This Statement of Work (SOW) details the installation of a Vindicator Intrusion Detection System (IDS) for the 23rd Special Tactics Squadron at Hurlburt Field, Florida, to be completed by 25 August 2025. The contractor must install Vindicator IDS components in multiple rooms (1238, 2024, 2014, 2031, 2027) within Building #91650, including 360-degree motion sensors, balance magnetic switches, tamper switches, compatible keypads, and a Honeywell graphical keypad, with all equipment to be Windows 10 compatible.
The installation requires strict adherence to multiple security and safety standards, including DAFI 31-101, TIA/EIA telecommunications standards, NFPA codes, and the Security Forces Non-Nuclear CMD list. The system must provide comprehensive alarm detection and response capabilities, with specific equipment requirements for each room. The project includes a comprehensive three-phase testing process, with the contractor responsible for a one-year warranty on all installed equipment. Additional requirements include obtaining necessary base identification, complying with security protocols, and ensuring all personnel are U.S. citizens who have undergone a trustworthiness determination.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Vindicator Intrusion Detection System (IDS) Installation
Building #91650/Rooms 1238, 2024, 2014, 2031, 2027
23rd Special Tactics Squadron
Hurlburt Field, FL
25 August 2025
1.0. DESCRIPTION OF SERVICES:
1.1 A Honeywell-Vindicator certified contractor shall provide all necessary supervision, labor, travel, materials, tools, equipment, accessories and other items necessary to safely complete the installation of all components to Air Force standards set forth in certification standards DAFI 31-
101, Security Procedures for Head Quarters 25th Air Force and related safety publications to include TIA/EIA-570, Residential Telecommunications Cabling Standards, TIA/EIA-607, Commercial Building Grounding and bonding requirements for Telecommunications, NFPA 70
National Electric Code (NEC), NFPA 101, Life Safety Code, NFPA 780, Standard for the installation of Lightning Protection Systems and the Security Forces Non-Nuclear CMD list, dated 29 April 2024. The contractor will also follow any applicable UFC guidance for the project described below. The contractor shall provide all the necessary tools and equipment to complete the upgrade. This includes any ladders, lifts, hoists, power tools, safety gear or other equipment, tools, supplies necessary to complete installation and provide necessary testing of all installed components.
1.2 SYSTEM REQUIREMENTS:
1.2.1 The contractor shall install a Vindicator Intrusion detection system (IDS) in building
#91650/room 1238, 2024, 2014, 2031, 2027, compatible with Windows 10. The contractor shall provide any support equipment required to integrate new intrusion detection equipment (IDE).
The contractor shall install the Vindicator platform. The Vindicator platform shall meet USAF
Authority to Operate (ATO). The contractor shall install the IDE from the current Air Force
Non-Nuclear IDS Equipment. The system will include Balance Magnetic Switches, 360 Degree
Motion Sensors, Tamper Switches, Vindicator compatible Keypads, a Honeywell graphical keypad (room 2027 will be a SCIF), and all hardware, fittings, wire, backup power supplies and firmware to complete the requirement. Upon completion of work, this system must provide the capability to detect alarms and initiate responses in a manner that will aid preventing damage, destruction, or unauthorized access to the resource.
1.3 EQUIPMENT PLACEMENT:
1.3.1 The contractor shall install and program the alarm panel, keypad, and the components to all panel locations within the alarmed facility, Open Storage Areas (OSA) listed in attachment 1. All the equipment below will be compatible with Windows 10. The contractor shall provide the following listed below:
a. OSA Intel Room (Room 2024) equipment will consist of the following:
• One (1) 360° PIR
• One (1) High Security Switch (HSS) with bracket for entry and exit doors.
• One (1) Vindicator Compatible Arm/Disarm Keypad
• One (1) IDS enclosure w/mounting panel, and keylock handle composed of the following items:
o One (1) Honeywell Vindicator 1500 Security Device, Wire/RJ45 o One (1) Enclosure Tamper switch o One (1) LifeSafety Power Distribution Module o Two (2) 12 VDC 20AH Backup Batteries o One (1) Battery Test Switch o One (1) Omron Relay
• One (1) Power Enclosure w/One (1) Enclosure Tamper Switch
b. OSA JTSAC Simulator (Room 2014) equipment will consist of the following:
• Two (2) High Security Switch (HSS) with bracket for entry and exit doors.
• One (1) Vindicator Compatible Arm/Disarm Keypad
• One (1) IDS enclosure w/mounting panel, and keylock handle composed of the following items:
o One (1) Honeywell Vindicator 1500 Security Device, Wire/RJ45 o One (1) Enclosure Tamper switch o One (1) LifeSafety Power Distribution Module o Two (2) 12 VDC 20AH Backup Batteries o One (1) Battery Test Switch
c. OSA Radio Storage (Room 2031) equipment will consist of the following:
• One (1) High Security Switch with bracket for entry and exit doors.
• One (1) Vindicator Compatible Arm/Disarm Keypad
• One (1) IDS enclosure w/mounting panel, and keylock handle composed of the following items:
o One (1) Honeywell Vindicator 1500 Security Device, Wire/RJ45 o One (1) Enclosure Tamper switch o One (1) LifeSafety Power Distribution Module o Two (2) 12 VDC 20AH Backup Batteries o One (1) Battery Test Switch
d. Intel SCIF (Room 2027) Equipment will consist of the following:
• One (1) High Security Switch with bracket for entry and exit doors.
• One (1) Honeywell Keypad
• One (1) IDS enclosure w/mounting panel, and keylock handle composed of the following items:
o One (1) Honeywell V3 Network Security (IDS & ACS) Firmware 4.3.2
SP VR22 OR V5 Network Security (IDS & ACS) Firmware 4.5.2 SP
VR22
o One (1) Enclosure Tamper switch o One (1) LifeSafety Power Distribution Module o Two (2) 12 VDC 20AH Backup Batteries o One (1) Battery Test Switch
e. Armory (Room 1238) Equipment will consist of the following:
• One (1) High Security Switch with bracket for entry and exit doors.
• One (1) Vindicator Compatible Arm/Disarm Keypad
• One (1) IDS enclosure w/mounting panel, and keylock handle composed of the following items:
o One (1) Honeywell Vindicator 1500 Security Device, Wire/RJ45 o One (1) Enclosure Tamper switch o One (1) LifeSafety Power Distribution Module o Two (2) 12 VDC 20AH Backup Batteries o One (1) Battery Test Switch
f. Miscellaneous Equipment
• The contractor must provide and install all necessary consumable materials
(conduit, cabling, etc) to provide connectivity.
