Atch 0003 Decking Power AF3052 Blank.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Repairs at Lake Martin (Decks & Docks) PNQS 23-4097 (Solicitation Amendment 0001 + Q&A)
Solicitation number
FA330024R0033
Issued by

About this file

This document appears to be a Construction Cost Estimate Breakdown template related to a federal contract opportunity. The contract opportunity is for repairs to the dock decking, stairs, and railings, as well as the repair of a lift station and replacement of railroad tie stairs at the Lake Martin Recreational Area (LMRA). The solicitation number is FA330024R0033, and the estimated magnitude of the construction project is between $100,000 to $200,000. The contract is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside under NAICS code 238990, and is being issued by the Department of the Air Force Air Education and Training Command. The cost estimate template includes detailed line items for various construction divisions, materials, labor, overhead, profit, and bonds.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTORDATEADDRESS
400 Cannon Street Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Dock Decking,Power repairs at the Lake Martin Recreation Area (LMRA)$0.00
LOCATION (Work to be performed)PROJECT NUMBER/WORK ORDERWORK LOCATION
Dock Decking repairs at the LMRAPNQS 23-4097LMRA
ITEMUNIT OF MEASUREQUANTITYMATERIAL/EQUIP. COSTSLABOR RATESOTHER
UNITAVERAGEDIRECTLINE
TOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)ea$0.00$0.00
Site SupervisionDays$0.00$0.00
DIVISION 2 (Site Work)$0.00$0.00$0.00
DIVISION 3 (CONCRETE$0.00$0.00$0.00
DIVISION 4 (MASONRY)$0.00$0.00$0.00
DIVISION 5 (METAL)$0.00$0.00$0.00
DIVISION 6 (WOOD AND PLASTICS)$0.00$0.00$0.00
DOCK DECKINGsf$0.00$0.00$0.00
DOCK DECKING REMOVALsf$0.00$0.00$0.00
REMOVAL AND REPLACE RR Tie stairsea$0.00$0.00$0.00
DIVISION 7 (THERM/MOIST. PROT.)$0.00$0.00$0.00
DIVISION 8 (DOORS AND WINDOWS)$0.00$0.00$0.00
DIVISION 9 (FINISHES)$0.00$0.00$0.00
DIVISION 10 (SPECIALTIES)$0.00$0.00$0.00
DIVISION 11 (EQUIPMENT)$0.00$0.00$0.00
DIVISION 12 (FURNISHINGS)$0.00$0.00$0.00
DIVISION 13 (SPECIAL CONSTRUCTION)$0.00$0.00$0.00
DIVISION 14 (CONVEYING SYSTEMS)$0.00$0.00$0.00
DIVISION 15 (MECHANICAL)$0.00$0.00$0.00
DIVISION 16 (ELECT./FIRE/COMM.)lf$0.00$0.00$0.00
$0.00$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor10%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead15%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00
Grand Total$0.00$0.00
I acknowledge the above cost estimate has been estimated to the best of my ability and means.

Signature: ______________________________________ Gov't Coord___________________________________

File details come from the government source that posted it. Updated .