AMENDMENT 4 - FA441723R0009-0004 - Released.pdf
PDF 599 KB Posted
- Attached to
- ADDITION TO CDC WEST BLDG 90306, CP1024656
- Solicitation number
- FA441723R0009
About this file
This document is an amendment to a solicitation for the addition to a Child Development Center at Building 90306 on Hurlburt Field in Florida. The solicitation is for construction services between $1 million to $5 million under a 100% small business set-aside. The Navy Facilities Engineering Command and Air Force Special Operations Command are the issuing and administering agencies. The amendment allows for electronic proposal submissions through either a disk or the Department of Defense Safe Site system by 17 November 2023. It provides updated instructions for the technical proposal, past performance documentation, teaming agreements, and questions regarding the opportunity. Pricing is to be submitted using the Standard Form 1442 and a 50 Division Construction Cost Estimate Worksheet.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The purpose of this amendment 4 is to add an electronic submission of the proposal using Block 14 (Description of Amendment/Modification):
DoD SAFE changing the SF1442, Block 9 paragraph H. and to make edits to Section L paragraph 2.1.1.1.
a. To change the SF1442, Block 9. paragraph H from " Offeror shall submit one electronic copy (CD or DVD) only of the proposal. Email proposal submissions will not be accepted. Disks may be hand carried or mailed using FedEx or UPS to: 1 SOCONS/PKB, Attention: Tina L. Kneip and Christine Young, 350 Tully Street, Building 90339, Hurlburt Field, FL 32544-5640". To read "H. Offeror shall submit one electronic copy (CD or DVD) or DoD SAFE submission of the proposal. Email proposal submissions will not be accepted. Contractors may submit proposals electronically to the Government via the DoD SAFE site (https://safe.apps.mil/). If submitting via DoD SAFE site, the offeror shall send an email requesting an "Electronic Drop Authorization" to personnel listed below no later than (NLT) 17 November 2023 NLT 1:00 p.m. CST to Ms. Tina Kneip, tina.kneip.
1@us.af.mil and Chris Young, christine.young.1@us.af.mil. Title of the electronic documents should include the title and the offerors CAGE code (e.
g. "VOL 1 PRPSL KTR RESPN_CAGE#"). All documents submitted must be saved in .pdf format except for the 50 division excel worksheet (Attachment L3) and shall follow the instructions in Section L paragraph 2.1.1.1. Disks may be hand carried or mailed using FedEx or UPS to: 1 SOCONS/PKB, Attention: Tina L. Kneip and Christine Young, 350 Tully Street, Building 90339, Hurlburt Field, FL 32544-5640.
b. The solicitation Section L paragraph 2.1.1.1 is revised to read as follows;
2.1.1.1 Proposals SHALL be submitted electronically on disk (CD or DVD) or through DoD SAFE. The electronic copies of the proposal shall be submitted in a format readable by portable document format (PDF), Microsoft (MS) Office Word 365, MS Office Excel 365, and MS Office Power Point 365. Microsoft (MS) versions 97-2003, 2010 or 2016 can also be utilized. The 50 division excel worksheet (Attachment L3) MUST be submitted in an editable format (excel), a pdf version may accompany the excel file as an addition, if desired. Do not embed files into the proposal documents. Embedded files will not be evaluated. Contractors may submit proposals electronically to the Government via the DoD SAFE site (https://safe.apps.mil/). If submitting via DoD SAFE site, the offeror shall send an email requesting an "Electronic Drop Authorization" to personnel listed below no later than (NLT) 17 November 2023 NLT 1:00 p.m. CST to Ms. Tina Kneip, tina.kneip.1@us.af.mil and Chris Young, christine.
young.1@us.af.mil. The title of the electronic proposal documents should include the title and the offerors CAGE code (e.g. "VOL 1 PRPSL KTR RESPN_CAGE#"). Disks may be hand carried or mailed using FedEx or UPS to 1 SOCONS/PKB, Attention: Tina L. Kneip and Christine Young, 350 Tully Street, Building 90339, Hurlburt Field, FL 32544. Packages shall be marked with attention to Tina L. Kneip and Christine Young.
Contractors should request base access for hand carried proposals NLT 72 hours prior to proposal due date/time. Email proposal submissions will not be accepted.
Section A - Solicitation/Contract Form
The following changes have been made:
INFORMATION FROM TO
Project Title: ADDITION TO
CHILD DEVELOPMENT
CENTER (CDC) WEST
BUILDING 90306,
HURLBURT FIELD,
FLORIDA
Project Number: CP1024656 A. This is a Request for Proposal under a 100% Small Business set aside.
B. NAICS Code for this requirement: 236220, Standard Size $45 Million dollars.
C. The magnitude of this project is between $1 million and $5 million.
D. A site visit will be conducted on Thursday, 26 October 2023 at Child Development Center, West, 26 Weaver St, Building 90306, Hurlburt Field AFB, Florida at 2:00 p.m. CST. See Section H, Submission of Proposals for the Site Visit details.
E. Enter Prices in Section B
Project Title: ADDITION TO CHILD DEVELOPMENT CENTER (CDC) WEST
BUILDING 90306, HURLBURT FIELD, FLORIDA
Project Number: CP1024656 A. This is a Request for Proposal under a 100% Small Business set aside.
B. NAICS Code for this requirement: 236220, Standard Size $45 Million dollars.
C. The magnitude of this project is between $1 million and $5 million.
D. A site visit will be conducted on Thursday, 26 October 2023 at Child Development Center, West, 26 Weaver St, Building 90306, Hurlburt Field AFB, Florida at 2:00 p.m. CST. See Section H, Submission of Proposals for the Site Visit details.
E. Enter Prices in Section B using, TYPED or BLACK/BLUE INK ONLY.
F. Offer shall be registered in the System for Award Management (SAM) and
FA441723R00090004
Contract Description using, TYPED or BLACK
/BLUE INK ONLY.
F. Offer shall be registered in the System for Award Management (SAM) and Business to be eligible for award of contract.
G. All questions and proposal correspondence if applicable is to be sent directly to Tina L. Kneip, tina.kneip.1@us.af.
mil and Christine Young, christine.young.1@us.af.mil.
All questions are to be emailed not later than 4:00 p.
m. CST on Friday, 3 November 2023.
H. Offeror shall submit one electronic copy (CD or DVD) only of the proposal. Email proposal submissions will not be accepted. Disks may be hand carried or mailed using FedEx or UPS to:
1 SOCONS/PKB, Attention:
Tina L. Kneip and Christine Young, 350 Tully Street, Building 90339, Hurlburt Field, FL 32544- 5640.
Business to be eligible for award of contract.
G. All questions and proposal correspondence if applicable is to be sent directly to Tina L. Kneip, tina.kneip.1@us.af.mil and Christine Young, christine.young.1@us.af.
mil. All questions are to be emailed not later than 4:00 p.m. CST on Friday, 3 November 2023.
H. Offeror shall submit one electronic copy (CD or DVD) or DoD SAFE submission of the proposal. Email proposal submissions will not be accepted. Contractors may submit proposals electronically to the Government via the DoD SAFE site (https://safe.apps.mil/). If submitting via DoD SAFE site, the offeror shall send an email requesting an "Electronic Drop Authorization" to personnel listed below no later than (NLT) 17 November 2023 NLT 1:00 p.m. CST to paragraph G above.
Disks may be hand carried or mailed using FedEx or UPS to: 1 SOCONS/PKB, Attention: Tina L. Kneip and Christine Young, 350 Tully Street, Building 90339, Hurlburt Field, FL 32544-5640.
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
1.0 GENERAL INSTRUCTIONS
1.1 General Information
1.1.1 The offeror's proposal must include all data and information requested by these Instructions to Offerors and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements as stated in the Specifications and Solicitation. Non-conformance with the instructions provided in these Instructions to Offerors may result in an unfavorable proposal evaluation.
1.1.2 The proposal acceptance period is specified in Block13, SF 1442, of this solicitation. By signing block 20B of the SF 1442, the offeror certifies that the proposal is valid from the due date and time listed in block 13A through the entire period specified in block 13D.
1.1.3 All referenced documents for this solicitation are available on the Contract Opportunities website at https://sam.gov/. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
1.1.4 The NAFI/Contracting Officer reserves the right to revise or amend the specifications, drawings, or the solicitation prior to the proposal closing time. Such revisions or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted on the SAM.gov website. If such amendments require material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable offerors to revise their proposals. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal, either by completing SF 1442 Block 19, providing signed copies of the amendments with their proposal (Section III), or by separate letter which includes a reference to the solicitation and amendment numbers.
1.1.5 The Contracting Officer/Contract Specialist listed below are the point of contacts for this acquisition. Address any questions or concerns you may have to the Contracting Officer. Written requests for clarification may be sent to the Contracting Officer and Contracting Specialist at the following email addresses:
Contracting Officer: Tina L. Kneip, Email:tina.kneip.1@us.af.mil
Contracting Specialist: Christine M. Young,christine.young.1@us.af.mil
1.1.6 The NAFI/Contracting Officer will retain a copy of all unsuccessful proposals.
1.1.7 The Contracting Officer will notify unsuccessful offerors of the source selection decision in accordance with AFMAN paragraph 8.4. Upon such notification, unsuccessful offerors may request a debriefing within 3 days from the date that the offeror received notification of contract award. The debriefing request must be inwriting sent in email to the addresses in paragraph 1.1.5 above.
1.1.8 If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale as well as the remedies the offeror is asking the Contracting Officer to consider as related to the claimed omission or error. The offeror is reminded that the NAFI reserves the right to award this effort based on the initial proposal, as received, without discussions. This reservation includes matters of additional or substitute pages of the initial proposal.
1.1.9 The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested. However, if at any time during this competition the Contracting Officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
1.1.10 Who Can Participate. This acquisition is a Full and Open competition procurement. All companies can compete on this acquisition. At the time of initial contract offer and at time of award, each business must be active in SAM.gov and are otherwise eligible.
2.0 SPECIFIC PROPOSAL INSTRUCTIONS
2.1 The following instructions are to aid in the evaluation process.
2.1.1 Offerors are responsible for submitting proposals (including any revisions, and amendments) to reach the office designated in this solicitation by the time specified in this solicitation. Bid bonds must be included with the proposal package and be received at or before the time specified in this solicitation. Only electronic versions of the proposals will be accepted. Paper copies of proposals will not be evaluated, they will be rejected, and will not be considered for award.
2.1.1.1 Proposals SHALL be submitted electronically on disk (CD or DVD) or through DoD SAFE. The electronic copies of the proposal shall be submitted in a format readable by portable document format (PDF),Microsoft (MS) Office Word 365, MS Office Excel 365, and MS Office Power Point365. Microsoft (MS) versions 97-2003, 2010 or 2016 can also be utilized. The 50division excel worksheet (Attachment L3) MUST be submitted in an editable format (excel), a pdf version may accompany the excel file as an addition, if desired. Do not embed files into the proposal documents.
Embedded files will not be evaluated. Contractors may submit proposals electronically to the Government via the DoD SAFE site (https://safe.
).If submitting via DoD SAFE site, the offeror shall send an email requesting an "Electronic Drop Authorization" to personnel apps.mil/ listed below no later than (NLT) to Ms. Tina Kneip, tina.kneip.1@us.af.mil and Chris Young, 17 November 2023 NLT 1:00 p.m. CST
. The title of the electronic proposal documents should include the title and the offerors CAGE code (e.g. "VOL 1 christine.young.1@us.af.mil Disks may behand carried or mailed using FedEx or UPS to 1 SOCONS/PKB, Attention: Tina L. Kneip and PRPSL KTRRESPN_CAGE#").
Christine Young, 350 Tully Street, Building 90339, Hurlburt Field, FL 32544. Packages shall be marked with attention to Tina L. Kneip and Christine Young. Contractors should request base access for hand carried proposals NLT 72 hours prior to proposal due date/time. Email proposal submissions will not be accepted.