• The contractor must provide and install all necessary power distribution for installed components and devices to ensure a fully operational system.
• The contractor must fully comply with the AFLCMC/HBU Non-Nuclear
Configuration Management Database (CMD) Equipment Approval List
• The contractor must perform all necessary head end programming in support of this effort and work with the USAF sustainment contractor for coordination of alarm point ranges, Device ID’s & IP Addresses, and all information necessary for successful programming.
1.5 Attachment 1, the diagram shows the facility office perimeter that shall be covered with sensors. For rooms 2024, 2014, 2031, 2027 the contractor shall provide and install six (6) BMS
Sensors, six (6) PIR Sensors, and one (1) HSS Sensor as outlined in the diagram. The contractor shall install one (1) Vindicator door access system (door identification reader). The X-10 lock shall be provided by the Government for the contractor’s use in installation. The contractor shall coordinate any changes to panel locations through Security Forces and Civil Engineer
Representative.
1.6 The power and the network connectivity are located within 100 feet of the alarm panel location.
1.7 The contractor shall contact 1 SOSFS/S5E for coordination before any installation to begin to validate all completed work.
2.0 INSTALLATION:
2.1 Al l IDE components such as sensors, junction boxes, communication wiring, battery power, and line supervision shall be individually identifiable to include separate alarm points. No alarm points shall be grouped to show one name and one main area without the ability to identify which individual sensor is activated.
2.2 All alarm points shall be wired to the alarm panel clockwise (left) when entering the room from the main door and shall be connected into the alarm panel in this order from left to right in the panel.
2.3 All junction boxes housing IDE in rooms 1238, 2024, 2014, 2031 shall have two (2) tamper protection switches and three (3) for room 2027 located inside the box.
2.4 The IDE shall have a backup power source, such as a battery, that will provide an uninterrupted eight (8) hours of power. This back up power source must be connected to provide a 30-minute battery failure notification prior to battery failing. This notification must be incorporated into the panel to provide Security Forces with this information.
2.5 Programing to the VCC will not be completed until after base upgrade to Windows 10.
The contractor will install all equipment associated with IDE and wait to complete programming until directed by the ESS NCOIC.
3.0 TESTING:
3.1. CVT. The contractor shall perform a Contractor Verification Test (CVT) upon completion of the IDE installation. When completed the contractor shall notify the ESS that the system is ready for Phase testing.
3.2. Certification Test Requirements. 1 SOSFS/S5E and 1 SOW/IPI or alternate authorities shall conduct functional and operational certification tests for the IDS to ensure the system meets effective standards/compliance requirements.
Note: This test and certification process shall be accomplished before the IDS is deemed operational. The testing and certification shall occur in three (3) phases.
3.3. Phase I: The contractor shall perform a Contractor Verification Test (CVT) upon the IDE
Installation. The contractor, the 23 STS representative, and 1 SOSFS/S5E shall witness test
Phase I. The test shall be performed in accordance with the written testing procedures provided in the Installation Design Package (IDP). Any component found to be inoperative during the test or at any time during the installation period shall be brought to the attention of the Security
Forces POC and 23 STS representatives. Acceptance testing shall consist of the following:
intrusion tests, tamper tests, annunciation test, assessment test, AC power loss test, line supervision test, sensor system self-tests, and access control.
3.4. Phase II: Phase II testing is a 72-hour continuous test that ensures all equipment is installed properly and works according to specifications. It shall establish initial expectations regarding false and nuisance alarm. The AFTO 747, Communications and Information Systems
Acceptance Certificate, transferring the system shall be signed after successful completion of
Phase II. AFTO 747 signifies the completion of the project and provides acceptance of the installed system. The completion of this form certifies the system has been tested and accepted as installed, and all noted exceptions shall be corrected by the party responsible to the satisfaction of the government POC / 1 SOSFS/S5E.
3.5. Phase III. Phase III testing is a 30-day continuous operational test to assess how well the system performs in its normal operating mode on a permanent basis. This test is to detect any premature or latent defects in the equipment or components and to allow the operators and maintainers an opportunity to assess the adequacy of logistics support and assess the false and nuisance alarm rates of the system. After successful completion of this Phase III, the 23 STS shall request MAJCOM certification.
3.6. Phase II and III testing shall be completed by the Government.
3.7. NAR/FAR Rates:
3.7.1 Interior IDS:
Interior false and nuisance alarms should be extremely limited. No more than one false alarm per individual sensor point within the previous 30 days is acceptable. No more than three nuisance alarms per individual sensor point within the previous 30 days is acceptable.
3.7.2 Exterior IDS:
No more than one false alarm per individual sensor point within the previous 24-hour period is acceptable. No more than three nuisance alarms per individual sensor point within the previous
24-hour period is acceptable.
3.7.3 Individual Resource IDS:
IDS configured to protect an individually exposed resource, such as an aircraft, must not have more than three false alarms or three nuisance alarms per individual sensor point within the previous 24-hour period.
4. TRAINING. The installer shall provide basic training for any altered IDE, newly installed IDE, or IDS. The training shall include information on how to secure facility, how to place facility in "access" status, how to change user pin codes, how to test all alarm point/sensors and components, and the initiation of work orders through the respective installers. The contractor shall provide the user with a user manual, or any other written verbiage stating how to utilize and install the device to activate and deactivate the system.
5. COLLATERAL SUPPORT:
5.1 The Government shall provide the following products in support of this effort.
5.1.1 Provide assistance in acquiring related permits that may be necessary for work performed.
5.1.2 Coordinate access into the installation.
5.1.3. Provide storage space/staging area for materials and an operating space with telephone capability for the installation team. Building 91065, Room #2024 shall act as the main staging area for the contractor during the installation process. To request additional space contact 23 STS project manager. The government is not responsible for materials left unattended or unsecured.
5.1.4. 23 STS shall provide a host escort for the contractors during the installation. The 23
STS project manager shall coordinate with facility/users to ensure rooms and work areas are available when access is required.
6.0. SYSTEM MAINTENANCE:
6.1. The contractor shall provide a one year of warranty maintenance and replacement parts on all new equipment installed by the contractor. The warranty shall start on the day the government accepts the entire project.
6.2. Infrastructure Malfunctions. The contractor and government representatives will coordinate and troubleshoot problems during the installation and the one-year warranty/maintenance period.
