Q A Amendment 4 MFR.pdf

PDF 415 KB Posted

Attached to
Repair Overruns on Center Runway
Solicitation number
FA309921R0002
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA309921R00020004 SF 30.pdf PDF
Solicitation Amendment FA309921R00020003 SF 30.pdf PDF
Solicitation Amendment FA309921R00020002 SF 30.pdf PDF
Repair Overruns on Center Runway Q A.pdf PDF
Solicitation Amendment FA309921R00020001 SF 30.pdf PDF
1E - Progress Schedule and Progress Report.xlsx XLSX spreadsheet
8. AF IMT Form 103_Work Clearance Request.pdf PDF
1Ci - EQ Contractor Tech Specs May 2019 final.pdf PDF
5. Financial Institution Reference Sheet.pdf PDF
4. AETC 47 - Recovered Materials Determination.pdf PDF
1Cvi LAFB Asbestos Management and Operation Plan (2019).pdf PDF
Solicitation - FA309921R0002.pdf PDF
1Cviii LAFB SWPPP (FOUO).pdf PDF
1Cii AF Form 3952 Chemical Hazardous Material Request Authorization Form.pdf PDF
1Cix Hazmat Usage Log.pdf PDF
9. AF IMT 3000_Material Approval Submittal.pdf PDF
7. Past Performance Questionnaire.pdf PDF
1B - 100 percent Design Specifications.pdf PDF
1A - 100 percent Design Drawings.pdf PDF
1D - AETC Installation Excellence Guide.pdf PDF
1Cvii TCEQ Multi Sector General Permit (TXR050000).pdf PDF
2. Wage Determination TX20210008, dated 01 Jan 21.pdf PDF
1Ciii Uniform Hazardous Waste Manifest.pdf PDF
3. Notification of Compliance with Contract Insurance Requirements.pdf PDF
6. Schedule of Material Submittals.xls XLS spreadsheet
1Cv TCEQ Construction General Permit (TXR150000).pdf PDF
1Civ AF Form 103 Base Civil Engineering Work Clearance Request.pdf PDF
1F - DD 1354.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

47TH FLYING TRAINING WING (AETC)

01 Jul 21

MEMORANDUM FOR RECORD

SUBJECT: FA3099-21-R-0002, Repair Overruns on Center Runway, Amendment 04; Questions and

Answers (Q&As)

Question 1: Plan E-3.10, detail 4, note 5 states to coordinate with the manufacturer of the existing system. In order to price this feature of work, contractor needs to know the make, model, and any other pertinent details for this existing system.

The current existing equipment within this system are:

· SIEMENS - L-850D Style 2 Runway Threshold & Runway End Light

· ADB SAFEGATE – PAR-56 Steady-Burning Approach Light – Part Number:

44D1661/2121 Options: 20 AMP shorting device

· ADB SAFEGATE – FAA L-850E IRTA Runway Threshold/Military Approach –

Part Number: 44A6248/3210, Military Red

· ADB LIGHTS – FAA L-850E IRTA Runway Threshold/Military Approach –Part

Number: 44A6248/2210, Military White

· ADB SAFEGATE – FAA L-850E IRTA Runway Threshold/Military Approach –

Part Number: 44A6248/1210, Green

It is still the contractor’s responsibility to obtain pertinent details from the manufacturer of the existing system.

Question 2: Please confirm that FAA AC150/5370-10H, more specifically, Part 6 - Flexible

Pavements Item P-401, Item P-403 and Item P-404 are applicable to this contract.

Section 32 12 14.13 Hot-Mix Asphalt Airfield Paving is to be referenced for

“Flexible Pavements.”

Question 3: Please confirm that TxDOT standard specification requirements for asphalt pavement are acceptable for this contract.

Section 32 12 14.13 Hot-Mix Asphalt Airfield Paving is to be referenced for

“Flexible Pavements.”

Question 4: Contractor respectfully requests a 7 day extension to the proposal submission deadline to allow for proper pricing of asphalt materials and placement.

The Government issued Amendment 03 to extend the proposal submission deadline by 14 days.

Question 5: Based on requests for material pricing, Asphalt pavement for this contract is not currently available without drastic changes to the currently issued technical specifications.

Contractor respectfully request the option to substitute the proposed asphalt pavement with

Portland Cement Concrete Pavement (PCCP).

Disapproved, even with the high flux of prices due to the current economic hardships, this must be asphalt pavement.

Question 6: Based on the Governments response to Question 2 of Amendment 01 regarding

11"x17" page size for the project schedule, will the government please confirm that 1 - 11x17 page is considered 1 page towards the proposal page limitation or 2 pages?

The Government reconfirms that one 11” x 17” page for the project schedule will be considered one page towards the proposal page limitation. Only the project schedule shall be on an 11” x 17” page.

JOSHUA CENTILLI

Contract Specialist

2021-07-01T08:30:22-0500
CENTILLI.JOSHUA.A.1589815609

File details come from the government source that posted it. Updated .