HURLBURT 23 - First Floor - (1G05)(1238).pdf
PDF 432 KB Posted
- Attached to
- 23rd STS IDS Installation
- Solicitation number
- FA441725Q0100
About this file
This document is an equipment plan sheet for a US Army Corps of Engineers Mobile District facility located at Hurlburt Field, Florida. The floor plan depicts a comprehensive first-floor layout for a special tactics operations facility, showing detailed spatial arrangements for various functional areas including team rooms, vehicle maintenance spaces, crew equipment zones, storage areas, mechanical rooms, communications spaces, and administrative sections. The plan provides a grid-based equipment placement schematic with notes indicating that the equipment plan is for reference and coordination purposes only, with actual equipment to be furnished and installed by the contractor according to architectural plans. The sheet is part of a larger construction or renovation project, drawn to scale and labeled as a composite first-floor specialty equipment plan for a military facility.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1252690472A Highlight
File details come from the government source that posted it. Updated .