7.0 SPECIAL REQUIREMENTS:
7.1. All wiring connections shall be secured using standard security connectors that meet standard fire codes for security systems. All wiring shall be clearly labeled, and wiring diagram provided to 1 SOCONS, 1 SOCES, and 1 SOSFS/S5E.
7.2. A joint quality assurance inspection shall be conducted prior to government acceptance and after system operability testing.
7.3. The contractor shall assign employees who possess adequate certification to handle all required product installation tasks to meet OSHA, base safety requirements and annunciator certification standards. The contractor shall ensure that the product meets the required safety standards at the time the project is completed and accepted by the government. The contractor shall provide the standard commercial product warranty certificate specifying the warranty period for the system on a PDF file.
7.4. All IDS wires/cables shall be routed through conduit. Cabling installed through the ceiling shall be air plenum-rated conduit.
7.5. The contractor shall develop an installation schedule and coordinate with the 1 SOSFS/S5E
POC prior to work completion. Installation scheduling coordination may take up to forty-eight hours with subordinate units. If re-scheduling is required, the contractor should make every attempt to adhere to the forty-eight-hour window prior to the notification change request.
8.0. SECURITY REQUIREMENTS:
8.1. The contractor shall always comply with base security requirements to include base pass requirements and personnel security clearance.
8.2. The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s).
cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished contractor identification badges while visiting or performing work on the installation.
8.3 The contractor will be required to complete a Contractor Employee Listing (to be provided by the government) for employees to gain access to the installation:
8.3.1. The Contractor Employee List. This form must list every employee requiring access.
Every time employees change; it must be updated to reflect additions and/or deletions. Identify those individuals you wish to have escort authority by including the word “Escort” or “E” next to their names. Limit the number of individuals designated as escorts to a reasonable number (i.e., one or two). For work locations please use building numbers or areas (i.e., Building #91650.).
Once completed, send the list to the Contracting Office representative in EXCEL format using secure means such as hand carry, mail, or electronic mail. The Contracting Officer will then prepare and attach a cover letter and forward the Employee List to the Visitor Control Center.
8.3.2. During the performance of the contract, the contractor shall be responsible for obtaining the required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
8.3.3. When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security
Program, and AFI 31-501, Personnel Security Program Management, citing the appropriate paragraphs as applicable.
8.3.4. Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
8.3.5. Failure to comply with these requirements may result in the withholding of final payment.
9.0 Retrieving Identification Media. The contractor shall be responsible for retrieving all identification media including visitor passes from employees who depart for any reason before the contract expires. For example, termination for cause, retirement, etc.… Visitor passes shall be retrieved and turned into 1SOSFS Pass and Registration/Visitor Center once the contractor and its employees leave the base for the last time.
10.0 Traffic Laws. The contractor and employees shall comply with the Base traffic regulations.
11.0 Weapons, Firearms, Ammunition. The contractor employees are prohibited from possessing weapons, firearms, or ammunition or within the contractor vehicle or privately owned vehicles while on the Government installation.
12.0 OPEN STORAGE AREAs. Contractor employees performing work in the controlled areas described as Open Secret Storage Area (OSSA) must meet prescribed requirements
IAW DoDM 5200.0 l, Volume 3, Enclosure 3, Para 2.a.(l). "IDS Installation and
Maintenance Personnel. Alarm installation and maintenance shall be accomplished by
U.S. citizens who have been subjected to a trustworthiness determination (NACI) according to Reference (l)." The contractor shall provide information of individuals to the government for clearance verification prior to commencing work.
End of SOW
Attachment:
Diagram of Room
PI
GB
DC
DA
TV
TV
1:4
T
110PP-100
UTPP-48
FOPP-24
OFDP-24
WM
PR
EB
ES
S O
F S
P E
C
IA
L T
A C
T
IC
S O
P E
R A
T
IO
N S
F A
C
IL
IT
Y
H
U R
L B
U R
T F
IE
L D
L
T E
L E
C O
M M
U N
IC
A
T
IO
N S
L E
G E
D e s c ri p ti o n
R v is io s
A B C D
TELECOMMUNICATIONS LEGEND
E F G H I
TELECOMMUNICATIONS INFRASTRUCTURE SYSTEM (TIS)
1 BASIC VOICE/DATA OUTLET TYPES WITH SUBSCRIPT MODIFIERS SHOWN BELOW
WORK AREA OUTLET, WALL MOUNTED AT 18" AFF, NOTATION ADJACENT TO OUTLET
INDICATES NUMBER OF CABLES [AS SHOWN, (3)]. IF NO NOTATION IS SHOWN, THEN
PROVIDE 3 CABLES, WITH PULLSTRING FOR SPARE, TYPICAL ALL DEVICES. OUTLET
MUST HAVE THREE SPARE PORTS.
TELEPHONE OUTLET, WALL MOUNTED AT 54" AFF, FOR WALL INSTRUMENT. PROVIDE 1
CABLE UNLESS OTHERWISE NOTED.
DATA OUTLET, WALL MOUNTED AT 18" AFF. PROVIDE 2 CABLES MINIMUM, UNLESS
OTHERWISE NOTED BELOW. (4D) = 4 DATA PORTS AND CABLES WITH PULLSTRING FOR
SPARE.
TELEVISION DISTRIBUTION SYSTEM (TVDS)
TELEVISION OUTLET, WALL MOUNTED BEHIND FLAT PANEL, BUT NOT OBSTRUCTED
BY MOUNT (UNLESS OTHERWISE NOTED). IF SHOWN ADJACENT TO A 'TVF' DATA
OUTLET, PROVIDE AS A COMBINATION OUTLET WITH TELEVISION COAX
CONNECTOR AND (2) CAT 6 JACKS ON SHARED FACEPLATE.
AMPLIFIER, WALL MOUNTED.
TERMINAL CABINET, WALL MOUNTED.
LINE TERMINATOR, MOUNTED IN JUNCTION BOX, ABOVE ACCESSIBLE CEILING.
SPLITTER/MIXER, INPUT-OUTPUT CONNECTOR RATIO AS SHOWN, MOUNT IN
JUNCTION BOX ABOVE ACCESSIBLE CEILING.
ACCESS CONTROL SYSTEM
THIS SYSTEM IS PART OF THE ESS. FINAL LOCATIONS ARE TO BE COORDINATED WITH
SECURITY PERSONNEL.
PROVIDE THE ACCESS CONTROL SYSTEM FOR THE SECURE AREA AND INTEL SUITE WITH
'CARD-IN / CARD-OUT' FUNCTIONALITY AND CAPABILITY OF RECORDING LOG OF THESE
ACTIVITIES.
