VOIDED Solicit Amendment 1_FA441723R0009-0001 SF 30.pdf
PDF 624 KB Posted
- Attached to
- ADDITION TO CDC WEST BLDG 90306, CP1024656
- Solicitation number
- FA441723R0009
About this file
This document is an amendment to a solicitation for the addition to a Child Development Center West Building at Hurlburt Field in Florida. The solicitation number is FA441723R0009 and the project number is CP1024656.
The amendment corrects the project number, extends the site visit date to August 30th, 2023 at 9:00am CST, extends the response due date to September 19th, 2023 at 2:30pm CST, clarifies questions submission deadlines and procedures, and provides details on base access requirements for the site visit or proposal delivery. Offerors must submit one electronic copy of their proposal on a CD or DVD to 1 SOCONS/PKB at Hurlburt Field by the amended due date. The NAICS code for this requirement is 236220 for construction of other new nonresidential structures with a size standard of $45 million. The magnitude of the project is estimated between $1 million to $5 million.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment is to correct the project number, to extend the Site Visit date, Block 14 (Description of Amendment/Modification):
to extend the solicitation closing date, to correct the cut off time for answering the solicitation questions and to correct the solicitation Section H Special Contract Requirements regarding the Questions and the Submission of Proposals.
a. To correct the project number from CP1018887 to read "CP1024656".
b. To change the SF 1442, Block 13. paragraph a. The proposal closing date is changed from 11 September 2023 to read "19 September 2023 at 2:30 p.m. CST".
c. To change the SF 1442, Block 10. paragraph D. Paragraph D. is changed to read as follows:
"D. A site visit will be conducted on 30 August 2023 at Hurlburt Field AFB, Florida at 9:00 a.m. CST. See Section H SUBMISSION OF PROPOSALS for the Site Visit details.
d. Correct Section H - Special Contract requirements Submission of Questions to read as follows:
SUBMISSION OF QUESTIONS: Questions regarding this solicitation must be submitted in writing via email to the two individuals listed above in Section G no later than close of business at 4:00 p.m., CST, 5 business days after the date of the site visit.
e. Change Section H - Special Contract Requirements Submission of Proposals to read as follows:
SUBMISSION OF PROPOSALS: Offeror is responsible for submitting proposal so as to reach the NAFI Contracting office designated in the solicitation by the date/time specified. Personnel requiring access to Hurlburt Field for the purpose of delivering a proposal or attending the site visit must Email a written request containing the company name and the full name (First, Middle, Last) of person(s) requiring access to the Contract Specialist, Christine Young (christine.young.1@us. af. mil), and the Contracting Officer, Tina Kneip (tina.kneip.14@us.af.mil). Hurlburt Field base access requests must be received NLT 72 hours prior to the date and time established for receipt of proposals. All individuals will enter through the Commercial gate, (CVI gate) located on Downs Rd, Hurlburt Field and the CVI gate entrance/exit is located off of Martin Luther King Jr Blvd.
Please allow extra time to obtain your temporary pass at the Commercial gate.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Construction Project Number
CP1018887 CP1024656
Contract Description
Project Title: ADDITION TO CHILD DEVELOPMENT
CENTER (CDC) WEST BUILDING 90306,
HURLBURT FIELD, FLORIDA
Project Number: CP1018887
A. This is a Request for Proposal unrestricted/Full and Open competition.
B. NAICS Code for this requirement: 236220, Standard Size $45 Million dollars.
C. The magnitude of this project is between $1 million and $5 million.
D. A site visit will be conducted on Wednesday, 23 August 2023 at Hurlburt Field AFB, Florida at 9:00 a.m.
CST. See Section L, Site Visit for details.
E. Enter Prices in Section B using, TYPED or BLACK
/BLUE INK ONLY.
F. Offer shall be registered in the System for Award Management (SAM) and Business to be eligible for award of contract.
G. All questions and proposal correspondence if applicable is to be sent directly to Tina L. Kneip, tina.
kneip.1@us.af.mil and Christine Young, christine.young.
1@us.af.mil.
Project Title: ADDITION TO CHILD DEVELOPMENT
CENTER (CDC) WEST BUILDING 90306,
HURLBURT FIELD, FLORIDA
Project Number: CP1024656
A. This is a Request for Proposal unrestricted/Full and Open competition.
B. NAICS Code for this requirement: 236220, Standard Size $45 Million dollars.
C. The magnitude of this project is between $1 million and $5 million.
D. A site visit will be conducted on Wednesday, 30 August 2023 at Hurlburt Field AFB, Florida at 9:00 a.m.
CST. See Section H, Submission of Proposals for the Site Visit details.