SECTION L CONTINUED
2.1.1.2 Proposals shall contain the header of "Controlled Unclassified Information" and "Source Selection Information.
2.1.2 Any proposal, bond, modification, or revision, that is received at the designated office after the exact time specified for receipt of proposals will be "late" and will not be considered unless the Contracting Officer determines the criteria set forth in FAR 15.208 exists.
2.1.3 Proposals shall be complete, clearly presented, and include sufficient detail for effective evaluation as detailed in section M of this solicitation and for substantiating validity of stated claims. The proposal should not simply rephrase or restate the requirements but rather provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the NAFI Contracting Officer has no prior knowledge of the offeror's facilities and/or experience and will rely heavily, on the information presented in the offeror's proposal. Evaluation of a proposal will be conducted solely on the information contained within the proposal package submittal and will not assume that an Offeror possesses any capabilities not specified. Proposals shall be neat, indexed (cross-indexed as appropriate) and assembled electronically in an orderly manner.
Elaborate artwork and expensive visual and other presentation aids are neither necessary nor desired. Include only information that is relevant to this source selection.
2.1.4 Organization/Number of Copies/Page Limits.
2.1.4.1 : Volume 1, Cost/Price Proposal Volume 2, Technical Schedule, Volume 3, Past A complete proposal shall consist of three (3) volumes Performance and (Executed RFP documents). Specific guidance regarding the content of each volume will be discussed further below. Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. When Evaluation Notices (ENs) are necessary, they will be issued by electronic means to prospective offerors. Page limitations may be placed on responses to these ENs and such limitations will be provided at the time the EN is issued.
2.1.4.2 Electronic Page Size, Format and Limit.
2.1.4.2.1 An electronic page is defined as each face of an 8 1/2" X 11" electronic sheet of paper containing information. Page limits apply to all electronic files. Pages in excess of the maximum page limits defined below will not be evaluated. Pages marked "This page intentionally left blank"
FA441723R00090004
https://safe.apps.mil/ https://safe.apps.mil/ mailto:christine.young.1@us.af.mil will not be counted. For the purposes of formatting, the type font shall not be less than 12 pitch. Pages shall be numbered sequentially by individual volume.
Volume 1 - Cost/ Price Proposal and Contractor Responsibility: No Page Limit.
Volume 2 - Technical Proposal Schedule: 20 Page Limit
Volume 3 - Past Performance: 20 Page Limit
2.1.4.2.2 All pages of each volume shall be appropriately numbered and identified with the Request for Proposal (RFP) number(FA441723R0009) listed at the top of the page. Each of the volumes shall be prepared as a single electronic file.
2.1.4.3 Cost or Pricing Related Data. All cost and/or pricing data shall ONLY be addressed in the Cost/Price Proposal Volume.
2.1.4.4 Indexing. Electronic files should be titled appropriately so as to easily discern each volume as outlined in paragraph 2.1.4.2.1 above. Each file shall contain a more detailed table of contents to delineate the subparagraphs within that file. Tab indexing shall be used to identify sections. Indexing is not included in the page limitations.
2.1.4.5 Proposal Acceptance Period. The proposal acceptance period is specified in Block 13d of the Standard Form 1442 of the Solicitation. In accordance with Block 17, the number inserted must be equal to or greater than the number of days listed in Block 13d.
3.0 GENERAL: The Technical proposal shall be prepared in accordance with these instructions and shall be evaluated in accordance with the evaluation criteria and evaluation standards in Section M, Evaluation Factors for Award. Technical proposals shall include necessary information to enable the evaluators to form a definitive conclusion concerning the offeror's ability to perform the required construction.
4.0 . (Submit the Standard Form 1442 and all pages originally included in the RFP. Submit VOLUME 1, FACTOR 1 - PRICE/COST PROPOSAL one (1) copy.)
4.1 Complete blocks 14, 15, 16, 17, 19, and 20a-c of the SF1442, Solicitation, Offer, and Award. An authorized official of the firm submitting the offer must sign and date the SF 1442 in block 20a-c. In doing so, the offeror accedes to the contract terms and conditions as written in the RFP, Sections A through K.
4.2 Insert price in Section B for the Contract Line Item. Failure to provide a price for the line item will eliminate you from competition.
4.3 In addition to the line-item pricing in Section B, the contractor shall complete the 50 Division Construction Cost Estimate Worksheet(Attachment L3). Contractor shall fill in construction cost estimate worksheet to include the summary and specific divisions to be utilized for this project. At a minimum, each division should include breakdowns of specific labor and material cost. The use of lump sum or lot pricing should be avoided. The total amount on the 50 Division Worksheet must match total price as submitted in Volume I Cost Proposal with variance authorized for rounding.
Submit the worksheet to the following individuals in paragraph 1.1.5.
4.4 Complete representations and certifications in Section K or in the System for Award Management (SAM).
4.5 Submit the Financial Reference Sheet (Attachment L2) with the top portion only completed.
SECTION L CONTINUED
4.6 Submit an electronic copy of the original Bid Bond with the proposal package.
5.0 . Offerors shall submit one electronic file of the Technical Proposal Schedule.VOLUME 2, FACTOR 2 - TECHNICAL SCHEDULE
5.1 TECHNICAL FACTOR - Project Schedule: Using the provided specifications, the offeror must provide a project schedule and narrative which supports the schedule. The proposal shall describe the Contractor's proposed procedures, processes, and methods for tracking the progress of the project and interface with the NAFI/Contracting Office and contractor team from the start date to the end date.
5.1.1 The project schedule and supporting narrative shall identify the separate work elements of the project, the order of work elements to include;
a. project phasing,
b. number of days for each work element,
c. average inclement weather delays
d. identification of long lead time materials. Long lead items such as major equipment, electrical equipment, pre-engineered piping, etc., must be specifically identified in the technical proposal. If there are no Long Lead Time Materials, the proposal must state that there are no Long Lead Time Materials.
e. Must include the critical path in the progress schedule.
f. At a minimum, the project schedule must include mobilization, submittals, demolition, and major work elements by specification division, final inspection, demobilization, and close-out documents.
g. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period.
5.1.2 The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable software.
The AF Form 3064, Contract Progress Schedule may also be used for submission of this item and is recommended. Offerors should only include the work elements necessary to complete the required work.
5.1.3 The AF Form 3064, Contract Progress Schedule shall reflect a 330-day performance period. It is the offeror's responsibility to identify all necessary work elements. The form must show major measurable line items of the construction project, percentage/value of each line item represented in the total proposal cost and a timeline when each line item is scheduled to be completed.
6.0 VOLUME 3, FACTOR 3 - PAST PERFORMANCE. Submit one (1) electronic copy. Volume 3 is limited to 20 pages.
The Past Performance Questionnaires, Contractor Performance Assessment Reporting System (CPARS) evaluations and the recent and relevant summary that accompanies the offerors proposal should not exceed a maximum of 20 pages.
6.1 Volume 3, Factor 3 - Past Performance - Offerors shall provide adequate past performance information on completed or current contracts (including Federal, State, local government and private) considered most relevant in demonstrating the ability to perform the proposed work as identified within the Specifications. Offerors must provide past performance information to establish Recency and Relevancy on all Federal contracts before State, local government or private contracts. The NAFI's evaluation of past performance information will take into account past performance information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects (see Teaming Agreements and JV's, paragraphs 7.0 and 8.0 below), when such information is relevant to the instant acquisition. Offerors are required to explain what aspects of each contract are deemed relevant to complexity and magnitude as related to the requirements of this solicitation and in accordance with Section M. Failure to provide required relevancy description may impact the confidence rating, (i.e., aspects of previous projects should match work elements identified in the Solicitation/Specifications).
6.1.1 Provide a summary of the previous contracts described above. The summary should explain what aspects of each contract are deemed recent and relevant as related to the requirements of this solicitation and in accordance with Section M. Failure to provide required relevancy description may impact the confidence rating, (i.e., aspects of previous projects should match work elements identified in the Solicitation/Specifications). The summary should not exceed 1 page per reference and include:
a) Name of project (Contract number, if applicable)
b) Name and address of customer or Government agency
c) Name, telephone, and email of customer contact or contracting officer
d) Total dollar value
e) Period of performance/Start and Completion date
f) Brief description of work performed, and why the effort is relevant
SECTION L CONTINUED
g) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions.
6.2 Each proposal shall provide recent and relevant information regarding an offeror's actions under previously awarded contracts:
a) Recency Assessment:
An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must be ongoing or must have been performed during the past five (5) years from the issuance month of this solicitation. Past performance information that fails this condition will not be evaluated. In lieu of a complete project, the Offeror may submit projects that are ongoing as long as, (a) the project is at least 75% complete by this solicitation's issuance date, and (b) the Offeror can validate completion percentage with an approved progress report. For commercial contracts, an equivalent customer validation of progress completion report (signed) may be used in lieu of a NAFI approved progress report.
b) Relevancy Assessment:
An in-depth evaluation of all recent performance information will be conducted to determine how closely the products provided/services performed under those contracts relate to the Cost/Price factor and Technical factor, including their relative order of importance [reference Section M, paragraph 2.0, Evaluation Factors]. Consideration will be given to projects involving the type of construction and work elements described in the attached Specifications. Relevant past performance information must demonstrate construction experience involving the type of construction and work elements described in the attached Specifications, Section 01 10 00, paragraph 1.1.1 Project Description, and costs comparable to the project magnitude as specified in Block 10 for the SF 1442, Request for Proposal. As applicable, a relevancy determination of the offeror's past performance will be made based upon the aforementioned considerations, including joint venture partner(s). In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the offeror or teaming partner whose contract is being reviewed and evaluated. The past performance questionnaires and information obtained from other sources will be used to establish the degree of relevancy of past and present performance. If past performance information is submitted under an Indefinite Delivery/Indefinite Quantity (IDIQ), the service provider must identify the delivery/task order(s) relevant to that effort. Use one Past Performance Information Form for each delivery/task order cited.
6.3 The use of the Attachment L1, Past Performance Questionnaire is only for projects that are not listed in CPARS. The questionnaire is required to be mailed or emailed to all past performance references in the list you provide and instruct them to return the completed questionnaire to the individual
(s) indicated in paragraph 1.1.5 above. Evaluators are only allowed to use the provided Past Performance Questionnaire form found in Section L.
Company developed questionnaires or questionnaires developed by other organizations will not be evaluated. Also, Questionnaires must be completed by Project Owners, Inspectors, Contracting Officers, or their authorized representatives only. Questionnaires will not be accepted from Prime Contractors, Subcontractors, or Manufacturers.
6.4 Inform your references that completed questionnaires are to be submitted electronically by email directly to the addresses in paragraph 1.1.5 above. Questionnaires should be received not later than the closing date and time of the solicitation. Offerors are responsible for ensuring their references transmit the questionnaire to the Contracting Office.
6.5 Lack of any past performance will not automatically disqualify an offeror, but it is a factor that is considered in the Lowest Price Technically Acceptable Source Selection process described in Section M.
6.6 If the offeror claims that there is no past performance, then that status must be identified to the Contracting Officer not later than the date/time proposals are due from all offerors.
7.0 - Teaming Agreements must comply with 13 CFR Part 121 - Small Business Size Regulations and be registered in Signed Teaming Agreement SAM.gov. The teaming members must provide complete information as to relevant and recent past performance information on previous teaming agreements. If this is a first-time joint effort, each party to the teaming agreement must provide information on all relevant contracts as specified in paragraph 6.2 (b) above. The maximum number of references combined shall not exceed 10 per teaming partner.
7.1 The NAFI/Contracting Officer will recognize the integrity and validity of formal contractor Teaming Agreements; provided, the agreements are identified, and company relationships are fully disclosed in an offer. A Teaming Agreement must establish each party's role in the proposal preparation process and will be incorporated into the contract. Failure to clearly define roles and/or provide a Teaming Agreement with a proposal shall make teaming arrangements and related subcontractor past performance ineligible for evaluation and consideration of award. The prime contractor shall remain fully responsible for contract performance, regardless of any Teaming Agreement between the prime contractor and its subcontractors.