PROXIMITY/CARD READER, PROVIDE SINGLE GANG JUNCTION BOX WITH 1"C.
WHERE PROXIMITY/CARD READER AND EXIT BUTTON ARE SHOWN BACK TO
BACK, PROVIDE ONE 1"C FOR THE PAIR OF DEVICES. ROUTE CONDUIT AND
CABLING BACK TO SERVING TELECOMMUNICATIONS ROOM.
PROXIMITY/CARD READER, SAME AS ABOVE. SUBSCRIPT 'A' DENOTES FOR
US Army Corps of Engineers Mobile District
SUBSCRIPT MODIFIER LEGEND FOR VOICE/DATA OUTLET TYPES:
*** NOTE: COORDINATE WITH ARCHITECTURAL, THE HEIGHT OF ALL COUNTER
TOPS, BACKSPLASHES, TABLE TOPS OR SINKS WHICH AFFECT THE
MOUNTING HEIGHT OF OUTLETS.
CL - CEILING MOUNTED OR MOUNTED TO STRUCTURE ABOVE.
CT - COUNTER TOP, MOUNT OUTLET 4" ABOVE COUNTER TOP,
BACKSPLASH OR TABLE TOP TO CENTER OF OUTLET.
CW- MOUNTED IN CASEWORK
MF - MOUNTED IN MODULAR FURNITURE. CONTRACTOR MUST
PROVIDE CABLING, OUTLETS AND JACKS. ALL CABLING MUST BE
PROVIDED & INSTALLED BY THE TELECOM CONTRACTOR PER
DISTRIBUTION TAP, NUMBER DENOTES NUMBER OF TAPS, 12 TAPS AS SHOWN.
GROUNDING BLOCK, CONNECT TO BUILDING GROUND.
TV TV CIRCUIT IN CONDUIT.
VIDEO TELECONFERENCE (VTC) SYSTEM
A ACTIVITY LOGGING ONLY. THIS READER DOES NOT OPERATE DOOR CONTROLS.
EXIT BUTTON, PROVIDE SINGLE GANG JUNCTION BOX WITH 1"C. WHERE
PROXIMITY/CARD READER AND EXIT BUTTON ARE SHOWN BACK TO BACK,
PROVIDE ONE 1"C FOR THE PAIR OF DEVICES. ROUTE CONDUIT AND CABLING 2
BACK TO SERVING TELECOMMUNICATIONS ROOM.
ELECTRIC STRIKE, PROVIDE 1"C FROM THE WALL/JAMB STUDS. ROUTE CONDUIT
BACK TO SERVING TELECOMMUNICATIONS ROOM. COORDINATE WITH DOOR
HARDWARE.
TERMINAL CABINET, SIZE AS NOTED OR 6" x 6" x 4" MINIMUM, WITH WOOD
FURNITURE MANUFACTURER'S RECOMMENDATIONS.
S - SIPRNET DATA OUTLET. OUTLETS MUST BE PROVIDED IN
PROTECTIVE DISTRIBUTION SYSTEM (PDS)
TS - DATA OUTLET FOR TOP SECRET (SOCRATES) SYSTEM, PROVIDE WITH
4 WIRED PORTS. OUTLETS MUST BE PROVIDED IN PROTECTIVE
DISTRIBUTION SYSTEM (PDS)
W - WALL MOUNTED, FOR TELEPHONE.
CONDUIT STUB-UP.
3 MULTI SERVICE, HAND ACCESS, REACH-IN TYPE, FLUSH FLOOR BOX WITH ACTIVATION
COVER PLATE. PROVIDE VOICE/DATA OUTLET. PROVIDE (2) 1-1/4" CONDUITS TO EACH
LOCATION; (1) FOR VOICE/DATA SERVICE AND (1) SPARE WITH PULLSTRING. FOR
POWER REQUIREMENTS SEE ELECTRICAL LEGEND E-001. SEE DETAIL 'F4' ON SHEET
VTC
WALL MOUNTED TELECOM JUNCTION BOX, MOUNTED AT 18"AFF UNLESS
OTHERWISE NOTED. PROVIDE GROMMET FACEPLATE, SEE DETAIL E2/ET502.
SHELF MOUNTED SPEAKER, BY OTHERS.
SHELF MOUNTED CAMERA, BY OTHERS.
CEILING MOUNTED MICROPHONE, BY OTHERS.
VTC CABLING, BY OTHERS.
BACKBOARD, HINGED DOOR AND TERMINAL STRIPS.
AC ACS CABLING IN CONDUIT. PROVIDE CAT 6 CABLING OR AS RECOMMENDED BY
SYSTEM MANUFACTURER.
Robert M. Huggins Reg. No. 256149 expires 12-31-22
NO. 26286
PROFESSIONAL
TB
4 DB
TBB
PET
12"x4"CT
TEQR
S-004.
WALL MOUNTED TELECOM JUNCTION BOX, MOUNTED AT 18" AFF UNLESS OTHERWISE
NOTED. PROVIDE FLEXIBLE CONNECTION TO EQUIPMENT. NUMERAL DENOTES
QUANTITY OF OUTLETS SERVED.
WALL MOUNTED TELECOM JUNCTION BOX, MOUNTED AT 18" AFF UNLESS OTHERWISE
NOTED.
TELECOMMUNICATIONS CABLE IN CONDUIT, SEE PDS OUTLET WIRING DETAIL FOR
NUMBER AND TYPE OF CABLES.
COPPER BACKBONE IN CONDUIT.
FIBER BACKBONE IN CONDUIT.
TELECOMMUNICATIONS BACKBOARD, 96"H WITH LENGTH/WIDTH AS SHOWN ON PLAN,
FIRE RETARDANT, AC GRADE PLYWOOD WITH LABEL AND FIRE RATING STAMP VISIBLE.
CROSS CONNECT BLOCK (SINGLE LINE DIAGRAM). 'PET' DENOTES PROTECTED
ENTRANCE TERMINALS.
CROSS CONNECT BLOCK (FLOOR PLANS)
TELECOMMUNICATIONS CABLE TRAY. BASKET WIRE-TYPE IN CORRIDORS AND LADDER
TYPE CABLE TRAY IN TELECOMMUNICATIONS ROOMS. SIZE AS INDICATED ON PLANS,
MINIMUM 12"W x4"D.
TELECOMMUNICATIONS EQUIPMENT RACK, 4-POST TYPE, 24"W x 36"D x 84"H UNLESS
OTHERWISE NOTED.
