Wage Determination SC11 Charleston.pdf
PDF 147 KB Posted
- Attached to
- Rubber Removal/Paint Striping Federal contract opportunity
- Solicitation number
- FA4418-10-R-0005
About this file
Sect J Attachment 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Mod 1.pdf | ||
| ETL04-10 Determining the Need for Rubber Removal.pdf | ||
| FA4418-10-R-0005.pdf | ||
| Wage Determination SC21 Orangeburg.pdf | ||
| Schedule B Price Schedule.pdf | ||
| SOW_RWY_RBR_28APR2010.pdf | ||
| ETL04-2 Standard Airfield Pavement Marking Schemes.pdf | ||
| Runway Rubber Removal UFGS-32 01 11.52.pdf | ||
| Green Procurement Form.pdf | ||
| UFGS-32 01 11.51.pdf | ||
| ufc_3_250_08fa Sealing Joints.pdf | ||
| Resealing Joints UFGS-32 01 19.61.pdf | ||
| Final AF66.pdf | ||
| Pavement Markings UFGS-32 17 23.00 20.pdf | ||
| Standards for Airport Markings.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J: Attachment 2
General Decision Number: SC100011 03/12/2010 SC11
Superseded General Decision Number: SC20080011
State: South Carolina
Construction Type: Highway
Counties: Aiken, Anderson, Berkeley, Charleston, Dorchester, Florence, Greenville, Lexington, Pickens, Richland, Spartanburg and York Counties in South Carolina.
IN AIKEN COUNTY, DOES NOT INCLUDE THE SAVANNAH RIVER SITE
HIGHWAY CONSTRUCTION PROJECTS (does not include tunnels; building structures in rest area projects;
railroad construction; bascule, suspension and spandrel arch bridges;bridges designed for commercial navigation; bridges involving marine construction; and other major bridges)
Modification Number Publication Date
0 03/12/2010
SUSC1987-003 06/01/1987
Rates Fringes
Asphalt lay-down person........$ 7.25
Bricklayer................................$ 7.50
Carpenter...............................$ 7.25
Concrete finisher...................$ 7.25
Electrician.............................$ 10.36
Flagger…….............................$ 7.25
Form setter (road)................$ 7.25
Ironworker, reinforcing........$ 7.96
Laborers:
Asphalt raker.....................$ 7.25
General laborer...................$ 7.25
Lute person....................$ 7.25
Mechanic.......................$ 7.60
Painter, bridge................$ 8.47
Pipelayer......................$ 7.25
Post driver....................$ 8.00
Power equipment operators:
Asphalt distributor........$ 7.25
Asphalt paver..............$ 7.25
Bulldozer (utility)........$ 7.25
Bulldozer..................$ 7.25
Chain saw..................$ 7.25
Concrete saw...............$ 7.25
Crane, backhoe, dragline
& shovel (1 yd. & under)..$ 7.25
Crane, backhoe, dragline
& shovel (over 1 yd.).....$ 8.42
Grease person..............$ 7.25
Hydro-seeder...............$ 7.25
Loader.....................$ 7.25
Motor grader (fine grade)..$ 8.77
Motor grader (rough grade).$ 7.25
Pavement milling machine...$ 8.04
Roller (finish)............$ 7.25
Roller.....................$ 7.25
Scraper....................$ 7.25
Screed, asphalt............$ 7.25
Striping machine...........$ 8.00
Sweeper....................$ 7.25
Tractor (utility)..........$ 7.25
Power tool operator............$ 7.50
Truck drivers:
Heavy-duty.................$ 7.25
Multi rear-axle............$ 7.25
Single rear-axle...........$ 7.25
Welder.........................$ 7.63
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those
Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29
CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the
Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .