Sect J Atch 6 General Decision IL20100017 06-03-2011 IL17.pdf
PDF 184 KB Posted
- Attached to
- Multiple Award Paving Contract (MAPC) Federal contract opportunity
- Solicitation number
- FA4407-11-R-0006
About this file
Section J Attachment 6 General Decision IL20100017 06-03-2011 IL17
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 2.pdf | ||
| Amendment 1 with Attachments.pdf | ||
| Memo for Bidders 20 Jul 11.pdf | ||
| Sect J Atch 4 Financial Data Form.pdf | ||
| Sect J Exhibit 2 POW MIA Parade Field.pdf | ||
| Sect J Exhibit 1 Seed Project Task Order RFP POW MIA SOW 20 June 2011.pdf | ||
| Sect J Atch 5 Invoicing | — | |
| MAPC RFP 15 JUL 11 FA4407-11-R-0006.pdf | ||
| Sect J Exhibit 3 Past Performance Reference Worksheet.pdf | ||
| Sect J Atch 2 General Requirements Jul 2009.pdf | ||
| Sect J Atch 7 NAF General Provisions.pdf | ||
| Sect J Atch 3 Geobase Requirements.pdf | ||
| Sect J Atch 1 SAFB Paving SOW 6 Jun 11.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J, Attachment 6
FA4407-11-R-0006
GENERAL DECISION: IL20100017 06/03/2011 IL17
Date: June 3, 2011
General Decision Number: IL20100017 06/03/2011
Superseded General Decision Number: IL20080017
State: Illinois
Construction Types: Heavy and Highway
Counties: Bond, Calhoun, Clinton, Greene, Jersey, Macoupin, Madison, Monroe, Montgomery, St Clair and Washington Counties in Illinois.
MACOUPIN (upper 1/2) & MONTGOMERY (upper 1/2, INCLUDING
WAGGONER, STANDARD CITY, & NORTH THEREOF) COUNTIES:
HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line
Construction & Drainage Projects) & HIGHWAY CONSTRUCTION
PROJECTS (excluding tunnels, building structures in rest areas projects, and railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction, other marine bridges)
Modification Number Publication Date
0 03/12/2010
1 05/07/2010
2 06/04/2010
3 07/02/2010
4 08/06/2010
5 09/03/2010
6 10/01/2010
7 11/05/2010
8 11/12/2010
9 01/21/2011
10 03/18/2011
11 05/06/2011
12 06/03/2011
CARP0295-001 05/01/1994
GREENE COUNTY (South of Apple Creek)
Rates Fringes
Carpenter, Lather, Soft Floor
Layer............................$ 18.39 6.17
CARP0295-003 05/04/2011
MADISON COUNTY
Carpenter and Piledriver.........$ 33.88 13.05
CARP0295-006 05/04/2011
BOND, CALHOUN, and JERSEY COUNTIES
CARPENTER........................$ 33.88 13.05
CARP0500-001 05/04/2011
CLINTON, MONROE, and WASHINGTON COUNTIES
Carpenter & Piledrivermen........$ 33.88 13.05
CARP0500-003 05/04/2011
ST. CLAIR COUNTY
Carpenter and Piledriver.........$ 33.88 13.05
* CARP0725-004 05/01/2011
MACOUPIN (Southern Half) AND MONTGOMERY (Southern Half) COUNTIES
CARPENTER........................$ 28.95 19.85
PILEDRIVERMAN....................$ 29.95 19.85
* CARP0904-002 05/01/2011
GREENE COUNTY (Except S. of Apple Creek)
CARPENTER........................$ 28.02 20.58
PILEDRIVERMAN....................$ 29.02 20.58
ELEC0193-003 04/01/1998
ELECTRICIAN
BOND (Eastern Half), CLINTON (HUEY, HOFFMAN &
VIC.), and WASHINGTON
(EXCEPT VENEDY TWP)
COUNTIES....................$ 24.96 2.00+24.75%
CALHOUN, GREENE, JERSEY,
MACOUPIN (BRIGHTON TWP),
and MADISON (ALTON & VIC.)