OPTICAL FIBER DISTRIBUTION PANEL, RACK MOUNTED, 24-PORT.
FIBER OPTIC PATCH PANEL, RACK MOUNTED, 24-PORT.
PATCH PANEL, UNSHIELDED TWISTED PAIR CABLES, RACK MOUNTED, 48-PORT.
110 VOICE CROSS CONNECT, RACK MOUNTED, 100-PORT.
RACK MOUNTED WIRE MANAGER.
INTRUSION DETECTION SYSTEM (IDS)
THIS SYSTEM IS PART OF THE ESS. THE SYSTEM IS JUNCTION BOXES AND CONDUIT WITH PULL
STRING ONLY. FINAL LOCATIONS ARE TO BE COORDINATED WITH SECURITY PERSONNEL.
INTRUSION DETECTION PANEL, BY OTHERS.
PASSIVE INFRARED MOTION DETECTOR, CEILING MOUNTED, UNLESS OTHERWISE
NOTED, BY OTHERS.
DURESS ALARM BUTTON.
GLASS BREAK SENSOR, CEILING MOUNTED, BY OTHERS.
BALANCED MAGNETIC DOOR CONTACTS, BY OTHERS.
ID IDS CIRCUIT IN CONDUIT. 1" MINIMUM CONDUIT WITH PULL STRING. CABLING, BY
OTHERS.
MISCELLANEOUS
SEE NOTE 27, SHEET ET002, FOR TYPICAL DEVICE MOUNTING HEIGHTS.
GENERIC SHAPE FOR FLUSH / RECESSED ENCLOSURE.
GENERIC SHAPE FOR SURFACE MOUNTED ENCLOSURE.
CONDUIT CONCEALED BELOW FLOOR SLAB. 5
CONDUIT TERMINATION ABOVE ACCESSIBLE CEILING. PROVIDE NYLON
INSULATED BUSHING, BONDING BUSHING AND FIRE STOP, WHERE REQUIRED.
NUMBER OF CONDUITS
SIZE OF CONDUITS
TMGB
TGB
BCT
PDS
TELECOMMUNI
CATIONS MAIN
GROUNDING
BUSBAR, 24
CIRCUIT, 400A
PANELBOARD
NEUTRAL BUS,
ATTACHED TO
WALL WITH
SCREWS.
TELECOMMUNICATIONS
GROUND BUS, 24 CIRCUIT
225A PANELBOARD NEUTRAL
BUS, ATTACHED TO WALL
WITH SCREWS.
BONDING CONDUCTOR
FOR
TELECOMMUNICATIONS,
IN CONDUIT AS
REQUIRED. CONDUCTOR
MUST BE SIZED PER TIA-607-
B; TABLE 1 - TBB CONDUCTOR
SIZE VS LENGTH, WITH A
MINIMUM #6 AWG. SIZE
CONDUIT PER NEC.
PROTECTED DISTRIBUTION
SYSTEM.
CONDUIT NUMBER
NUMBER OF INNERDUCTS IN
CONDUIT
INNERDUCT NUMBER
T
IDP
ACTC
PR
TVTC
N B
S y m b o l N o
D a te p p ro v d a te
J
U N
E
F il e
N o
M E
Y
I.
S
.O
S h e e t F il e
N a m e
S o li c it a ti o n N u m b r:
W
8-
-R
-0
D e s ig n e d B y:
U G
G
IN
ra w n
B y
R H
U G
G
C h e c k e d
M
T K
IS
O v ie w e d
K
H
IL
.S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
R P
S O
F E
N G
IN
E
E
B
IL
E
A L A
B A
(1) 4" C
1 (3) 1" FABRIC INNERDUCT
1 24ST, SM FIBER
3 SPARE
CONDUIT #1 CONTENTS CONTENTS OF EACH INNERDUCT
H
E
E
T
I
D
E
N
T
I
F
I
C
A
T
I
O
N
ET
SHEET 503 of
A B C D E F G H I
2 SPARE
C U s e rs
\h u g g in s r\
D o c u m e n ts
\2 -E
R o b e rt h .r v t
/1
/2
:2
:1
P s ig n e d B y
R H
U G
G w n
U G
G e c k e d
T K
IS
v ie w e d B y
K C
H
IL
F S
P E
C
IA
L T
A C
T
IC
S O
P E
R A
T
IO
C
IL
R
L B
U R
T F
IE
L D
L E
C O
M F
L O
O R
P L A
N
B L O
C K
G
NOTES:
1. OUTLETS AND JUNCTION BOXES FOR CONNECTIONS TO
MONITORS. SECURE OUTLETS TO STRUCTURE ABOVE,
ADJACENT TO MONITOR SUPPORTS.
of Engineers
5.7
FIRE PUMP
1G10
1G10-01
FOR TIMECLOCK
FOR ELECTRICAL
SERVICE METER
1G09-02
ELEC
1G09
W W 1G09-01 1G09-03
W 1G07-01
1G03-08
1G03-07
ARMORY OFF
1G03
1G03-06
1G03-05
3D 1G03-01
1G03-04
1G03-03
1G03-02
1G05-09
1-1/4"C
1G05-06
T TV
WALL MOUNTED DC
NOTE 1
4.9
WAR
READINESS
1G07
(2) 1-1/4"C
1G05-07
3D 3D T
1G05-10
1G05-08
ARMORY
1G05-01
1G05-02
DC WEAPONS
CLEAN ROOM
1G01
DC
3 WALL MOUNTED,
ON COLUMN
expires 12-31-22 3
4.4 1G05-05
1G05-04
1G05-03
IDS
4 A B C C.3 C.8 D D.2 D.5 D.9 E E.2 E.4 4
5 5
1A
1B
1C
1F 1D
PLAN NORTH FIRST FLOOR KEY PLAN 6
1G05
1G
N
I te
J
U N
E
F il e
N o
M E
Y
I.
