04-Installed_Systems_Inventory.pdf
PDF 74 KB Posted
- Attached to
- Repair Airfield Lighting: Phase One, Phase Two Federal contract opportunity
- Solicitation number
- FA440718R0003
About this file
Attachment 04 - Installed Systems Inventory
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A05.pdf | ||
| RFI_1-63_FA440718R0003.pdf | ||
| A04.pdf | ||
| A-5.pdf | ||
| RFI_1-62_FA440718R0003.pdf | ||
| Amendment_03.pdf | ||
| APE_REPORT.PDF | ||
| RFI_4_and_25_Revised_Response.pdf | ||
| Railroad_ROE_Instructions.pdf | ||
| 12-RFP_Checklist_A02.pdf | ||
| Amendment_02.pdf | ||
| PreProposal_Conference_Slides_and_Sign_In.pdf | ||
| RFI_1-25_FA440718R0003.pdf | ||
| FA440718R0003-0001.pdf | ||
| RFI_1-13_FA440718R0003.pdf | ||
| 12-RFP_Checklist.pdf | ||
| 01-SOW_4_Jun_2018.pdf | ||
| 11-Small_Business_Participation_Proposal.pdf | ||
| 10-PPQ.pdf | ||
| 08-_General_Project_Requirements.pdf | ||
| 06-SAFB_Climatic_Data.pdf | ||
| 03-Removed_Systems_Inventory.pdf | ||
| 07-Real_ID_Act.pdf | ||
| 02-Project_Documents.pdf | ||
| FA440718R0003_Scott_AFB_Airfield_Lighting.pdf | ||
| 09-PPI.pdf | ||
| 05-Wage_Determination_IL17_180017.pdf |
Show all 27
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installed Systems Inventory
Facility Number
Level 2 Group Elements
(Systems)
Level 3 Individual Elements
(Components)
Level 4 Sub-Elements
(Sections) Sub-Element Description
ID Number (provided)
Equipment Type
Equipment Make
Serial Number Model Capacity Manufacturer
Warranty Company
Warranty Expiration
Date Location Date
Manufactured Control
Type/Make Year Installed
FA440718R0003
Attachment 4
File details come from the government source that posted it.