7.2 Teaming Agreements must provide the following information as part of their proposal, not later than the date/ time proposals are due:
7.3 Clearly establish roles of each party (who is prime and who is subcontractor, who is responsible for what tasks, contract administration, proposals, work management, etc.)
7.4 Provide for protection of competition-sensitive proprietary information. (Subcontractor past performance cannot be disclosed to the prime offeror without the subcontractor's consent). Provide a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor, only if it is being used as part of the past performance evaluation.
SECTION L CONTINUED
7.5 Identify each member's share of the prospective contract, 50/50, 51/49, etc.
7.6 Exclusivity. Assurance that the team member will not be replaced for the duration of the contract, any exceptions should be identified. Assurance that the team members are not teaming with another firm for the same procurement.
7.7 Statement of acknowledgement that the Prime Contractor is responsible for adhering to contract terms and conditions and daily management. The Prime Contractor is obligated to negotiate in good faith and responsible for conveying mandatory NAFI terms and conditions to subcontractors.
7.8 The prime contractor shall remain fully responsible for contract performance, regardless of any teaming agreement between the prime contractor and its subcontractors.
7.9 At the time of initial contract offer and at time of award, each business must be a small business. In order to submit an offer on a contract, each business concern in a Teaming Agreement must be a small business under the designated NAICS size standard, and must also be small when combined in the aggregate of all teaming affiliates.
8.0 RELATIONSHIP BETWEEN INSTRUCTIONS AND EVALUATION.
Your attention is directed to the functional relationship between Sections L and M of this solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all inclusive. Section M describes evaluation factors for award. Since the evaluation of proposals will cover areas identified in Section M, proposals should address all such areas of evaluation.
9.0 AMENDMENT OF SOLICITATION PRIOR TO CLOSING.
The NAFI/Contracting Officer reserves the right to revise or amend the specifications, drawings, or the solicitation prior to the proposal closing time.
Such reservations or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted on the Contract Opportunities website (https://sam.gov/). If such amendments require material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable offerors to revise their proposals. In such cases, the amendment will include an announcement of the new closing date and time. Offerors MUST acknowledge all amendments in their proposal, either by completing SF 1442 Block 19, providing signed copies of the amendments with their proposal, or by separate letter which includes a reference to the solicitation and amendment numbers.
10.0 QUESTIONS.
All questions regarding this solicitation must be submitted in writing through email transmission. Recommend sending all emails with the option of requesting a delivery receipt and or a read receipt to ensure no complications in sending or receiving are encountered. All questions and subsequent answers will be posted to the Contract Opportunities websitehttps://sam.gov/. It is the responsibility of the contractor to continuously monitor the site for updates. To mitigate the risks associated with the cancellation of this solicitation due to untimely submission of questions, all questions must be submitted electronically to the individual(s) identified in paragraph 1.1.5. above no later than close of business 6 business days (Mon-Fri) after the site visit. Any questions submitted after this period may not be answered.
SECTION L ATTACHMENTS:
Attachment L1 - Past Present Performance Questionnaire, dated 13 Jul 2023 (4 pages)
Attachment L2 - Financial Reference Sheet, (1 page)
Attachment L3 - 50 Division Construction Cost Estimate Worksheet (Excel worksheet w/ 48 tabs) Undated
Attachment L4 - AF Form 3064, Contract Progress Schedule(fillable) and Sample, (2 pages).
| IDCode: |
| Page: 1 |
| Pages: 8 |
| AmendNo: 0004 |
| EffDate: 07 Nov 2023 |
| ReqNo: |
| ProjNo: CP1024656 |
| IssCode: FA4417 |
| AdmCode: |
| IssuedBy: FA4417 1 SOCONS LGC |
350 TULLY ST BLDG 90339, CP 850 884 7602
HURLBURT FIELD, FL 32544-5810
UNITED STATES
Christine Young, Email: christine.young.1@us.af.mil Telephone: 850-884-3298
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA441723R0009 |
| SolDate: 18 Aug 2023 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: Tina Kneip |
| ContDate: |
| CODate: 07 Nov 2023 |
File details come from the government source that posted it. Updated .