S
.O S h e e t F il e
N a m e
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
R P
S O
F E
N G
IN
E
E
B
IL
E
A L A
B A y m b o l
N o
D e s c ri p ti v is io p ro v li c it a ti o n N u m b
8-
-R
-0
SHEET
TELECOM FLOOR PLAN - BLOCK 1G IDENTIFICATION
SCALE: 1/8" = 1'-0"
0 4' 8' 16' ET117
SCALE: 1/8"=1'-0" SHEET 511 of 565
U s e rs
\h u g g in s r\
D o c u m e n ts
\2 -E
R o b e rt h .r v t
/1
/2
:2
:5
3D s c ri p ti v is io
8.2
2A25-08 2A25-09
2A25-07
2A25-10
E4
ET402
MED STOR
W 2B09-01
2B09-02
NARC
2B11
COMM
2B03
2B02-01
BREAKROOM
2B02
1-1/4" EC TO ABOVE
ACCESSIBLE CEILING
FOR RELAY MONITOR
FUNCTIONS
LOCATE OUTLETS
NOTES:
1. SURFACE MOUNTED ENCLOSURE AND (6) 4"EC FROM
EXTERIOR TELECOM JUNCTION BOX, SEE SHEET ET115
AND E5/ET402 FOR DETAILS. ROUTE CONDUIT ABOVE
ACCESSIBLE CEIILING.
2. PROVIDE A MINIMUM OF 8 INCHES OF SLACK CABLE AT
THIS LOCATION.
3. PROVIDE 20 FEET OF SLACK CABLE AT THIS LOCATION
TO FACILITATE CABLE ROUTING TO SWITCH AND ANY
MINOR VARIATIONS OF FINAL WORKSTATION
POSITIONING.
4. ONCE JTAC INSTALLATION IS COMPLETE, PROVIDE LOW-
VOLTAGE CABLING REQUIRED TO FINISH CONNECTIONS
OF EMERGENCY POWER OFF SYSTEM.
5. SURFACE MOUNTED ENCLOSURE AND (3) 4"EC FROM
EXTERIOR TELECOM JUNCTION BOX, SEE SHEET ET115
AND G5/ET402 FOR DETAILS. ROUTE CONDUIT ABOVE
ACCESSIBLE CEIILING.
6. DATA OUTLET FOR VTC CAMERA, MOUNTED AT 5'-0" AFF.
PROVIDE CAMERA AND SHELF TO THE RIGHT OF THE
MONITOR ARRAY. COORDINATE/CONFIRM MONITOR
Mobile District
6.8
2A25-06
2A25-05
RADIO
WRKSTNS
2B25
2A25-14
2A25-15
2A25-11
2A25-12
2B09-06
3D
2B09
2B09-05
+90"
FOR TEMPERATURE
MONITORING SYSTEM
2B09-04
CORR
2BC2
2B09-03
KP
W 2B16-01
2B07-01
LAC
2B07
S COMM
2B05
2BC1
FOR CONNECTION
TO LECTERN
CLASSROOM
2B04
BEHIND TV/MONITOR
FOR CONNECTION
TO LECTERN
SIZES WITH INTEL PERSONNEL PRIOR TO FINALIZING
CAMERA LOCATION. 2
7. ALL CIRCUITS, CONDUITS AND OTHER TRADE UTILITIES
NOT SERVING THIS AREA MUST ROUTE AROUND THE
PERIMETER AND MUST NOT PENETRATE THE PERIMETER
WALL.
8. PROVIDE CARD READERS ON THE INTERIOR AND
EXTERIOR OF THE DOOR TO THE INTEL SUITE, TO
SUPPORT 'CARD-IN / CARD-OUT' FUNCTIONS.
9. COORDINATE EXACT CONDUIT STUB-UP LOCATIONS
WITH JTAC SIM EQUIPMENT VENDOR.
2A25-16
2A25-17
2A25-13
CORR
2BC3
+60" +60"
2B04-05 2B04-04 2B04-03 2B04-02
6.3
2A25-04
JAN
2B17
ELEC
2B1 6
TLT, W
2B15
STOR
2B 06
T T TV TV T T 2B04-01S
2A25-03
2B20-02
2B20-03S
S S
TLT, M
2B18
1-1/4"EC
T S 2B21-02S
SECURE AREA
COMM SEE SHEET ET402 FOR
2B12-02
2B12-01
SIM OFFICE
2B10
TV
2B12-03
2B12-04
NOTE 9
JTAC SERVER
2B14
SEE SHEET ET402
FOR EQUIPMENT
LAYOUT IN THIS
ROOM
Reg. No. 256149 expires 12-31-22 3
2B20-05S 2B21-01 2B24 EQUIPMENT LAYOUT KP NOTE 2 4"C FOR DATA
2A25-01 NOTE 8
S
PR A S
2B20-06
2B20-04 2B20-01S
2B20-09S
2B20-10
2B20-08
S
2B20-11S
NCOIC
2B21 2B21-03
NOTE 7 IN THIS ROOM CORR
2BC5
DC EPO2
2B12-01
EPO1
NOTE 3
CABLES
2"C SPARE
RADIO STOR
2A25-02
NOTE 6
2B20-25S
2B20-24 +60"
2B20-07S
INTEL
PI 2B20
2B23
2B08-01 2B08-02
ATC SIM
2"C
(2) CAT6 CABLES IN
NOTE 9
4"C FOR DATA CABLE
FROM WORKSTATION
TO SIMULATOR
2B25A 2BC4 +90" 2B20-27 NOTE 7
S SEE SHEET ET402 FOR 2B08 2"C 1-1/4"C FOR EMERGENCY
2B20-23
+90"
2B20-26
2B20-12
2B20-13S
2B22-01S
2B22-02
EQUIPMENT LAYOUT
IN THIS ROOMS
SYSTEM SHUTDOWN
STAIR
2BS3
1-1 /4"EC (TYP)
2B20-22
2B20-21S
2B20-20
2B20-16S
2B20-17
2B20-19S
2B20-18
S
2B20-14S
2B20-15
OIC/DEP
2B22
2B22-03
2B22-04S
NOTE 7
2B08-04
2B08-03
2B12-03
JTAC SIM
2B12
NOTE 4
2B12-02
NOTE 5 S S S T
E.2
E.4 E.9 F
F.5 F.8
E6
G H
H.3
J J.2
J.5
K K.2
L L.5
2A
2B
V
T T T
T T T
E
S H
E E
T E
T
F
Q
U
IP
M E
N T
L A
Y O
H E
S E
R O
O e s ig n e d B y
R H
U G
G w n
U G
G e c k e d
T K
IS
v ie w e d B y
K C
H
IL
te
J
U N
E
F il e
N o
M E
Y
I.
