Final AF66.pdf

PDF 10 KB Posted

Attached to
Rubber Removal/Paint Striping
Solicitation number
FA4418-10-R-0005
Issued by

About this file

Sect J Attachment 5

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section J: Attachment 5

SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

4/28/2010 Rubber Removal-Paint Striping FA4418-10-R-0005

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

L

I

N

E

N

U

M

B

E

R

ITEM OR DESCRIPTION

OF ITEM. CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

P

R E

-C O

N S

T R

U C

T

IO

N

C E

R T

IF

IC

A T

E O

F C

O M

P L

IA

N C

E

S H

O P

D R

A W

IN

G

S

S A

M P

L E

S

M F

G 'S

R E

C O

M M

E N

D A

T

IO

N S

M F

G 'S

W A

R R

A N

T Y

C A

T A

L O

G D

A T

A

T E

S T

D A

T A

IN

D

U S

T R

Y S

T A

N D

A R

D S

O T

H E

R REQUIRED

SUBMISSION

DATE

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CON-

TRACTOR

RESUBMITTAL

FINAL

APPROVAL

REMARKS

APPROVED

DIS-

APPROVED

02587 1.2

Runway Rubber Removal 5 5 5

02761 1.2

Pavement Markings 4 5 5

NO. OF COPIES REQUIRED

AF Form 66, SEP 86

File details come from the government source that posted it. Updated .