E. Enter Prices in Section B using, TYPED or BLACK
/BLUE INK ONLY.
F. Offer shall be registered in the System for Award Management (SAM) and Business to be eligible for award of contract.
G. All questions and proposal correspondence if applicable is to be sent directly to Tina L. Kneip, tina.
kneip.1@us.af.mil and Christine Young, christine.young.
1@us.af.mil.
FA441723R00090001
H. Offeror shall submit one electronic copy (CD or DVD) only of the proposal. Email proposal submissions will not be accepted. Disks may be hand carried or mailed using FedEx or UPS to:
1 SOCONS/PKB, Attention: Tina L. Kneip and Christine Young, 350 Tully Street, Building 90339, Hurlburt Field, FL 32544-5640.
H. Offeror shall submit one electronic copy (CD or DVD) only of the proposal. Email proposal submissions will not be accepted. Disks may be hand carried or mailed using FedEx or UPS to:
1 SOCONS/PKB, Attention: Tina L. Kneip and Christine Young, 350 Tully Street, Building 90339, Hurlburt Field, FL 32544-5640.
Response Due Date
11 Sep 2023 19 Sep 2023
Section H - Special Contract Requirements
Miscellaneous text in this section has been modified to:
SUBMISSION OF QUESTIONS: this solicitation must be submitted in writing via email to the two individuals listedQuestions regarding above in Section G .no later than close of business at 4:00 p.m., CST, 5 business days after the date of the site visit
SUBMISSION OF PROPOSALS: Offeror is responsible for submitting their proposal so as to reach the NAFI Contracting office designated in the solicitation by the date/time specified. Personnel requiring access to Hurlburt Field for the purpose of delivering a proposal or attending the site visit must email a written request containing the company name and the full name (First, Middle, Last) of person(s) requiring access to the Contract Specialist, Christine Young(christine.young.1@us. af.mil), and the Contracting Officer, Tina Kneip (tina.kneip.14@us.af.mil). Hurlburt Field base access requests must be received NLT 72 hours prior to the date and time established for receipt of proposals . All individuals will enter through the Commercial gate, (CVI gate) located on Downs Rd, Hurlburt Field and the CVI gate entrance/exit is located off of Martin Luther King Jr Blvd. Please allow extra time to obtain your temporary base pass at the Commercial gate.
VALID ID: For either the site visit or submission of proposals, all personnel requesting access to Hurlburt Field must possess a valid State or Government picture identification card. Furthermore, individuals presenting identification cards from a state that is non-compliant with the REAL ID Act will require additional documentation to gain base access. Additional documentation includes a valid U.S. or foreign government issued passport, an employment authorization document that contains a photograph, or identification cards issued by federal state or local government agencies that include a photo and biographic information. A full list of REAL ID Act compliant and non-complaint states can be found at https://www.dhs.gov/real-
id. Personnel requesting vehicle access to Hurlburt Field must provide a valid driver's license, current vehicle registration, and valid vehicle insurance.
SITE PROTECTION DURING HURRICANE SEASON
Normally, the period from 1 June through 30 November is the premier season for Hurricanes, Tropical Storms and Tropical Depressions for Hurlburt Field, FL and surrounding areas. In the event of a hurricane and at the direction of the Contracting Officer, the Contractor shall be responsible for:
a) Securing all equipment, materials and cleaning up the work area;
b) Continuing normal operations until directed otherwise by the Contracting Officer;
c) Evacuating the base as directed by the Contracting Officer;
d) Provide a POC to the Contracting Officer to recall the contractor after the danger is over;
e) Be prepared to resume normal operations when notified by the Contracting Officer. The work site should be free of objects capable of becoming airborne and causing a hazard. For service contracts, damages occurring as a result of contractor debris are the responsibility of the contractor and will be handled in accordance with FAR 52.237-2, this clause and other requirements of this contract. For construction contracts, per FAR clauses 52.236- 9 and 52.236-12, you are required to maintain your work area free of debris and in a safe and secure condition at the completion of each workday with particular care during the hurricane season.
SPECIAL CLAUSES FOR CONSTRUCTION
NFC-203-14 - DISPLAY OF HOTLINE POSTER(S) (JUN 2020)
(a) Definition.