S
.O S h e e t F il e
N a m e
S O
F S
P E
C
IA
L T
A C
T
IC
S O
P E
R A
T
IO
C
IL
R
L B
U R
T F
IE
L D
A
R M
Y E
N G
IN
E
E R
D
IS
T R
R P
S O
F E
N G
IN
E
E
B
IL
E
A L A
B A
L E
C O
M F
L O
O R
P L A
N
B L O
C K m b o l N o
D p ro v li c it a ti o n N u m b
8-
-R
-0
PLAN NORTH SECOND FLOOR KEY PLAN
TELECOM FLOOR PLAN - BLOCK 2B IDENTIFICATION
SCALE: 1/8" = 1'-0"
0 4' 8' 16' ET123
SCALE: 1/8"=1'-0" SHEET 514 of 565
U s e rs
\h u g g in s r\
D o c u m e n ts
\2 -E
R o b e rt h .r v t
/1
/2
:2
:1
2B23
2B24
2B05
D e s c ri p ti v is io
TBB (TYP)
SPACE RESERVED FOR FIRE
PROTECTION EQUIPMENT
MECHANICAL EQUIPMENT
BACKBONE CONDUITS
FROM COMM 1A19
NOTES:
1. PROVIDE CASCADE-TYPE CABLE DROP FITTINGS ABOVE
EQUIPMENT RACK.
2. WALL MOUNTED ENCLOSURE, 12" DEEP, REMOVABLE
FRONT COVER, SIZE AS SHOWN.
Mobile District
1 2B03-02 W
NOTE 4
COMM2A2 18"x4"CT
TBB (TYP) (3) 4" SLEEVES
3. TO EXTERIOR MOUNTED ENCLOSURE, SEE SHEET ET115. 1
ROUTE CONDUITS ABOVE ACCESSIBLE CEILING.
TGB
BACKBONE CONDUITS
FROM COMM 1A19
2B03-01
CATC IDTC
TEQR-2B03-01
TEQR-2B03-02
TEQR-2B03-03
J
18"x4"CT
(3) 4" SLEEVES
2B05-01
TEQR-2B05-01
TEQR-2B05-02
COMM2A1
MECHANICAL
EQUIPMENT
4. PROVIDE ALL TEQRS AS ENCLOSED LOCKABLE TYPE
RACKS.
5. ALL 'S' & 'TS' OUTLETS MUST BE SURFACE MOUNTED AND
MUST BE PROVIDED STRICTLY FOLLOWING ALL PDS
CRITERIA. ALL CONDUITS LEAVING THIS SPACE MUST BE
COORDINATED WITH MECHANICAL, FIRE PROTECTION
AND OTHER TRADES TO GROUP PENETRATIONS INTO A
SINGLE GENERAL LOCATION.
6. CONTRACTOR MUST PROVIDE MECHANICAL DUCT
MOUNTED SOUND MASKING SPEAKERS IN ALL DUCTS
ENTERING THE SECURE AREA SPACE. SPEAKERS MUST
BE DESIGNED SPECIFICALLY FOR MOUNTING INSIDE
MECHANICAL DUCT. COORDINATE QUANTITIES AND LOCATIONS WITH MECHANICAL DESIGN. PROVIDE
2 B2
TELECOM ROOM 2A (2B03)
SCALE: 1/4" = 1'-0" TELECOM ROOM 2B (2B05)
SCALE: 1/4" = 1'-0"
SOUND MASKING GENERATOR IN TEQR LOCATED IN
SECURE AREA COMM 2B24. PROVIDE CABLING FROM 2
GENERATOR TO SPEAKERS. BASIS OF DESIGN FOR
SOUND MASKING SPEAKER IS: CAMBRIDGE DYNASOUND
DS2400.
7. PROVIDE CARD READERS ON THE INTERIOR AND
EXTERIOR OF THE DOOR TO THE SECURE AREA, TO
SUPPORT 'CARD-IN / CARD-OUT' AND ACTIVITY LOGGING
FUNCTIONS.
BACKBONE CONDUITS
FROM COMM 1A19
NOTE 3 8. MOUNT PANEL SEMI-RECESSED. ONLY RECESS PANEL
AS DEEP AS FURRING ON WALL. DO NOT PENETRATE
SECURE WALL SYSTEM.
3 EM22A3
TBB (TYP)
6 COMM
CEILING
(6) 4" EC
NOTE 2
IDS
NOTE 8
2B23-01S
2B23-02
TV T
1-1/4"EC
2B23-03
2B24-01 W
MECHANICAL EQUIPMENT
SECOND
FLOOR
4' - 6"
ES
NOTE 6
NOTE 7
TEQR-2B24-01 2B23-04
H.3 TEQR-2B24-02 J
TEQR-2B24-03
H.3 J
2B23-05 TS
SECURE AREA COMM (2B24) RADIO WORKSTATIONS (2B25) - 2B23-22 2B23-06S S
B4 SCALE: 1/4" = 1'-0"
TELECOM ENCLOSURE & CONDUIT
SCALE: 1/4" = 1'-0"
TS 2B23-21
S 2B23-20S
2B23-07
2B23-19
2B23-08 TS
2B23-09S S 4
6.3
CONDUITS FOR SIMULATOR,
SEE ET123 FOR C ONTINUATIO N
BACKBONE CONDUITS
FROM COMM 1A19
6.3
TS 2B23-18
5 S 2B23-17S 2B23-10
TBB (TYP) TGB
JTAC SERVER
2B14 NOTE 1
NOTE 3
2B23-16
2B23-11 TS
2B23-12S S
JTAC SERVER
2B14
18"x4"CT
MECHANICAL
EQUIPMENT
CEILING
(3) 4" EC
TS 2B23-15
S 2B23-14S
S 2B23-13S
2B14-02 W
5 6 2B14-01S
S 6
SECOND
FLOOR
2' - 9"
NOTE 2
H.3 J
L L.5 L
A
C
S E R
V E
2B03 2B03
2B05
2B24
DC
NOTE 5
NOTE 4
N B
T E
Q R
-2 B
-0
T E
Q R
-2 B
-0
T E
Q R
-2 B
-0
"x
4"
"x
4"
4"
4" C
T
"x
4"
F S
P E
C
IA
L T
A C
T
IC
S O
P E
R A
T
IO
C
IL
R
L B
U R
T F
IE
L D
L E
C O
M M
U N
IC
A
T
IO
N S
E N
L A
R G
O M
P L A m b o l N o
D p ro v
E2
E4
B6 te
J
U N
E
F il e
N o
M E
Y
I.
