23-Section L(V4) - AMD 0003.pdf

PDF 398 KB Posted

Attached to
FY 24 Multiple Award Construction Contract (MACC) Recompete Federal contract opportunity
Solicitation number
FA440723R0002
Issued by
Department of the Air Force Air Mobility Command

About this file

This document provides instructions for proposals submitted in response to solicitation number FA440723R0002, a recompete for the FY 24 Multiple Award Construction Contract from the Department of the Air Force Air Mobility Command. Offerors must submit proposals in three volumes: contract documents, past performance, and price. Volume I requires completion of standard forms and contract clauses as well as financial resources and bonding information. Volume II requires past performance references for similar design-build and bid-build projects. Volume III involves a price proposal using the sample construction cost estimate. Proposals are due by the solicitation closing date. The MACCs will make multiple awards for construction projects over the next five years.

View the file

Other files for this federal contract opportunity

Other files attached to FY 24 Multiple Award Construction Contract (MACC) Recompete, newest first.
File Type Posted
AMD0005 - Amendment FA440723R00020005 SF 30.pdf PDF
AMD0005 - RFI - FY24 MACC Recompete (RESPONSE 5 OCT 23).pdf PDF
AMD0004 - RFI - FY24 MACC Recompete (RESPONSE 3 OCT 23).pdf PDF
AMD0004 - Solicitation Amendment FA440723R0002.pdf PDF
AMD 0003 - Solicitation Amendment FA440723R00020003 SF 30.pdf PDF
23-Section L(V3) AMD0002.pdf PDF
RFI - FY24 MACC Recompete (RESPONSE 5 SEP 23) AMD 0002.xlsx XLSX spreadsheet
Solicitation Amendment FA440723R00020002 SF 30.pdf PDF
Site Visit Log AMD 0001.pdf PDF
Solicitation Amendment FA440723R00020001 SF 30.pdf PDF
Preconstruction Conference Slide show.pptx PPTX presentation
Section L AMD 0001.pdf PDF
11-PPI AMD 0001.pdf PDF
Revised SOW AMD0001 1123710 REPAIR Renovate Red Cross Elevate B21 - REV1.pdf PDF
28 - Maximum Allowable Concentrations.pdf PDF
24-Section M.pdf PDF
18-SOW ATCH 6 - 1123710 REPAIR - Renovate Red Cross - Elevate_ B21 - Seed Mix.pdf PDF
16-SOW ATCH 4 - 1123710 REPAIR - Renovate Red Cross - Elevate_ B21 - Env. Report.pdf PDF
11-PPI.pdf PDF
11a-FY 24 MACC PPQ.pdf PDF
06- WD IL230017-Jun 2023.pdf PDF
04-NAF GP.pdf PDF
Solicitation - FA440723R0002.pdf PDF
15-SOW ATCH 3 - 1123710 REPAIR - Renovate Red Cross - Elevate_ B21 - Design Drawings.pdf PDF
12-SOW 1123710 REPAIR- Renovate Red Cross- Elevate- B21.pdf PDF
8. Scott CIP.pdf PDF
01a-TO Procedures.pdf PDF
3. Macc Gen Rqmts_04 August 2023.pdf PDF
27 - Soil Testing and Disposal Procedure.pdf PDF
26 - Non-Nuclear Configuration Management Database (CMD) Equipment Approval.pdf PDF
23-Section L.pdf PDF
22-Schedule_material_submittals.xlsx XLSX spreadsheet
21-Construction_cost_estimate_breakdown.xlsx XLSX spreadsheet
20-SOW ATCH 8 - 1123710 REPAIR - Renovate Red Cross - Elevate_ B21 - Applicable Comm Standards.pdf PDF
17-SOW ATCH 5 - 1123710 REPAIR - Renovate Red Cross - Elevate_ B21 - Historic Preservation.pdf PDF
13-SOW ATCH 1 - 1123710 REPAIR - Renovate Red Cross - Elevate_ B21 - C.Req..pdf PDF
09-DOD Safe.pdf PDF
07-SAFB Climatic Data.pdf PDF
05- WD IL230007-Apr 2023.pdf PDF
3a. Arch Compatibility Guide.pdf PDF
2. MACC Gen Rqmts-EMCS 2023.pdf PDF
25 - Table 6-1. Fixed Wing Aprons.pdf PDF
19-SOW ATCH 7 - 1123710 REPAIR - Renovate Red Cross - Elevate_ B21 - Utilities.pdf PDF
14-SOW ATCH 2 - 1123710 REPAIR - Renovate Red Cross - Elevate_ B21 - Map.pdf PDF
10-Real ID.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SSP Attachment 3 Section L - Instructions, Conditions, and Notices to Offerors

