F2M3CC0169AQ01
Title: Repair Main Base Exchange Bathrooms at Bldg 1385
This acquisition is set-aside for Service-Disabled Veteran Owned Small Business
The Magnitude of this project is between $100,000 and $250,000
NAICS: 236220
Davis Bacon strictly enforced. "General Wage Decision TX100003" Dated 07/30/2010 TX3
Offeror must complete Sections B & K of the solicitation package of the SF 1442
Bid Envelopes: Please attach and Option Form 17 to your bid envelopes. This form may be obtained from the General Service Administrations.
Hard copies of the solicitation will not be provided. This document may be found and downloaded at http://www.fbo.gov
Any prospective bidder desiring an explanation or interpretation of the solicitation or associated documents must request in writing no later than ten (10) days prior to the closing date
X
MATTHEW WILSON 210-671-6085
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
02-Aug-2010
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance within _______ 10 calendar days and complete it within ________ 120 calendar days after receiving award, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________ 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________ 2 copies to perform the work required are due at the place specified in Item 8 by ___________ local time ______________ 02 Sep 2010 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______ 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
802D CONTRACTING SQUADRON
1655 SELFRIDGE AVE
LACKLAND AFB TX 78236-5253
FA3047
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
MPLS 09-5005
8. ADDRESS OFFER TO (If Other Than Item 7)
210-671-3478 FAX: TEL: 210-671-1700 TEL: FAX:
FA3047-10-B-0006 51
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued)
(Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA3047-10-B-0006
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Remodel Main Bx
Restrooms
1 Lump Sum
FFP
Remodel Main Bx Restrooms at Bldg 1385 (Lackland AFB) in accordance with the
Statement of Work, industry standards, and product applications.
FOB: Destination
PURCHASE REQUEST NUMBER: F2M3CC0169AQ01
SIGNAL CODE: A
NET AMT
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
CLAUSES INCORPORATED BY FULL TEXT
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the
Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the
Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the
Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the
Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(End of clause)
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 120 dys. After NTP 1 802 CES/CEPMS F2M3CC
1555 GOTT ST
LACKLAND AFB TX 78236-5645
FOB: Destination
F2M3CC
CLAUSES INCORPORATED BY REFERENCE
52.247-34 F.O.B. Destination NOV 1991
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the
Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $484.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
Section G - Contract Administration Data
5352.232-9000 PAYMENTS (AETC) (JUL 1993)
The contractor will be paid monthly on the submission of proper invoices for the services performed during the preceding month. The contractor shall submit invoices in four copies in accordance with part II, section I, clause entitled FAR 52.232-25, Prompt Payment. Invoices shall be submitted on a monthly basis covering the services performed during the preceding month. The contractor’s monthly invoices shall be submitted to:
ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (LACKLAND 0003) (AUG 09)
PAYMENT: Contractors shall submit complete invoices to the payment office (Defense Finance Accounting
Services – DFAS) identified on the face of this document. ALL INVOICES MUST HAVE A VALID PURCHASE
ORDER NUMBER ON THEM.
Submit payment request using one of the following electronic forms:
Wide Area Work Flow-Receipt and Acceptance (WAWF-RA) or the Web Invoicing System (WinS). Information regarding these programs is available on the internet at http://wawf.eb.mil
American National Standards Institute (ANSI) X.12 electronic data interchange (EDI) formats. Information regarding EDI formats is available on the internet at http://www.x12.org. EDI Implementation guides are available on the internet at http://www.dfas.mil/ecedi.
Payment questions can be forwarded to the Payment Office’s Customer Telephone Inquiry Number for DFAS
Limestone at (207) 328-1676 or toll free at 800-337-0371/800-390-5620 or (866) 392-7091 (fax), or on line at http://www.dfas.mil under Money matters: Vendor Pay Inquire System - Select Non-MOCAS System. Note: When inquiring by contract number, exclude the dashes or the contracting office.
