HURLBURT 23 - First Floor - (1G05)(1238).pdf

PDF 432 KB Posted

Attached to
23rd STS IDS Installation
Solicitation number
FA441725Q0100
Issued by

About this file

This document is an equipment plan sheet for a US Army Corps of Engineers Mobile District facility located at Hurlburt Field, Florida. The floor plan depicts a comprehensive first-floor layout for a special tactics operations facility, showing detailed spatial arrangements for various functional areas including team rooms, vehicle maintenance spaces, crew equipment zones, storage areas, mechanical rooms, communications spaces, and administrative sections. The plan provides a grid-based equipment placement schematic with notes indicating that the equipment plan is for reference and coordination purposes only, with actual equipment to be furnished and installed by the contractor according to architectural plans. The sheet is part of a larger construction or renovation project, drawn to scale and labeled as a composite first-floor specialty equipment plan for a military facility.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1252690472A Highlight

File details come from the government source that posted it. Updated .