L-1 GENERAL INSTRUCTIONS

L-1.1 This is an all-electronic solicitation release. Hard copies are not available. The Government will post all information pertaining to the solicitation and award of this requirement to the Electronic Posting System, also known as SAM Contracting opportunities (www.sam.gov). It is the responsibility of each offeror to review the web page for postings of amendments, updates or changes to current information.

L-1.2 Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

L-1.3 Communications: Exchanges of source selection information between Government and offerors will be controlled by the Contracting Officer. Prospective offerors are advised that the pre-proposal conference will be held solely for the purpose of explaining the sample project and terms and conditions of the solicitation. Questions received, in writing, and subsequent answers will be posted to SAM Contracting Opportunities. Offerors are encouraged to submit in writing all questions and requests for clarifications no less than ten (10) days prior to the RFP closing date. The decision whether to respond to questions and requests for clarification made less than ten (10) days prior to the RFP closing shall be at the sole discretion of the contracting officer. Failure of a prospective offeror to submit any questions or attend the conference will be construed to mean that the prospective offeror fully understands all requirements of the solicitation.

L-1.4 Joint Venture Offerors: If the offeror is a joint venture, the offeror shall provide all required solicitation information for all parties including a copy of the joint venture agreement with proposal. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the joint venture. Either party to the joint venture may submit performance information on behalf of the joint venture. Joint venture performance will be evaluated and rated based on either party’s performance. The Small Business Administration (SBA) must receive Joint Venture Agreements prior to proposal due date and approved before award of a resulting contract. If a joint venture is contemplated, then the assigned SBA Business Opportunity Specialist (BOS) must be advised as soon as possible. Ensure the agreement is submitted to the BOS in sufficient time to permit a regulatory compliance review. Any corrections and/or changes requested must allow for review time by the BOS before the proposal due date. No corrections and/or changes are permitted after the time for submission of offers.

L-1.5 Teaming/Partnering Offerors: If the offer is based on a teaming/partnering relationship, the offeror shall provide all required solicitation information for all parties including a copy of the teaming/partnership agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering relationship.

L-1.6 Multiple Companies: If a company has multiple business ventures, only one of their business ventures will be allowed to submit a proposal. The intent of the MACC program is to receive multiple offers with independently prepared proposals that foster competition.

L-1.7 Mentor/Protégé Program: For information regarding the Small Business Administration’s (SBA) Mentor-Protégé Program see: http://www.sba.gov/.

L-1.8 Incurred Expenses: The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

L-1.9 In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals and will destroy all extra copies. No destruction certificate will be provided.

L-1.10 All proposals must be complete and respond directly to the requirements of this solicitation. Any commitments made in the proposal shall become a part of the resultant contract. Failure to comply with these instructions may result in the Government summarily rejecting the offeror’s proposal.

L-1.11 The sample project, price proposal, contract forms, performance references and offeror information shall include the documentation listed below. The price proposal must be based on the offeror's proposal for the sample project as set forth in the task order solicitation documents (see Section J, Attachments 13 through 25). The government will evaluate the proposal in accordance with Section M.

L-2 PROPOSAL PREPARATION INSTRUCTIONS

L-2.1 Volume Organization: Proposals shall be submitted to the Government in three (3) separate volumes as set forth below:

Volume

Description Sanitized Copies

Unsanitized Copies

Reference Paragraph

I Contract Documents 0 1 L-2.2.1 II Past Performance 1 1 L-2.2.2 III Price 0 1 L-2.2.3

L-2.1.1 Page Requirements: Page sizes should be 8.5-inch by 11-inch excluding any drawings, diagrams, and/or supporting illustrations, spreadsheets, etc. Charts, graphs, drawings, diagrams, supporting illustrations, or spreadsheets shall not be limited in size. Margins shall be no smaller than 1-inch and each page within a volume shall be numbered consecutively. All font shall be Times New Roman, black, and the size shall be no smaller than 12 point. Each page containing proprietary information should be so marked. Elaborate formats or color presentations are not desired or required. There are no limitations on the number of pages.

