)

Modification Number Publication Date

0 03/12/2010

SUSC1987-002 06/01/1987

Rates Fringes

Carpenter......................$ 7.39

Concrete finisher..............$ 7.25

Ironworker, reinforcing........$ 7.96

Laborers:

Asphalt lay-down person....$ 7.25

Asphalt raker..............$ 7.25

Chain saw..................$ 7.25

Flagger....................$ 7.25

General....................$ 7.25

Grade checker..............$ 7.25

Lute person................$ 7.25

Pipelayer..................$ 7.25

Mason..........................$ 8.65

Painter, bridge................$ 9.63

Post driver....................$ 7.25

Power equipment operators:

Asphalt distributor........$ 7.25

Asphalt paver..............$ 7.25

Asphalt plant..............$ 7.25

Bulldozer (utility)........$ 7.25

Bulldozer..................$ 7.25

Concrete saw...............$ 7.25

Crane, backhoe, dragline, shovel:

1 cu. yd. and under......$ 7.36

Over 1 cu. yd............$ 9.15

Grease person..............$ 7.25

Hydro-seeder...............$ 7.25

Loader.....................$ 7.25

Mechanic...................$ 8.68

Motor grader (fine grade)..$ 8.78

Motor grader (rough grade)..$ 7.25

Roller (finish)............$ 7.25

Roller.....................$ 7.25

Scraper....................$ 7.25

Screed, asphalt............$ 7.25

Sweeper....................$ 7.25

Tractor, utility...........$ 7.25

Truck drivers:

Heavy-duty.................$ 7.25

Multi rear axle............$ 7.25

Single rear axle...........$ 7.25

WELDER...........................$ 9.10

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those

Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29

CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the

Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .