Solicitation Amendment FA309921R00020002 SF 30.pdf

PDF 566 KB Posted

Attached to
Repair Overruns on Center Runway
Solicitation number
FA309921R0002
Issued by

View the file

Other files

File Type Posted
Q A Amendment 4 MFR.pdf PDF
Solicitation Amendment FA309921R00020004 SF 30.pdf PDF
Solicitation Amendment FA309921R00020003 SF 30.pdf PDF
Repair Overruns on Center Runway Q A.pdf PDF
Solicitation Amendment FA309921R00020001 SF 30.pdf PDF
1E - Progress Schedule and Progress Report.xlsx XLSX spreadsheet
8. AF IMT Form 103_Work Clearance Request.pdf PDF
1Ci - EQ Contractor Tech Specs May 2019 final.pdf PDF
5. Financial Institution Reference Sheet.pdf PDF
4. AETC 47 - Recovered Materials Determination.pdf PDF
1Cvi LAFB Asbestos Management and Operation Plan (2019).pdf PDF
Solicitation - FA309921R0002.pdf PDF
1Cviii LAFB SWPPP (FOUO).pdf PDF
1Cii AF Form 3952 Chemical Hazardous Material Request Authorization Form.pdf PDF
1Cix Hazmat Usage Log.pdf PDF
9. AF IMT 3000_Material Approval Submittal.pdf PDF
7. Past Performance Questionnaire.pdf PDF
1B - 100 percent Design Specifications.pdf PDF
1A - 100 percent Design Drawings.pdf PDF
1D - AETC Installation Excellence Guide.pdf PDF
1Cvii TCEQ Multi Sector General Permit (TXR050000).pdf PDF
2. Wage Determination TX20210008, dated 01 Jan 21.pdf PDF
1Ciii Uniform Hazardous Waste Manifest.pdf PDF
3. Notification of Compliance with Contract Insurance Requirements.pdf PDF
6. Schedule of Material Submittals.xls XLS spreadsheet
1Cv TCEQ Construction General Permit (TXR150000).pdf PDF
1Civ AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
1F - DD 1354.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of Amendment 02 is to add the following to Section L of the Solicitation:Block 14 (Description of Amendment/Modification):

L-13. LIMITATIONS ON SUBCONTRACTING (FAR 52.219-14)

A. The prime contractor will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% percent subcontract amount that cannot be exceeded. The prime Contractor shall submit a monthly written report to the CO demonstrating that it has performed the required percentage of costs. Provide and illustrate the calculation for work to be performed by the prime and similarly situated entities as opposed to the subcontractors that are not similarly situated.

B. Definition - "Similarly situated entity" means a first-tier subcontractor, including an independent contractor that has the same small business program status as that which qualified the prime contractor for the award and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. An example of a similarly situated entity is a first-tier subcontractor that is a Service- Disabled Veteran-owned Small Business (SDVOSB) concern for a SDVOSB set-aside or sole source award under the SDVOSB program.

FA309921R00020002

IDCode:
Page: 1
Pages: 2
AmendNo: 0002
EffDate: 23 May 2021
ReqNo:
ProjNo: MXDP 10-1029
IssCode: FA3099
AdmCode:
IssuedBy: FA3099 47 CONS-CC

171 ALABAMA AVE STE 03

ADMINISTRATIVE ONLY NO REQUISITIONS

LAUGHLIN AFB, TX 78843-5102

UNITED STATES

Joshua Centilli, Email: joshua.centilli@us.af.mil Telephone: (830)298-5744

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA309921R0002
SolDate: 14 Jun 2021
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: Kurt C. Armbruster

Email: kurt.armbruster@us.af.mil Telephone: 8302985115

ContDate:
CODate:

File details come from the government source that posted it. Updated .