COUNTIES....................$ 24.96 2.00+24.75%
MACOUPIN (ATHENVILLE,
SCOTTVILLE, GIRARD AND
AREA NORTH THEREOF), AND
MONTGOMERY (NORTHWEST PART
INCLUDING BOIS D ARC,
HARVEL, AND PITMAN TWPS)
COUNTIES....................$ 24.96 2.00+24.75%
MONTGOMERY (EAST OF BUTLER
GROVE, GRISHAM, HILLSBORO,
AND RAYMOND TWPS) COUNTIES..$ 24.96 2.00+24.75%
ELEC0193-011 04/05/2010
MACOUPIN (Townships of Scottville, North Palmyra, North Otter, Virden, Girard, Barr, South Palmyra, South Otter, and Nilwood) and MONTGOMERY (Townships of Bois D'Arc, Pitman, and Harvel)
COUNTIES
Line Construction
Groundman - Equipment
Operator (Class I, all crawler type equipment larger than D-4, 15 ton crane or larger)............$ 35.09 14.84
Groundman - Truck Driver
(with winch, may operate diggers, 5th wheel type trucks, crawler-type equipment, D-4 and smaller, backhoe 3/4 yard and under, rubber tire and crawler w/end loader, and may drive bucket truck and live boom type line trucks).$ 26.79 12.45
Groundman - Truck Driver
(without winch).............$ 25.26 12.01
Groundman (Class A).........$ 24.07 11.67
Lineman.....................$ 37.67 15.58
ELEC0309-002 12/07/2009
BOND (Westside), CLINTON, GREENE (ALL WORK PERFORMED ON THE
ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON
THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT North
1/3 & Southwest Corner), MADISON (EXCEPT East ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (East of ROUNDTREE, IRVING & East FORK TWP.), RANDOLPH (PORTION OF RED BUD
TOWNSHIP), ST. CLAIR, and WASHINGTON (OKAWVILLE & VENEDY
TWPS.) COUNTIES
LINE CONSTRUCTION
Groundman Equipment
Operator....................$ 34.00 14.69
Groundman Truck Driver......$ 27.75 11.99
Groundman...................$ 25.38 10.97
Lineman.....................$ 39.09 16.89
ELEC0309-003 08/30/2010
BOND (Western Half), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MONROE, MONTGOMERY, WASHINGTON
(VENEDY TWP.), MADISON (EXCLUDES ALTON & VIC.) and ST. CLAIR
ELECTRICIAN......................$ 36.30 16.70
* ELEC0649-002 01/03/2011
CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND
MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES
GROUNDMAN - EQUIPMENT
OPERATOR....................$ 36.49 14.40
GROUNDMAN - TRUCK DRIVER
W/WINCH.....................$ 27.63 12.11
GROUNDMAN - TRUCK DRIVER
WO/WINCH....................$ 25.56 11.58
GROUNDMAN...................$ 24.94 11.42
LINEMAN; BLASTER; AND
LINEMAN HOLE BORING
MACHINE OPERATOR............$ 42.21 15.87
ELEC0649-008 01/05/2011
CALHOUN, GREEN, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND
MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES
ELECTRICIAN......................$ 35.45 17.59
ELEC0702-006 06/28/2010
BOND (Eastern Half), and WASHINGTON (OKAWVILLE & VENDY TWPS)
Groundman - Class A.........$ 24.71 12.04
Groundman - Equipment
Operator Class II (all other equipment)............$ 30.00 13.56
Heavy - Equipment Operator
Class I (all crawler type equipment D-4 and larger)...$ 33.60 14.59
Lineman.....................$ 42.09 17.03
ENGI0520-005 08/01/2010
OPERATOR: Power Equipment
Group 1.....................$ 30.50 24.55
Group 2.....................$ 29.37 24.55
Group 3.....................$ 24.89 24.55
Group 4.....................$ 24.95 24.55
Group 5.....................$ 24.62 24.55
Group 6.....................$ 31.05 24.55
Group 7.....................$ 31.35 24.55
GROUP 1: CRANES; DRAGLINES; SHOVELS; SKIMMER SCOOPS;
CLAMSHELLS OR DERRICK BOATS; PILEDRIVERS; CRANE-TYPE
BACKHOES; ASPHALT PLANT OPER; CONCRETE PLANT OPERATOR;
DREDGES; ASPHALT SPREADING MACHINES; LOCOMOTIVES; CABLEWAYS
OR TOWER MACHINES; HOISTS; HYDRAULIC BACKHOES; DITCHING
MACHINES OR BACKFILLER; CHERRY PICKERS; OVERHEAD CRANE;
ROLLER; CONCRETE PAVER; CONCRETE BREAKERS & PUMPS; BULK
CEMENT PLANTS; CEMENT PUMPS; DERRICK TYPE DRILLS; BOAT
OPERATORS; MOTOR GRADERS OR PUSHCATS; SCOOPS OR
TOURNAPULLS; BULLDOZERS; ENDLOADERS OR FORKLIFTS; POWER
BLADE OR ELEVATING GRADERS; WINCH CATS; BOOM OR WINCH
TRUCKS OR BOOM TRACTORS, PIPEWRAPPING OR PAINTING MACHINES;
DRILLS (OTHER THAN DERRICK TYPE); MUD JACKS; WELL DRILLING
MACHINES; MIXERS; CONVEYORS (TWO); AIR COMPRESSORS TWO;
WATER PUMPS REGARDLESS OF SIZE; WELDING MACHINES TWO;
SIPHONS OR JETS TWO; WINCH HEADS OR APPARATUS TWO; LIGHT
PLANTS TWO; TRACTORS REGARDLESS OF SIZE STRAIGHT (TRACTOR
ONLY); FIREMEN ON STATIONARY BOILERS; AUTOMATIC ELEVATORS;
FORM GRADING MACHINES; FINISHING MACHINES; POWER SUB GRADER
OR RIBBON MACHINE; LONGITUDINAL FLOATS; DISTRIBUTION
OPERATOR ON TRUCKS; WINCH HEADS OR APPARATUSES (1);
EXCAVATORS; MOBILE TRACK AIR AND HEATER (TWO TO FIVE);
HEAVY EQUIPMENT GREASER AND ALL OTHER OPERATORS NOT LISTED
BELOW.
GROUP 2: AIR COMPRESSOR ONE; WATER PUMP REGARDLESS OF SIZE
ONE; WELDING MACHINE ONE; 1-BAG MIXER ONE; CONVEYOR ONE;
SIPHON OR JET; LIGHT PLANT ONE; HEATER ONE; IMMOBILE TRACK
AIR ONE.
GROUP 3: FIREMEN ON WHIRLIES AND ASPHALT SPREADER OILERS;
HEAVY EQUIPMENT OILERS; TRUCK CRANES; MONIGANS; LARGE (OVER
65 TON RATE CAPACITY); CONCRETE PLANT OILER AND BLACK TOP
PLANT OILER.
GROUP 4: OILERS
GROUP 5: MASTER MECHANIC; OPERATORS ON EQUIPMENT WITH
BOOMS, INCLUDING JIBS, ONE HUNDRED FEET AND OVER; AND LESS
THAN 150 FEET.
GROUP 6: OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS,
150 FEET AND OVER, AND LESS THAN 200 FEET.
GROUP 7: OPERATORS ON EQUIPMENT WITH BOOMS, INCLUDING JIBS,
200 FEET AND OVER; TOWER CRANES AND WHIRLEY CRANES.
IRON0046-006 08/01/2010
GREENE (NORTHERN HALF), MACOUPIN (NORTH OF SUMMERVILLE), AND
MONTGOMERY (NORTH OF LITCHFIELD & HILLSBORO) COUNTIES
IRONWORKER.......................$ 29.64 17.24
IRON0392-003 08/01/2010
BOND, CALHOUN, CLINTON, GREENE (SOUTHERN HALF), JERSEY,
MACOUPIN (SUMMERVILLE & SOUTH THEREOF), MADISON, MONROE,
MONTGOMERY (LITCHFIELD, HILLSBORO, & SOUTH THEREOF), ST. CLAIR,
and WASHINGTON COUNTIES
IRONWORKER.......................$ 30.35 18.63
IRON0396-006 08/04/2010
BRIDGES, LOCKS, and DAMS ON THE MISSISSIPPI RIVER
IRONWORKER.......................$ 31.98 18.20
LABO0044-001 08/01/2010
MADISON COUNTY (Southwest)
LABORER
Group 1.....................$ 24.10 19.20
Group 2.....................$ 24.60 19.20
LABORER CLASSIFICATIONS:
GROUP 1 - All classifications not listed below
GROUP 2 - Asbestos Abatement Worker and Hazardous Waste
Worker; Lead Base Paint Worker; Dynamite Man
LABO0100-001 08/01/2010
ST CLAIR COUNTY (East St. Louis,Alcoa, Brooklyn,Cahokia, Caseyville,Centreville, Dupo, Fairmont City, French Village, Midway, Maplewood, National City)
LABORERS
Group 1.....................$ 27.30 16.00
Group 2.....................$ 27.80 16.00
LABO0179-002 08/01/2002
MADISON COUNTY (Edwardsville, Marine, and Livingston)
GROUP 1....................$ 20.90 9.85
GROUP 2....................$ 21.15 9.85
GROUP 3....................$ 21.40 9.85
GROUP 4....................$ 22.425 9.85
LABOREER CLASSIFICATIONS
GROUP 1 - General Laborers.
GROUP 2 - Work in Septic tanks, cess pools, or dry wells (old or new); All feeders, mixers and nozzle men on gunnite or sandblasting work; When handling creosoted material;
Ranking or luting asphalt; Burning or cutting with torch;
Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking or performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall;
Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
GROUP 3 - Brick Mason and Plasterer Tenders.
GROUP 4 - Dynamite and Powder Men.
LABO0196-001 08/01/2010
MONROE COUNTY
Group 1.....................$ 25.50 17.80
Group 2.....................$ 26.00 17.80
LABO0197-001 08/01/2002
ST. CLAIR COUNTY (Belleville)
Hod Carrier......................$ 24.40 6.85
LABO0218-001 08/01/2010
BOND (Greeneville), CALHOUN (Hardin), GREENE (Roadhouse), JERSEY (Jerseyville), and MADISON (Alton) COUNTIES
Group 1.....................$ 28.74 14.56
Group 2.....................$ 29.24 14.56
LABO0338-002 08/01/2010
MADISON COUNTY (Wood River)
Dynamite Men................$ 27.85 13.40
General Laborer.............$ 26.35 13.40
Group 1.....................$ 28.43 14.87
Group 2.....................$ 28.93 14.87
Hazardous Materials, Lead
Abatement, Asbestos
Abatement, Mold & Mildew
Remediation Licenses........$ 27.35 13.40
Mason Tender................$ 27.35 13.40
Welding, Burning, or
Cutting with Torch..........$ 26.85 13.40
LABO0397-002 08/01/2010
MADISON COUNTY (GRANITE CITY and Vicinity)
Group 1.....................$ 27.30 16.00
Group 2.....................$ 27.80 16.00
LABO0454-002 08/01/2002
ST. CLAIR COUNTY (EAST ST. LOUIS)
Hod Carrier......................$ 26.55 5.00
LABO0459-001 08/01/2010
ST. CLAIR COUNTY (South)
Group 1.....................$ 25.65 17.65
Group 2.....................$ 26.15 17.65
LABO0474-001 08/01/2002
MADISON COUNTY (GLEN CARBON)
GROUP 1....................$ 20.10 10.65
GROUP 2....................$ 20.35 10.65
GROUP 3....................$ 20.60 10.65
GROUP 4....................$ 21.625 10.65
LABORERS CLASSIFICATIONS
sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or
Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
LABO0581-002 08/01/2010
CLINTON COUNTY (Carlyle)
Group 1.....................$ 24.00 19.30
Group 2.....................$ 24.50 19.30
LABO0622-002 08/01/2010
BOND COUNTY (Greenville)
Group 1.....................$ 24.73 18.57
Group 2.....................$ 25.30 18.57
LABO0646-001 08/01/2002
JERSEY COUNTY (Jerseyville)
GROUP 1....................$ 21.00 10.05
GROUP 2....................$ 21.25 10.05
GROUP 3....................$ 21.50 10.05
GROUP 4....................$ 22.00 10.05
LABORER CLASSIFICATIONS
sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or
Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of
LABO0670-001 08/01/2010
ST CLAIR (O'Fallon, Scott Air Force Base, Shiloh, Lebanon &
Vincinity), CLINTON (Trenton & Vicinity), and MADISON (Troy)
Group 1.....................$ 27.35 15.95
Group 2.....................$ 27.85 15.95
LABO0674-001 08/01/2002
MADISON COUNTY (St. Jacob)
GROUP 1....................$ 29.45 1.60
GROUP 2....................$ 29.70 1.60
GROUP 3....................$ 29.95 1.60
GROUP 4....................$ 29.45 1.60
sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or
Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of
LABO0677-001 08/01/2007
BOND COUNTY (Except the Northside)
GROUP 1.....................$ 30.25 7.65
GROUP 2.....................$ 30.75 7.65
LABO0680-001 08/01/2002
MADISON COUNTY (Highland)
GROUP 1....................$ 20.50 10.25
GROUP 2....................$ 20.75 10.25