The following codes and information will be required to route your invoice(s) and additional e-mail(s) correctly through WAWF:
Contract Number: FA3047-10-B-0006
Delivery Order:
Issue-by DoDDAC: FA3047
Admin DoDAAC: FA3047
Inspected By DoDAAC/BPN:
Ship-to Code/BPN: F2M3CC
Service Acceptor/BPN:
Pay DoDAAC: F67100
Contracting POC’s:
SrA Matt Wilson
Contract Administrator
Phone: 210-671-6085 e-mail: matthew.wilson.38@lackland.af.mil
SSgt. William D. Blakeman
Contracting Officer
Phone: 210-671-1736
E-mail: william.blakeman@lackland.af.mil
Customer:
802D CES/CEPD2
Contractor:
PENDING
FINAL PAYMENT
Final Payment for each delivery order will be made only after receipt of all contractors’ payrolls to include their sub-contractors, SF 1413, Statement and Acknowledgement of each sub-contractor, material submittals, test reports, as-builds, and release of claims
Section H - Special Contract Requirements
LACKLAND REQUIREMENTS
Smoking in AETC Facilities
Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in AETC facilities. AFI 40-102, Tobacco Use in the Air Force, and its AETC Supplement I, outline the procedures used by the
Commander to control smoking in facilities. Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas.
Utilities Conservation
The contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the contractor.
Long distance and Defense Switched Network (DSN) telephone services will not be provided.
Availability of Utilities Services
Notwhithstanding the provisions of the contract clause FAR 52.236-14, Availability and Use of Utilitiy Services, all reasonable required amount sof water, gas, electricity, etc., essential to contract performance shall be made available, at no cost to the contractor, from existing outlets and supplies. All temporary connections, outlets, and distribution lines as may be required will be installed by the contractor at the contractor’s own expense.
Inspection and Acceptance th
Civil Engineer Squadron (CES) is designated as the office responsible for inspecting the work while the
Contracting Officer (CO) is responsible for final acceptance of the work.
Cell Phone Usage
Contractors are advised that LAFB 31-204, Para A1.10.18, prohibits cellular telephone usage when approaching and entering any installation entry gate, driving on the installation or exiting Lackland AFB. The 37 th
Security Forces
Squadron (SFS) is strictly enforcing subject regulation; those found in violation of this regulation are subject to be ticketed.
Lackland Air Force Base Traffic Code
The following Traffic Codes will be enforced and apply to all personnel operating vehicles on Lackland AFB
(LAFB). They are extracted from Lackland AFB Instruction 31-204, 6 September 2002. For a complete listing of all LAFB Traffic Codes and all other aaplicable traffic policies and procedures, please contact the Contracting
Office for a copy of Lackland AFB Instruction 31-204.
Quiet Hours
The quiet hours in the Lackland AFB housing and dormitory areas are between 2200-0600 daily.
Quiet Zones
All motor vehicles, including automobiles, trucks, motorcycles, and off-road vehicles (ORV) are prohibited from being operated in the on base residential areas, in sch a manner as to create a disturbance of the peace. Accelerating a vehicle in such a manner as to cause a loud or unusual noise, or exhibtion of speed, is prohibited. Offensive music or similar offensive audio (cursing, racial, or sexual slurs) noise emmanting from a vehicle at any distance is prohibited. The vehicle operator will be identified and AF Form 3545 will be accomplished and, if necessary, the vehicle operator will be apprehended.
Civilian traffic offenders will be issued the DD Form 1805*, excet when the offender is operating a GOV.
Issuance of DD 1805, United Sated District Court Violation Notice.
Hours of Work
The nornal duty hours of work on Lackland AFB are from 07:30 a.m. to 4:30 p.m., Monday thru Friday excluding holidays. The lunch period for the contractor requiring escorts is from 11:30a.m. to 12:30p.m. Access to work sites may be restricted to these hours and days. For work during other than normal duty hours, the contractor shall submit in writing for the Contracting Officer’s approval , a notice of any period of scheduled work at times other than normal duty hours for work specified above. This notice shall be submitted no less than three (3) workdays prior to each period of work scheduled at times other than normal duty hours of work including Federal Holidays.
Base Fire Prevention Program
The contractor will be required to comply with the Fire Prevention Program regulations of the military installation to be serviced under this contract. The name(s) of the installation(s), the applicable regulation, and the locations where these regulations may be reviewed are listed below:
Name of Installation: Lackland AFB, Texas
Regulation No. and Title: LAFBI 32-2001, Base Fire Prevention Program
Date: 20 Feb 04, AS MAY BE AMENDED
Location: Bldg 484, Lackland AFB San Antonio, Texas
Technical Representatives
802D CES/CEPMD is designated as the technical representative to ensure project progression, workmanship, and inspection of materials for work being performed under this contract. This clause in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms and conditions of the contract.
Recording and Preserving Historical and Archeological Finds
All items having any apparent historical and archeological interest which are discovered in the course of ay construction activities shall be carefully preserved. The contractor shall leave the archeological find undisturbed and shall immediately report the find to the Contracting Officer.
Field Changes
The contractor and the government may agree to perform a no cost field change. Field changes are made when the change appears to be mutally beneficial to all parties and would not require changing the negotiated items. All field changes must be approved by the Contracting Officer prior to execution.
802D CES/CEV HAZMART
The awardee will be required to register prior to performance with the 802D CES/CEV HAZMART. The contractor shall obtain the contractor authorization worksheet from 802D CES HAZMART. (210-671-0333
Bldg 5595) This is to be accomplished immediately after receipt of award or Notice of Award. The contractor shall provide an inventory and MSDS of all HAZMAT to be used or stored on Lackland AFB prior to beginning performance. The contractor shall submit a monthly usage report for all HAZMAT consumed during the preceding month to 802D CES/CEV HAZMART by the fifth work day of the subsequent month.
5352.223-9001 HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS (JUN 1997)
(a) In performing work under this contract on a Government installation, the contractor shall:
(1) Comply with the specific health and safety requirements established by this contract;
(2) Comply with the health and safety rules of the Government installation that concern related activities not directly addressed in this contract;
(3) Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(4) Take such additional immediate precautions as the contracting officer may reasonably require for health and safety purposes.
(c) The contracting officer may, by written order, direct Air Force Occupational Safety and Health Standards
(AFOSH) and/or health/safety standards as may be required in the performance of this contract and any adjustments resulting from such direction will be in accordance with the Changes clause of this contract.
(d) Any violation of these health and safety rules and requirements, unless promptly corrected as directed by the contracting officer, shall be grounds for termination of this contract in accordance with the Default clause of this contract.
5352.242-9000 Contractor access to Air Force installations.
As prescribed in 5342.490-1, insert a clause substantially the same as the following clause in solicitations and contracts:
http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/affars/5342.htm#P17_263
CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (AUGUST 2007)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make frequent visits to or perform work on the Air Force installation(s) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges or contractor-furnished, contractor identification badges while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the contracting officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes. The contracting officer will endorse the request and forward it to the issuing base pass and registration office or security police for processing. When reporting to the registration office, the authorized contractor individual(s) should provide a valid driver’s license, current vehicle registration, valid vehicle insurance certificate, to obtain a vehicle pass.
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) When work under this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101, Volume 1, The Air Force Installation Security Program, and AFI 31-501, Personnel
Security Program Management
(e) Upon completion or termination of the contract or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned to the issuing office.
(f) Failure to comply with these requirements may result in withholding of final payment.
http://www.e-publishing.af.mil/shared/media/epubs/AFI31-101.pdf http://www.e-publishing.af.mil/shared/media/epubs/AFI31-501.pdf
SECURITY REQUIREMENTS FOR UNCLASSIFIED SOLICITATIONS AND CONTRACTS LACKLAND
0010 (MAR ‘10)
1. Base Entry and Vehicle Control Requirements. Contractor shall comply with AFFARS Clause 5352.242-
9000, ―Contractor access to Air Force installations‖ which is hereby incorporated by reference if not otherwise included. Contractor personnel shall comply with all on-base traffic laws. Background investigations will be conducted by the government at no additional cost to the contractor on all contractor personnel prior to issuance of any base pass.
2. Government Computer Access Requirements. If this contract requires contractor personnel to have access to government computers, contractor personnel requiring access to government computers shall successfully complete, a National Agency Check with Inquiries (NACI) request, before obtaining access to the computer. These investigations shall be submitted by the government at no additional cost to the contractor. All contractor employees affected by this requirement must have completed an acceptable submission that complies with all directions for completion of the investigation request through the government security office within 30 calendar days of Contract Award or Notice of Award. To begin this process, all affected contractor employees must complete within 15 calendar days after Contract Award or Notice of Award Standard Form 85P worksheet that can be downloaded from http://www.opm.gov/forms/pdf_fill/SF85P.pdf . The contractor shall notify the Quality
Assurance Evaluator or Government Inspector when the worksheet is complete. The affected employee will then be scheduled by the government for two or more appointments to complete the security package. If at any point after submission of the security worksheet, disqualifying information is discovered or developed, the government reserves the right to deny computer access. In this instance the Contracting Officer will notify the contractor of the denial.
That individual will no longer be allowed to perform duties requiring computer access. After submission of the complete security package through the security office and completion of an adjudicated NACI, contractor employees may obtain their ―Common Access Card‖ (CAC) for the duration of their contract, unless disqualifying information is subsequently discovered. In this instance access will be revoked. The NACI adjudication process normally takes
2 to 5 months after submission of the package. Contractor shall comply with AFFARS Clause 5352.242-9001
Common Access Cards (CACs) for Contractor Personnel which is hereby incorporated by reference if not otherwise included. The contractor shall comply with DODD 5200.08R Physical Security Program, (Chapter 3, Section C.3) requirements.
3. Installation Access. Criminal History Check will be conducted on all prime/subcontractor employees requiring base access. The contractor shall provide the Contracting Officer and the Information Protection Office a current list of employees needing access within 3 working days after receiving award or Notice of Award. The list shall include employee’s name, date of birth, state driver’s license/state ID number and state of issue. Notifications of contractor employee additions and deletions shall be provided with the same information listed above and within 3 working days. Within 10 business days after receipt of the list the Government will notify the Contractor that installation access passes are available for those employees clearing the criminal history check. The duration of any pass issued will not exceed one year or the duration of the contract, whichever is shorter. This process will be repeated at the exercise of any option period.
4. Government Data. The Contractor shall manage all data created for Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW with the records management procedures in Air Force Instruction (AFI) 33 - 322, Records Management Program, Air Force Manual
(AFMAN) 33-363, Management of Records, AFI 33-364, Records Disposition-Procedures and Responsibilities, and http://www.opm.gov/forms/pdf_fill/SF85P.pdf the Air Force Records Disposition Schedule (AF RDS) located at https://www.my.af.mil/gcss-af61a/afrims/afrims/rims.cfm
5. Reporting Requirements. The contractor shall comply with AFI 71-101, Volume 1, Criminal Investigations and Volume-2, Protective Service Matters and AFI 31-401 (Chapter 8). Contractor shall report to Security Forces any information or circumstances which may pose a threat to DOD or contractor personnel, resources, or DOD information.
6. Freedom of Information. The contractor shall not respond to any Freedom of Information Act request or release any information in response to a Freedom of Information request. Any request for information received by the contractor under the Freedom of Information Act will be referred to the Contracting Officer.
7. Physical Security. The contractor shall comply with Force Protection Condition (FPCON) procedures, Random
Antiterrorism Measures (RAMS) and local search/identification requirements.
The contractor shall safeguard all government property, including controlled forms, provided for contractor use. At the close of each work period, government training equipment, ground aerospace vehicles, facilities, support equipment, and other valuable materials shall be secured.
8. Key Control. The contractor shall safeguard all keys issued by the government and ensure they are used only by authorized contractor personnel. The contractor shall not duplicate issued keys and shall report lost keys to the contracting officer immediately. The contractor will be charged for lost keys, re-keying, and lock replacement as applicable.
