Submittal Register
| TITLE: | Replace Overruns on Center Runway | SUBMITTAL REGISTER | ||||||||||||||||||
| JOB NAME: | ||||||||||||||||||||
| LOCATION: | ||||||||||||||||||||
| CONTRACT NO: | ||||||||||||||||||||
| CONTRACTOR: | ||||||||||||||||||||
| CONTRACTOR SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | ||||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |||
| Line | Activity # | Trans-mittal # | Specification Section | SD # | Submittal Description | Item Submitted | Paragraph # | Classification: GOVT or A/E Revwr | Submit | Approval Needed By | Material Needed By | Action Code | Date Of Action | Date FWD to APPR / Auth Date RCD From CONTR | Date FWD To Other Revwr | Date RCD From Other Revwr | Action Code | Date Of Action | Mailed To CONTR/ Date RCD From APPR Authority | Remarks |
| 1 | 02 41 00 | 01 | Preconstruction Submittals | Existing Conditions | 1.11 | G | ||||||||||||||
| 2 | 02 41 00 | 07 | Certificates | Demolition Plan | 1.2.1 | G | ||||||||||||||
| 3 | 02 41 00 | 07 | Certificates | Notification | 1.7 | G | ||||||||||||||
| 4 | 02 41 00 | 11 | Closeout Submittals | Receipts | 3.3.4 | |||||||||||||||
| 5 | 03 30 53 | 02 | Shop Drawings | Installation Drawings | 1.5 | G | ||||||||||||||
| 6 | 03 30 53 | 03 | Product Data | Air-Entraining Admixture | 2.2.3.1 | |||||||||||||||
| 7 | 03 30 53 | 03 | Product Data | Water-Reducing or Retarding Admixture | 2.2.3.2 | |||||||||||||||
| 8 | 03 30 53 | 03 | Product Data | Curing Materials | 2.2.10 | |||||||||||||||
| 9 | 03 30 53 | 03 | Product Data | Expansion Joint Filler Strips, Premolded | 2.2.6 | |||||||||||||||
| 10 | 03 30 53 | 03 | Product Data | Batching and Mixing Equipment | 3.1.3.3 | |||||||||||||||
| 11 | 03 30 53 | 03 | Product Data | Conveying and Placing Concrete | 3.2 | |||||||||||||||
| 12 | 03 30 53 | 03 | Product Data | Formwork | 2.2.8 | |||||||||||||||
| 13 | 03 30 53 | 03 | Product Data | Mix Design Data | 2.3 | G | ||||||||||||||
| 14 | 03 30 53 | 03 | Product Data | Ready-Mix Concrete | 2.3 | |||||||||||||||
| 15 | 03 30 53 | 03 | Product Data | Curing Compound | 2.4.2 | |||||||||||||||
| 16 | 03 30 53 | 03 | Product Data | Mechanical Reinforcing Bar Connectors | 2.2.5 | |||||||||||||||
| 17 | 03 30 53 | 06 | Test Reports | Aggregates | 2.2.2 | |||||||||||||||
| 18 | 03 30 53 | 06 | Test Reports | Concrete Mixture Proportions | 2.1.3 | G | ||||||||||||||
| 19 | 03 30 53 | 06 | Test Reports | Compressive Strength Testing | 3.8.3 | G | ||||||||||||||
| 20 | 03 30 53 | 06 | Test Reports | Slump | 3.8.3 | G | ||||||||||||||
| 21 | 03 30 53 | 06 | Test Reports | Air Content | 3.8.3 | |||||||||||||||
| 22 | 03 30 53 | 06 | Test Reports | Water | 2.2.4 | |||||||||||||||
| 23 | 03 30 53 | 07 | Certificates | Cementitious Materials | 2.2.1 | |||||||||||||||
| 24 | 03 30 53 | 07 | Certificates | Pozzolan | 0 | |||||||||||||||
| 25 | 03 30 53 | 07 | Certificates | CPG for recycled materials or appropriate Waiver Form | 0 | |||||||||||||||
| 26 | 03 30 53 | 07 | Certificates | Aggregates | 2.2.2 | |||||||||||||||
| 27 | 03 30 53 | 07 | Certificates | Delivery Tickets | 2.3 | |||||||||||||||
| 28 | 03 30 53 | 08 | Manufacturer’s Instructions | Chemical Floor Hardener | 0 | |||||||||||||||
| 29 | 03 30 53 | 08 | Manufacturer’s Instructions | Curing Compound | 2.4.2 | |||||||||||||||
| 30 | 26 56 20.00 10 | 02 | Shop Drawings | Lighting and Visual Navigation Aids | 2.1 | |||||||||||||||
| 31 | 26 56 20.00 10 | 02 | Shop Drawings | As-Built Drawings | 1.3.5 | |||||||||||||||
| 32 | 26 56 20.00 10 | 03 | Product Data | Materials and Equipment | 2.2 | |||||||||||||||
| 33 | 26 56 20.00 10 | 03 | Product Data | Protection Plan | 1.3.3 | |||||||||||||||