GROUP 3....................$ 21.00 10.25
GROUP 4....................$ 22.025 10.25
sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or
Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of
LABO0742-001 08/01/2010
ST. CLAIR (Mascoutah) and CLINTON (New Baden) COUNTIES
Group 1.....................$ 25.60 17.70
Group 2.....................$ 26.10 17.70
LABO0835-001 08/01/2002
GREENE COUNTY (Roadhouse)
GROUP 1....................$ 21.00 10.05
GROUP 2....................$ 21.25 10.05
GROUP 3....................$ 21.50 10.05
GROUP 4....................$ 22.00 10.05
LABORER CLASSFICATIONS
sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on Bottom of Sewer Trenches on Final Grading, Laying or
Caulking of performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of sulfa-seal and/or other coal derivatoves
LABO0950-001 08/01/2002
MACOUPIN COUNTY (Carlinville, Gillespie, Mt. Olive, Shipman &
Staunton)
GROUP 1.....................$ 18.40 12.65
GROUP 2.....................$ 18.65 12.65
GROUP 3.....................$ 18.90 12.65
GROUP 4.....................$ 19.005 12.65
GROUP 1: General Laborers.
GROUP 2: Work in septic tanks, cess pools, or dry wells (old sandblasting work; When handling creosoted material; Raking or luting asphalt; Burning or cutting with torch; Working on bottom of sewer trenches on the final grading, laying or caulking of performed sectional sewer pipe; High time (20 feet or over) where exposed to an open fall; Operator of motor buggies; Any work performed in or on all types of sulfa-seal and/or other coal derivatives.
GROUP 3: Brick mason and plasterer tenders.
GROUP 4: Dynamite and powder men.
LABO0968-001 08/01/1997
CALHOUN COUNTY (Hardin)
GROUP 1....................$ 25.80 .60
GROUP 2....................$ 26.05 .60
GROUP 3....................$ 26.30 .60
GROUP 4....................$ 27.325 .60
sandblasting work; When handling creosoted material;
Ranking or luting asphalt; Burning or cutting with torch;
Working on Bottom of Sewer Trenches on Final Grading, Laying or Caulking or performed sectional Sewer Pipe; High time (20 feet or over) where exposed to an open fall;
Operator of motor buggies; Any work performed in or on all types of cased wells; Cooking, mixing and applying of mastic such as sulfa-seal and/or other coal derivatives
LABO1084-001 08/01/2010
BOND (Sorento) and MONTGOMERY COUNTIES
Group 1.....................$ 24.63 18.67
Group 2.....................$ 25.13 18.67
PAIN0058-002 05/01/2010
Painter, Bridge..................$ 30.45 13.47
Epoxy or Toxic-Lead-Based Paint Work-$1.00 Premimum
PLAS0090-001 08/01/2010
BOND, CALHOUN, CLINTON (WESTERN HALF EAST TO BUT NOT INCLUDE
CARYLE), GREENE, JERSEY, MACOUPIN, MADISON, MONROE, MONTGOMERY,
and ST. CLAIR COUNTIES
CEMENT MASON/CONCRETE FINISHER...$ 30.25 18.55
PLAS0090-005 08/01/2010
Clinton County
CEMENT MASON/CONCRETE FINISHER...$ 30.25 18.55
PLAS0143-007 08/01/2010
WASHINGTON COUNTY
CEMENT MASON/CONCRETE FINISHER...$ 32.35 15.60
TEAM0065-011 05/01/2009
TRUCK DRIVER
Group 1.....................$ 28.605 13.50
Group 2.....................$ 29.005 13.50
Group 3.....................$ 29.205 13.50
Group 4.....................$ 29.455 13.50
Group 5.....................$ 30.205 13.50
CLASSIFICATIONS:
GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.
GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;
Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;
winch trucks; and four axle combiation units.
GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.
GROUP 4: Low Boy and Oil Distributors.
GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .