Attch_5_Addendum_52212-2.pdf

PDF 46 KB Posted

Attached to
Bullet Trap Maintenance, Repairs, and Lead Removal
Solicitation number
FA441718Q0180
Issued by

About this file

Addendum to FAR 52.212-2

View the file

Other files

File Type Posted
Questions_from_Site_Visit.docx DOCX document
Attch_5_Addendum_to_52212-2_U0001.pdf PDF
Q_A.pdf PDF
Attch_4_Addendum_to_52212-1_U0001.pdf PDF
FA441718Q0180U0001.pdf PDF
Bullet_Trap_Pictures.pdf PDF
Attch_3_Cover_Sheet.pdf PDF
Attch_4_Addendum_to_52212-1.pdf PDF
Bullet_Trap_RFQ.pdf PDF
Attch_1_Bullet_Trap_SOW.pdf PDF
Attch_2_WD_15-4531_Rev-8.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4417-18-Q-0180 Attachment 5 Bullet Trap System Inspection, Repairs & Lead Removal Addendum to FAR 52.212-2 Hurlburt Field, FL

ATTACHMENT 5

ADDENDUM TO FAR 52.212-2 – EVALUATION – COMMERCIAL ITEMS (OCT 2014)

*** THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE

PHYSICALLY REMOVED FROM THE RESULTATNT AWARD. ***

1. Methodology. This acquisition will utilize the Lowest Price Technically Acceptable (LPTA) approach, in which, the Government intends to award to an offeror with a technically acceptable quote at the lowest overall total evaluated price. The LPTA approach does not permit tradeoffs between price/cost and past performance, and will include an evaluation for technical acceptability.

2. Relative Importance. The Government’s evaluation will be based on the following factors and sub-factors:

a. Factor 1 – Price

b. Factor 2 – Technical Acceptability

Price and Technical are equal when evaluated.

3. Offers which are unrealistic in terms of technical acceptability or price may be rejected at any time during the evaluation process. The Government reserves the right to make an award without discussions; however, discussions may be conducted with all, some, or none of the offerors. Offerors may be required to participate in telephone discussions at the 1st Special Operations Contracting Squadron, 350 Tully St. Hurlburt Field, FL 32544.

4. The Government intends to award a Time and Materials Contract as a result of this solicitation. In accordance with FAR 16.601(b), a time and materials contract provides for acquiring services on the basis of:

a. Direct labor hours at a specified fixed hourly rates which include wages, overhead, general and administrative expenses, and profit; and

b. Actual cost for materials.

5. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements in addition to those identified as evaluation factors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions as well as provide complete accompanying rationale. The Contracting Officer has determined there is a high-probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the Contracting Officer’s opinion, adequate price competition exists, no additional cost information will be requested. However, if at any time during this competition the Contracting Officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the Contracting Officer to determine the reasonableness and affordability of the price.

a. Price Evaluation. The first (1st) step will be evaluating prices and ranking all responsive offers by price from lowest to highest. Offeror’s prices submitted in the

Offer Schedule will be evaluated for completeness and fair and reasonableness. All offerors will be evaluated based on price and placed in order from lowest to highest price.

To determine the lowest price, the total proposed price for all five CLINs, (0001, 0002, 0003, 0004 and 0005) will be used.

b. Technical Acceptability Evaluation. Offers shall be evaluated independently of the cost/price quote evaluation to determine the offerors’ compliance with the technical requirements of this solicitation. The Government may make a final determination as to the rating of an offer based on the quote as submitted without requesting any further information. The technical factor will receive an overall rating of either “ACCEPTABLE” or “UNACCEPTABLE” using the rating description in Table 1 below.

The Government’s technical evaluation team shall evaluate the technical quotes on a pass/fail basis, assigning one of the ratings described below for any sub-factor. Any sub factor evaluated as “Unacceptable” will render the entire quote “UNACCEPTABLE”;

therefore, un-awardable. Only those quotes determined to be technically “ACCEPTABLE”, either initially or as a result of discussions, will be considered for award. However, the offeror is cautioned that the Government reserves the right to award this effort based on the initial quote, as received, without discussion. Evaluators shall assign a rating, which fails within one of the following ranges according to the degree to which the offeror meets the minimum requirements described below in Table 1.

Table 1. Technical Ratings

Rating Description

ACCEPTABLE

Quote meets the requirements of the solicitation. The offeror’s documentation clearly demonstrates their capability and understanding of all aspects of performance in accordance with the Statement of Work and the technical sub-factors.

UNACCEPTABLE

Quote does not meet the requirements of the solicitation. The offeror’s documentation does not clearly demonstrate their capability and understanding of all aspects of performance in accordance with the Statement of Work and the technical sub-factors.

The technical factor will be rated ACCEPTABLE when the offeror’s documentation clearly demonstrates their capability and understanding of all aspects of performance in accordance with the Statement of Work and the technical sub-factors listed below:

Technical Sub-Factor 1: The offeror’s submitted documentation clearly demonstrates their capability and previous experience maintaining bullet trap systems.

Previous experience clearly shows the offeror has successfully provided similar services performing inspections and repair services in the quantities required in this requirement.

Additionally, the offeror’s submitted documentation clearly demonstrates their capability for the removal, recycling and transport of lead as required in accordance with the Statement of Work.

Technical Sub-Factor 2: The offeror’s submitted Preventive Maintenance Inspection (PMI) Plan demonstrates an understanding of all work to be performed in accordance with the Statement of Work and completed within the period of performance.

Schedule shall include an estimated annual schedule of all preventive maintenance to be performed.

The technical factor will be rated UNACCEPTABLE when the offeror’s documentation does not clearly demonstrate their capability and understanding of all aspects of performance in accordance with the Statement of Work and the technical sub-factors listed above.

5.1. The Government will rank all offers by price and starting with the lowest priced offer, will review the offer for technical acceptability, and will determine the lowest priced, technically acceptable offer the best value to the Government and will make the award accordingly.

6. Basis for Contract Award. By submission of its quote, the offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications. The Government intends to award a contract to the offeror deemed responsible in accordance with FAR 9.104, as supplemented, whose proposal conforms to the Request for Quote (RFQ) requirements including all stated terms, conditions, representations, certifications, and all other information required by the RFQ and is judged, based on the evaluation criteria, to represent the best value to the Government.

(End of Addendum)