S
.O S h e e t F il e
N a m e
S o li c it a ti o n N u m b
8-
-R
-0
D e s ig n e d B y
R H
U G
G w n
U G
G e c k e d
T K
IS
v ie w e d B y
K C
H
IL
A
R M
Y E
N G
IN
E
E R
D
IS
T R
R P
S O
F E
N G
IN
E
E
B
IL
E
A L A
B A
R (2B14)
SCALE: 1/4" = 1'-0"
L.5
INTEL (2B20) -
TELECOM ENCLOSURE & CONDUIT
SCALE: 1/4" = 1'-0"
ENLARGED SECURE AREA (2B23)
SCALE: 1/4" = 1'-0"
2' 4' 8'
IDENTIFICATION
SCALE: 1/4"=1'-0" SHEET 516 of 565
U s e rs
\h u g g in s r\
D o c u m e n ts
\2 -E
R o b e rt h .r v t
/1
/2
:2
:3
G5
COMM 2B03
INTRUSION DETECTION NOTES:
1. STUB OUT FOR NETWORK CONNECTION WITH BASE
SECURITY OFFICE FOR SYSTEM ALARM.
COORDINATE WITH BASE SECURITY PERSONNEL.
COMM 2B03
TELEVISION DISTRIBUTION NOTES:
1. CONTRACTOR MUST PROVIDE AMPLIFIERS,
SPLITTERS, MIXERS, LINE TERMINATORS, TAPS AND
ANY OTHER PERIPHERALS AS REQUIRED TO
SUPPORT DEVICES SHOWN ON PLANS.
2. CURRENT BASE CABLE TV SERVICE PROVIDER
(COX COMMUNICATIONS) WILL PROVIDE CATV
SERVICE THROUGH EXISTING AND NEW DUCTBANK
SYSTEM. CONTRACTOR MUST VERIFY SERVICE
PROVIDER.
6"
FIRE-RATED
PENETRATION, TYP
CABLE TRAY
TO OTHER TRS
FIRE-RATED
PENETRATION, TYP
CABLE TRAY
TO OTHER TRS
ID
COMM 1A19
ID T
1"C, TYP.
PROVIDE PULL
BOXES AS REQUIRED
COMM 1A19
TV TV
PROVIDE
T PULL BOXES
AS REQUIRED
IDTC
TYPICAL FOR EACH
TR, SEE FLOOR
PLANS FOR EXACT
DEVICE LOCATIONS,
TYPE AND QUANTITY.
CABLE TELEVISION
SERVICE PROVIDER
BUILDING ENTRANCE.
CABLING ROUTED IN
MAIN TELECOM
4 DUCTBANK SYSTEM
FIRST
TVTC
PROVIDE TELEVISION DISTRIBUTION SYSTEM
TERMINAL CABINETS AND PERIPHERALS AS
TYPICAL FOR EACH
TR, SEE FLOOR
PLANS FOR EXACT
DEVICE LOCATIONS,
TYPE AND QUANTITY.
FIRST
FLOOR
6"
INTRUSION DETECTION SYSTEM (IDS)
TERMINAL CABINET, EQUIPMENT, CABLING
AND PERIPHERALS, BY OTHERS (GFGI)
SINGLE LINE DIAGRAM -
INTRUSION DETECTION SYSTEM
SCALE: NOT TO SCALE
REQUIRED FOR DEVICES SHOWN ON DRAWINGS (TYP)
NOTE 1 (TYP)
CABLING AS
REQUIRED,
BY OTHERS.
NOTE 2 (TYP) 6" SQUARE JUNCTION BOX
WITH BLANK COVER ABOVE
ACCESSIBLE CEILING
CEILING
SINGLE LINE DIAGRAM -
B5
TELEVISION DISTRIBUTION SYSTEM
TYPICAL
CONF ROOM
1-1/2"C.
2-GANG DATA BOX, RECESSED
WALL MOUNTED, PROVIDE WALL
PLATE WITH FLEXIBLE GROMMET
1-1/2"C.
2"C.
SCALE: NOT TO SCALE
INSERT. COORDINATE FINAL
JUNCTION BOX LOCATION WITH
ARCHITECTURAL. SEE DETAIL
A1/ET602 FOR COVER PLATE.
FINISHED
COORDINATE
LOCATION WITH
VTC EQUIPMENT
MANUFACTURER
CEILING MOUNTED
MICROPHONES. DEVICES
AND CABLING, BY OTHERS.
M0507 - VIDEO TELECONFERENCING
SYSTEM, CABLING BY OTHERS
LOCATED AT WORKSTATION
(HEADEND EQUIPMENT LOCATION)
2-GANG DATA BOX, RECESSED WALL MOUNTED,
PROVIDE WALL PLATE WITH FLEXIBLE GROMMET
INSERT. COORDINATE FINAL JUNCTION BOX
LOCATION WITH ARCHITECTURAL. SEE DETAIL
TYPICAL, SEE FLOOR
PLANS FOR EXACT
LOCATIONS, TYPE AND
QUANTITY.
LOCATED AT
LECTERN
A1/ET602 FOR COVER PLATE.
TVTC
IDTC
N B
S O
F S
P E
C
IA
L T
A C
T
IC
S O
P E
R A
T
IO
C
IL
R
L B
U R
T F
IE
L D
L E
C O
M S
IN
G
L E
L
IN
E D
IA
G
R A m b o l N o
D e s c ri p ti v is io p ro v
F4 a te
J
U N
E
F il e
N o
M E
Y
I.
S
.O S h e e t F il e
N a m e
S o li c it a ti o n N u m b
8-
-R
-0
D e s ig n e d B y
R H
U G
G w n
U G
G e c k e d
T K
IS
v ie w e d B y
K C
H
IL
A
R M
Y E
N G
IN
E
E R
D
IS
T R
R P
S O
F E
N G
IN
E
E
B
IL
E
A L A
B A
6 SINGLE LINE DIAGRAM -
VIDEO TELECONFERENCING SYSTEM (TYP)
SCALE: NOT TO SCALE
VIDEO TELECONFERENCE NOTES:
1. TERMINATE ALL CONDUITS WITH NYLON INSULATED BUSHING AND BONDING BUSHINGS,
AS REQUIRED. PROVIDE FIRE STOP WHERE REQUIRED.
2. PROVIDE ALL OPEN KNOCKOUTS WITH BUSHINGS.
3. UPON COMPLETION OF SYSTEM INSTALLATION, CONTRACTOR MUST TEST AND VERIFY
THAT SYSTEM IS IN PROPER WORKING CONDITION.
SHEET
IDENTIFICATION
ET503
SHEET 519 of 565
U s e rs
\h u g g in s r\
D o c u m e n ts
\2 -E
R o b e rt h .r v t
/1
/2
:2
:4
File details come from the government source that posted it. Updated .