L-2.1.2 Sanitized Copies: Offerors shall provide one sanitized copy of each volume as required by the table above. All references to the prime contractor and subcontractor(s) shall be removed.

L-2.1.2.1 Headers: The only information permitted in the headers of sanitized pages is the solicitation number.

L-2.1.2.2 Footers: The only information permitted in the footers of sanitized pages is the number of pages and “SOURCE SELECTION INFORMATION – SEE FAR 2.101 and 3.104” and “FOR OFFICIAL USE ONLY.”

L-2.1.3 Unsanitized Copies: Offerors shall provide one unsanitized copy of each each volume. There are no restrictions on the content of headers and footers.

L-2.1.4 Cover Pages: A cover sheet containing the solicitation number, volume and title, copy type (sanitized or unsanitized), and offeror name shall be included for each volume.

L-2.2 Volume Content

L-2.2.1 Volume I – Contract Documents

L-2.2.1.1 SF1442 and Solicitation: Complete Blocks 14 – 16 and 19 – 20 (A – C) of SF1442 and all fill-in clauses in solicitation Sections G and I – K.

L-2.2.1.2 SF30, Amendment Form: Complete Blocks 8 and 15 (A – C) for each amendment issued under this solicitation.

L-2.2.1.3 Clauses and Provisions: Offerors shall complete all areas contained in Administrative Data of Section G, FAR Provision 52.219-28 in Section I, FAR Provisions 52.204-8 and 52.209-7 in Section K, and all other clauses and provisions, including exceptions or deviations, within Sections I, K, and L, as applicable to the offeror.

L-2.2.1.4 Proposal Guarantee (Bid Bond): Bonds shall be submitted electronically with proposals; (see attachment “01a TO Procedures” for bonding at the task order level). The sample project does not require a bond as it is a representation of a project, not an actual project.

L-2.2.1.5 Financial Resources: Offerors shall submit a financial capability letter from their financial institution and a letter from the bonding company confirming bonding capability. Offerors shall submit income statement and balance sheet for the previous 5 fiscal years. The letter from the bonding company must indicate the offeror’s bonding capacity. This letter will be used in the Contracting Officer’s determination of responsibility.

L-2.2.1.6 Section 8(a) Status: Provide a copy of the Small Business Administration (SBA) letter for companies certifying they are an 8(a) business.

L-2.2.1.7 Joint Ventures and Teaming / Partnering Agreements: Joint ventures and teaming or partnering agreements must be disclosed and comply with Section K and Section L, paragraphs L-1.4 or L-1.5, as applicable, of the solicitation.

L-2.2.2 Volume II – Past Performance

L-2.2.2.1 Past Performance Information Sheets: Submit four (4) completed copies of Attachment 11, Past Performance Information (PPI) Sheet, for project references completed by the offeror or each joint venture member, as applicable, for contracts or orders performed for Federal agencies and commercial customers within the past five (5) years from the solicitation date (SF1442 Block 3). Submission shall include two (2) design-build project references similar in scope, magnitude, and complexity to the sample project and two (2) bid-build project references similar in magnitude and complexity.

Offerors are responsible for ensuring accuracy of all information, to include current contact information on references provided.

L-2.2.2.2 Past Performance Surveys: For each Past Performance Information Sheet received, the government will contact the references provided and conduct a survey using Solicitation Attachment 11a, Past Performance Questionnaire. This questionnaire is provided to the offeror for informational purposes only and NOT to be completed by the offeror. The government will send out a copy of the questionnaire to the references provided. The government will not evaluate or accept completed questionnaires sent directly from the prime contractor. Offerors may send out the questionnaires to the individuals listed on the reference sheet, but the government will be responsible for contacting references and collecting performance data.

The evaluation of performance information will take into account information regarding predecessor companies, key personnel who have relevant experience, or subcontractors that will perform major or critical aspects of the sample project when such information is relevant to the acquisition.

L-2.2.3 Volume III – Price: Submit a completed copy of Solicitation Attachment 21, Construction Cost Estimate breakdown Sample Project B21.

L-2.2.3.1 Funds are NOT available for the sample project. No award of a task order will be made for the sample project. The sample project is only for evaluation purposes.