| 34 | 26 56 20.00 10 | 03 | Product Data | Training | 3.20 | |||||||||||||||
| 35 | 26 56 20.00 10 | 03 | Product Data | Special Tools | 3.20 | |||||||||||||||
| 36 | 26 56 20.00 10 | 03 | Product Data | List of Parts | 3.20 | |||||||||||||||
| 37 | 26 56 20.00 10 | 03 | Product Data | Maintenance and Repair | 3.20 | |||||||||||||||
| 38 | 26 56 20.00 10 | 03 | Product Data | Posted Instructions | 3.22 | G | ||||||||||||||
| 39 | 26 56 20.00 10 | 06 | Test Reports | Field Quality Control | 3.19 | |||||||||||||||
| 40 | 26 56 20.00 10 | 06 | Test Reports | Visual Inspection | 3.19.3 | |||||||||||||||
| 41 | 26 56 20.00 10 | 07 | Certificates | Qualifications | 1.3.2 | |||||||||||||||
| 42 | 26 56 20.00 10 | 07 | Certificates | Materials and Equipment | 2.2 | |||||||||||||||
| 43 | 26 56 20.00 10 | 10 | Operation and Maintenance Data | Operation and Maintenance Procedures | 3.20 | |||||||||||||||
| 44 | 31 00 00 | 03 | Product Data | Utilization of Excavated Materials | 3.6 | G | ||||||||||||||
| 45 | 31 00 00 | 06 | Test Reports | Testing | 3.15 | |||||||||||||||
| 46 | 31 00 00 | 07 | Certificates | Testing | 3.15 | |||||||||||||||
| 47 | 32 01 19 | 03 | Product Data | Manufacturer's Recommendations | 0 | G | ||||||||||||||
| 48 | 32 01 19 | 03 | Product Data | Equipment | 3.1 | |||||||||||||||
| 49 | 32 01 19 | 04 | Samples | Materials | 1.4.1 | G | ||||||||||||||
| 50 | 32 01 19 | 06 | Test Reports | Certified copies of the test reports | 0 | G | ||||||||||||||
| 51 | 32 11 23 | 03 | Product Data | Plant, Equipment, and Tools | 0 | |||||||||||||||
| 52 | 32 11 23 | 03 | Product Data | Waybills and Delivery Tickets | 1.1.3 | |||||||||||||||
| 53 | 32 11 23 | 06 | Test Reports | Sampling and Testing | 1.5 | G | ||||||||||||||
| 54 | 32 11 23 | 06 | Test Reports | Field Density Tests | 1.5.2.4 | G | ||||||||||||||
| 55 | 32 12 10 | 03 | Product Data | Waybills and Delivery Tickets | 1.1.3 | |||||||||||||||
| 56 | 32 12 10 | 06 | Test Reports | Sampling and Testing | 3.7 | |||||||||||||||
| 57 | 32 12 15.13 | 02 | Shop Drawings | Placement Plan | 1.4 | G | ||||||||||||||
| 58 | 32 12 15.13 | 03 | Product Data | Mix Design | 2.3 | G | ||||||||||||||
| 59 | 32 12 15.13 | 03 | Product Data | Contractor Quality Control | 3.1 | G | ||||||||||||||
| 60 | 32 12 15.13 | 04 | Samples | Asphalt Cement Binder | 2.2 | |||||||||||||||
| 61 | 32 12 15.13 | 04 | Samples | Aggregates | 2.1 | |||||||||||||||
| 62 | 32 12 15.13 | 06 | Test Reports | Aggregates | 2.1 | G | ||||||||||||||
| 63 | 32 12 15.13 | 06 | Test Reports | QC Monitoring | 3.1.3.10 | |||||||||||||||
| 64 | 32 12 15.13 | 07 | Certificates | Asphalt Cement Binder | 2.2 | G | ||||||||||||||
| 65 | 32 12 15.13 | 07 | Certificates | Testing Laboratory | 3.7 | |||||||||||||||
| 66 | 32 17 24.00 10 | 03 | Product Data | Equipment | 1.3 | G | ||||||||||||||
| 67 | 32 17 24.00 10 | 03 | Product Data | Composition Requirements | 0 | |||||||||||||||
| 68 | 32 17 24.00 10 | 03 | Product Data | Qualifications | 1.5.1 | |||||||||||||||
| 69 | 32 17 24.00 10 | 06 | Test Reports | Sampling and Testing | 2.3 | |||||||||||||||
| 70 | 32 17 24.00 10 | 07 | Certificates | Volatile Organic Compound (VOC) | 0 | |||||||||||||||
| 71 | 32 92 19 | 03 | Product Data | Wood cellulose fiber mulch | 2.4.3 | |||||||||||||||
| 72 | 32 92 19 | 03 | Product Data | Fertilizer | 2.3 | |||||||||||||||
| 73 | 32 92 19 | 06 | Test Reports | Topsoil composition tests | 2.2.3 | |||||||||||||||
| 74 | 32 92 19 | 07 | Certificates | seed | 2.1 | |||||||||||||||
| 75 | 32 92 19 | 08 | Manufacturer’s Instructions | Erosion Control Materials | 2.6 | |||||||||||||||
| 76 | 33 71 02 | 02 | Shop Drawings | Precast underground structures | 1.4.1 | G | ||||||||||||||
| 77 | 33 71 02 | 03 | Product Data | Medium voltage cable | 2.5 | G | ||||||||||||||
| 78 | 33 71 02 | 03 | Product Data | Medium voltage cable joints | 2.7 | G | ||||||||||||||
| 79 | 33 71 02 | 03 | Product Data | Medium voltage cable terminations | 2.6 | G | ||||||||||||||
| 80 | 33 71 02 | 03 | Product Data | Precast concrete structures | 2.12.1.1 | G | ||||||||||||||
| 81 | 33 71 02 | 03 | Product Data | Sealing Material | 2.12.1.4 | |||||||||||||||
| 82 | 33 71 02 | 03 | Product Data | Pulling-In Irons | 3.4.2 | |||||||||||||||
| 83 | 33 71 02 | 03 | Product Data | Manhole frames and covers | 2.12.2 | G | ||||||||||||||
| 84 | 33 71 02 | 03 | Product Data | Handhole frames and covers | 2.12.3 | G | ||||||||||||||
| 85 | 33 71 02 | 03 | Product Data | Frames and Covers for Airfield Facilities | 2.12.4 | G | ||||||||||||||
| 86 | 33 71 02 | 03 | Product Data | Ductile Iron Frames and Covers for Airfield Facilities | 2.12.5 | G | ||||||||||||||
| 87 | 33 71 02 | 03 | Product Data | Cable supports | 2.13 | G | ||||||||||||||
| 88 | 33 71 02 | 06 | Test Reports | Medium voltage cable qualification and production tests | 2.15.2 | G | ||||||||||||||
| 89 | 33 71 02 | 06 | Test Reports | Field Acceptance Checks and Tests | 3.18.1 | G | ||||||||||||||
| 90 | 33 71 02 | 06 | Test Reports | Cable Installation Plan and Procedure | 3.3 | G | ||||||||||||||
| 91 | 33 71 02 | 07 | Certificates | Cable splicer/terminator | 1.4.2 | G | ||||||||||||||
| 92 | 33 71 02 | 07 | Certificates | Cable Installer Qualifications | 1.4.3 | G | ||||||||||||||
| 93 | 01-3 | 01 | Preconstruction Submittals | Progress Schedule | 4 | G | ||||||||||||||
| 94 | 01-3 | 01 | Preconstruction Submittals | Designation Letter of Personell Responsible for Schedule | 4 | G | ||||||||||||||
| 95 | 01-5 | 01 | Preconstruction Submittals | FAA Form 7460 | 5.2 | G | ||||||||||||||
| 96 | 01-5 | 01 | Preconstruction Submittals | FOD Plan | 5.5 | G | ||||||||||||||
| 97 | 01-6 | 01 | Preconstruction Submittals | Contractors Safety Plan | 3 | G | ||||||||||||||
| 98 | 01-6 | 01 | Certificates | Certifcate of Contractor Safety Compliance | 4 | G | ||||||||||||||
| 99 | 01-7 | 01 | Preconstruction Submittals | Contractor Quality Control Plan | 3 | G | ||||||||||||||
| 100 | 01-7 | 01 | Preconstruction Submittals | Quality Contol Manager Qualifications | 4 | G | ||||||||||||||
| 101 | 01-8 | 01 | Preconstruction Submittals | Construction Site Plan | 2 | G | ||||||||||||||
| 102 | 01-8 | 01 | Preconstruction Submittals | Traffic Control Plan | 3 | G | ||||||||||||||
| 103 | 01-8 | 01 | Preconstruction Submittals | Temporary Trailer Information | 9 | G | ||||||||||||||
| 104 | 01-9 | 01 | Preconstruction Submittals | Environmental Protection Plan | 5 | G | ||||||||||||||
| 105 | 01-9 | 01 | Preconstruction Submittals | MSDS Sheets | 12 | G | ||||||||||||||
| 106 | 01-9 | 01 | Preconstruction Submittals | Hazardous Waste Disposal Documentation | 12 | G | ||||||||||||||
| 107 | SOW 2 | Preconstruction Submittals | Stabilized Construction Entrances Plan | 10 | G | |||||||||||||||
| 108 | 01-3 | Construction Submittal | Progress Report | 5 | G | |||||||||||||||
| 109 | SOW 4 | Construction Submittal | Meeting Minutes | 3 | G | |||||||||||||||
| 110 | SOW 2 | Construction Submittal | Daily Logs (AF Form 1477) | 2 | G | |||||||||||||||
| 111 | 01-10 | 11 | Closeout Submittals | As- Built Drawings | 2 | G | ||||||||||||||
| 112 | 01-10 | 11 | Closeout Submittals | Construction Warranty Management Plan | 3 | G | ||||||||||||||
| 113 | 01-10 | 11 | Closeout Submittals | DD Form 1354 Draft | 4 | G | ||||||||||||||
| 114 | 01-10 | 11 | Closeout Submittals | DD Form 1354 Final | 4 | G |