"United States," as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) . Except as provided in paragraph (c)Display of fraud hotline poster(s)
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites.
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
Poster(s) Obtain from
Defense Hotline Posters http://www.dodhotline.dodig.mil/Hotline/posters.cfm
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph(d), in all subcontracts that exceed $5.5 million, except when the subcontract
(1) Is for the acquisition of a commercial item; or
(2) Is performed entirely outside the United States.
(End of clause)
NFC-222-36 - EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
the requirements of the equal opportunity clause at 41 CFR 60-(a) Equal opportunity clause. The Contractor shall abide by
741.5(a),as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(c) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
NFC-225-9 - BUY AMERICAN-CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause--"Commercially available off-the-shelf (COTS)item"
(1) Means any item of supply (including construction material) that is
(i) A commercial item;
(ii) Sold insubstantial quantities in the commercial marketplace; and
(ii) Offered to the NAFI, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Component" means an article, material, or supply incorporated directly into a construction material.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting ,fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the NAFI are supplies, not construction material.
"Cost of components" means
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty(whether or not a duty-free entry certificate is issued); or
For components manufactured by the Contractor, all costs associated with the manufacture of the component, including(2) transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
"Domestic construction material" means
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which non availability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
"Foreign construction material" means a construction material other than a domestic construction material.
"United States" means the 50States, the District of Columbia, and outlying areas.
(a) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the NAFI as follows:
NONE ______________________________________[Contracting Officer to list applicable excepted materials or indicate "none"]
(2) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the NAFI determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(b) Request for determination of inapplicability of the Buy American statute.
(1)
Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for NAFI evaluation of the request, including
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) the market and A request based on unreasonable cost shall include a reasonable survey of a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction issued).site and any applicable duty (whether or not a duty-free certificate may be
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the NAFI determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the NAFI determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(a) Data. To permit evaluation of requests under paragraph (c)of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[ ]Include other applicable supporting information.
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
NFC-252-2 - CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Full text is available online at: https://www.afnafpo.afsv.net/pages/Construction-Support/Construction-Support.aspx (NAF Contracting).
CLAUSES INCORPORATED BY REFERENCE
NFC-202-1 Definitions
NFC-203-2 Certificate of Independent Price Determination
NFC-203-3 Gratuities
NFC-203-5 Covenant Against Contingent Fees
NFC-203-7 Anti-Kickback Procedures
NFC-203-8 Cancellation, Recession, and Recovery of Funds for Illegal or Improper Activity
NFC-203-
Price or Fee Adjustment for Illegal or Improper Activity
NFC-203-
Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions
NFC-203-
Limitation on Payments to Influence Certain Federal Transactions
NFC-203-
Contractor Code of Business Ethics and Conduct
NFC-203-
Contractor Employee Whistleblower Rights and Requirement to Inform appraisals
NFC-204-3 Taxpayer Identification
NFC-204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
NFC-204-9 Personal Identity Verification of Contractor Personnel
NFC-204-
Data Universal Numbering System Number Maintenance
NFC-204-
Incorporation by Reference of Representations and Certifications
NFC-209-2 Prohibition on Contracting with Inverted Domestic Corporations - Representation.
NFC-209-5 Certification Regarding Responsibility Matters
NFC-209-6
Protecting the NAFI's Interest When Subcontracting with Contractor's Debarred, Suspended, or Proposed for Debarment
NFC-209-9 Updates of Publicly Available Information Regarding Responsibility Matters
NFC-210-1 Market Research
NFC-211-
Commencement, Prosecution, and Completion of Work
NFC-211-
Time Extensions
NFC-215-2 Audit and Records--Negotiations
NFC-215-6 Place of Performance
NFC-215-8 Order of Precedence--Uniform Contract Format
NFC-222-1 Notice to the NAFI of Labor Disputes
NFC-222-4 Contract Work Hours and Safety Standards-Overtime Compensation
NFC-222-5 Employment Eligibility Verification.
NFC-222-6 Construction Wage Rate Requirements.
NFC-222-7 Withholding of Funds.
NFC-222-8 Payrolls and Basic Records
NFC-222-9 Apprentices and Trainees.
NFC-222-
Compliance with Copeland Act Requirements.
NFC-222-
Subcontracts (Labor Standards)
NFC-222-
Contract Termination- Debarment.
NFC-222-
Compliance with Construction Wage Rate Requirements and Related Regulations
NFC-222-
Disputes Concerning Labor Standards.
NFC-222-
Certification Regarding Knowledge of Child Labor for Listed End Products
NFC-222-
Previous Contracts and Compliance Reports
NFC-222-
Affirmative Action Compliance
NFC-222-
Affirmative Action Compliance Requirements for Construction.
NFC-222-
Employment Reports on Veterans.
NFC-222-
Compliance with Veterans' Employment Reporting Requirements
NFC-222-
Notification of Employee Rights Under the National Labor Relations Act.
NFC-223-1 Biobased Product Certification
NFC-223-2
Affirmative Procurement of Biobased Products Under Service and Construction
Contracts.
NFC-223-3 Hazardous Material Identification and Material Safety Data.
NFC-223-4 Recovered Material Certification
NFC-223-6 Drug-Free Workplace.
NFC-223-9 Estimate of Percentage of Recovered Material Content for EPA - Designated Items.
NFC-223-
Waste Reduction Program.
NFC-223-
Energy Efficiency in Energy-Consuming Products.
NFC-223-
Affirmative Procurement of EPA-designated Items in Service and Construction
Contracts.
NFC-223-
Encouraging Contractor Policies to Ban Text Messaging While Driving
NFC-224-1 Privacy Act Notification.
NFC-224-2 Privacy Act.
NFC-225-2 Buy American Act Certificate
NFC-225-4 Buy American Act--Free Trade Agreements--Israeli Trade Act Certificate
NFC-225-6 Trade Agreements Certificate
NFC-225-
Restrictions on Certain Foreign Purchases
NFC-227-1 Authorization and Consent.
NFC-227-2 Notice and Assistance Regarding Patent and Copyright Infringement.
NFC-227-4 Patent Indemnity- Construction Contracts.
NFC-227-6 Royalty Information
NFC-227-
Representation of Limited Rights Data and Restricted Computer Software
NFC-228-2 Additional Bond Security.
NFC-228-
Pledges of Assets
NFC-228-
Prospective Subcontractor Requests for Bonds.
NFC-228-
Irrevocable Letter of Credit.
NFC-228-
Performance and Payment Bonds- Construction.
NFC-229-3 Federal, State, and Local Taxes.
NFC-232-5 Payments under Fixed-Price Construction Contracts.
NFC-232-
Interest.
NFC-232-
Prompt Payment for Construction Contracts.
NFC-232-
Payment by Electronic Funds Transfer - Other than System for Award Management
NFC-232-
Unenforceability of Unauthorized Obligations.
NFC-233-3 Protest after Award.
NFC-233-4 Applicable Law for Breach of Contract Claim
NFC-236-2 Differing Site Conditions
NFC-236-3 Site Investigation and Conditions Affecting the Work.
NFC-236-5 Material and Workmanship.
NFC-236-6 Superintendence by the Contractor
NFC-236-7 Permits and Responsibilities.
NFC-236-8 Other Contracts.
NFC-236-9
Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
NFC-236-
Operations and Storage Areas.
NFC-236-
Use & Possession Prior to Completion.
NFC-236-
Cleaning Up.
NFC-236-
Accident Prevention.
NFC-236-
Availability and Use of Utility Services.
NFC-236-
Schedules for Construction Contracts.
NFC-236-
Layout of Work.
NFC-236-
Specifications and Drawings for Construction.
NFC-236-
Preconstruction Conference.
NFC-242-
Bankruptcy
NFC-242-
Suspension of Work
NFC-244-6 Subcontracts for Commercial Items
NFC-245-1 NAFI Property
NFC-246-
Warranty of Construction
NFC-248-1 Value Engineering--Construction
NFC-249-
Default (Fixed-Price Construction)
| IDCode: |
| Page: 1 |
| Pages: 17 |
| AmendNo: 0001 |
| EffDate: 18 Aug 2023 |
| ReqNo: |
| ProjNo: CP1024656 |
| IssCode: FA4417 |
| AdmCode: |
| IssuedBy: FA4417 1 SOCONS LGC |
350 TULLY ST BLDG 90339, CP 850 884 7602
HURLBURT FIELD, FL 32544-5810
UNITED STATES
Christine Young, Email: christine.young.1@us.af.mil Telephone: 850-884-3298
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA441723R0009 |
| SolDate: 18 Aug 2023 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: SHAWN D. EDWARDS |
| ContDate: |
| CODate: 18 Aug 2023 |
File details come from the government source that posted it. Updated .