RFI's_FA4417-17-R-0001_FTEV_13-1001-Answered_12_Jan_17.docx

DOCX document 13 KB Posted

Attached to
Upgrade Fire Suppression, Hangar 90225
Solicitation number
FA4417-17-R-0001
Issued by

About this file

Additional RFIs and Responses (Questions and Answers)

View the file

Other files

File Type Posted
Amend_6_Addendum_4.doc DOC document
Amend_6_FA4417-17-R-0001-0006.docx DOCX document
Amend_5_FA4417-17-R-0001-0005.docx DOCX document
Amend_5_ADDENDUM_3.doc DOC document
Additional_Question_and_Answer.docx DOCX document
RFI's_FA4417-17-R-0001_FTEV_13-1001-Answered_3.docx DOCX document
sprinkler_pipe_sizes.pdf PDF
FTEV13-1001Specifications_Rev-1-3-17.pdf PDF
FTEV_13-1001_revised_drawings_1-3-17_.pdf PDF
ADDENDUM__2.doc DOC document
Amendment_4.docx DOCX document
RFI's_FA4417-17-R-0001_FTEV_13-1001-Answered.docx DOCX document
FA4417-17-R-0001-0003_Amendment_3.pdf PDF
Site_Visit_Minutes_and_Sign_In_sheet.pdf PDF
FA4417-17-R-000102.docx DOCX document
02_FTEV13-1001Specifications_1_Dec_16.pdf PDF
Amendment_FA4417-17-R-0001-0001.docx DOCX document
FTEV_13-1001_drawings_1_Dec_16.pdf PDF
Atch_2_-_FTEV_13-1001 _DrawingsFinal.pdf PDF
Atch_4_-_PPQ _17R0001.docx DOCX document
Atch_1_-_FTEV_13-1001 SpecificationsFinal.pdf PDF
Solicitation_FA4417-17-R-0001.docx DOCX document
Atch_5_-_Financial_Worksheet _17R0001.docx DOCX document
Atch_3_-_Wage_Det _17R0001.docx DOCX document
Atch_6 _ _Add_Contract_Reqs _17R0001.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional RFIs and Responses (Questions and Answers)

12 Jan 17

1. It there any way for us to get the most up to date flow data for this hangar. Static Pressure, Residual Pressure , and the gallons per minute?

Response: Water for the fire suppression system is supplied from an atmospheric 500,000 gal ground storage tank. The water is pumped out of the tank to the building by three electric fire pumps all sized to supply 2500 gpm at 100 psi as shown on drawings sheet FP-1.

2. Is there anyone that can tell us what the existing pipe sizing for the hangar is?

Response: See attached drawing. Existing header feeding the fire risers are 8” and the fire risers feeding the overhead piping are 4”. Pipe sizes are based on visual inspection from the hangar floor. Contractor will be required to field verify actual size and layout of existing piping.

3. Could you please provide clarification of the following paragraph of the subject solicitation? 4.1.8.2 At the time of initial contract offer and at time of award, each business must be a small business. In order to submit an offer on a contract, each business concern in a teaming agreement must be a small business under the designated NAICS size standard, and must also be small when combined in the aggregate of all teaming affiliates. We fear It is unlikely that a fire suppression company, which is a small business under NAICS238290/size standard of $15M, with the experience and certifications necessary for this heavy-industrial, highly-specialized fire protection application exists.

Response: Please also note the Huzone requirement at para 1.1.10 of the solicitation. During market research, we conducted a search on the Dynamic Small Business Search Engine for Hubzone under NAICS 238290. The search was for firms in Alabama, Georgia, and Florida with an active Hubzone Certification. The query results returned more than 50 firms meeting the criteria. As a result of this market research we do anticipate obtaining adequate competition for this requirement under NAICS 238290.