9. Additional Security Requirements. NACI’s will be IAW Homeland Security Presidential Directive 12 (HSPD-
12) If this contract requires access to classified materials the contractor shall comply with DOD 5200.1-R, AFI 31-
401, AFI 33-202, Computer Security; AFI 33-203, Emission Security (EMSEC) Program, AFI 33-204, Information
Protection Awareness, Training, and Education (SATE) Program; applicable AFKAGs, AFIs, and AFSS for
Communication Security (COMSEC); AFI 10-1101, Operations Security (OPSEC) Instructions and
10. Unescorted Entry to Restricted/Controlled Areas. If this contract requires unescorted entry to controlled or restricted areas, the contractor shall comply with AFI 31-101 Volume 1, The Air Force Installation Security
Program (Chapter 9), DOD 5200.2-R, Appendix 1, and AFI 31-501, Personnel Security Program Management
(Paragraph 3.24). If the performance of this contract requires unescorted entry to a restricted/controlled area, personnel must have a favorably adjudicated NACI investigation. All contractor employees affected by this requirement must have completed an acceptable submission that complies with all directions for completion, of the investigation request through the government security office within 30 calendar days of Contract Award or Notice of
Award. To begin this process, all affected contractor employees must complete within 15 calendar days after
Contract Award or Notice of Award Standard Form 85P worksheet that can be downloaded from http://www.opm.gov/forms/pdf_fill/SF85P.pdf . The contractor shall notify the Quality Assurance Evaluator or
Government Inspector when the worksheet is complete. The affected employee will then be scheduled by the government for two or more appointments to complete the security package. If at any point after submission of the security worksheet, disqualifying information is discovered or developed, the government reserves the right to deny entry to restricted/controlled areas. In this instance the Contracting Officer will notify the contractor of the denial.
That individual will not be allowed to perform duties requiring access to restricted/controlled areas. Upon receipt of a favorable investigation results and authorization by the appropriate commander, the contractor member will receive appropriate entry credentials for access to restricted/controlled areas, unless disqualifying information is subsequently discovered. In this instance access will be revoked. The NACI adjudication process normally takes 2 to 5 months after submission of the package.
11. Credentials Turn-In. Upon completion of performance, termination of the contract or termination of performance on this contract by any individual for any reason, the contractor shall turn in all CAC Cards, Base https://www.my.af.mil/gcss-af61a/afrims/afrims/rims.cfm https://www.my.af.mil/gcss-af61a/afrims/afrims/rims.cfm http://www.opm.gov/forms/pdf_fill/SF85P.pdf
Identification Passes, Restricted Area Badges, and any other documents issued by the government to the Issuing office, Quality Assurance Evaluator, or Project Manager.
12. Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on Lackland AFB.
CONTRACTOR PERSONNEL CONDUCT (LACKLAND 0013) (SEP 09)
The contractor will ensure that its employees conduct themselves in a professional manner while on the installation and refrain from disruptive, offensive, or otherwise improper behavior that undermines order and discipline. The contracting officer may direct the contractor to remove from performance of this contract on this installation any contractor employee engaging in such misconduct.
Section I - Contract Clauses
52.202-1 Definitions JUL 2004
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees APR 1984
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures JUL 1995
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
SEP 2007
52.204-2 Security Requirements AUG 1996
52.204-2 Alt I Security Requirements (Aug 1996) - Alternate I APR 1984
52.204-4 Printed or Copied Double-Sided on Recycled Paper AUG 2000
52.208-8 Helium Requirement Forecast And Required Sources For
Helium
APR 2002
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
SEP 2006
52.214-23 Late Submission, Modifications, And Withdrawals Of
Technical Proposals Under Two-Step Sealed Bidding
NOV 1999
52.214-26 Audit and Records--Sealed Bidding MAR 2009
52.214-27 Price Reduction for Defective Cost or Pricing Data -
Modifications - Sealed Bidding
OCT 1997
52.214-28 Subcontracting Cost Or Pricing Data--Modifications--Sealed
Bidding
OCT 1997
52.214-34 Submission Of Offers In The English Language APR 1991
52.214-35 Submission Of Offers In U.S. Currency APR 1991
52.216-7 Alt I Allowable Cost and Payment (Dec 2002) - Alternate I FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-6 Davis Bacon Act JUL 2005
52.222-7 Withholding of Funds FEB 1988
52.222-8 Payrolls and Basic Records JUN 2010
52.222-9 Apprentices and Trainees JUL 2005
52.222-10 Compliance with Copeland Act Requirements FEB 1988
52.222-11 Subcontracts (Labor Standards) JUL 2005
52.222-12 Contract Termination-Debarment FEB 1988
52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988
52.222-14 Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility FEB 1988
52.222-19 Child Labor -- Cooperation with Authorities and Remedies AUG 2009
52.222-21 Prohibition Of Segregated Facilities FEB 1999
52.222-26 Equal Opportunity MAR 2007
52.222-37 Employment Reports On Special Disabled Veterans, Veterans
Of The Vietnam Era, and Other Eligible Veterans
SEP 2006
52.222-50 Combating Trafficking in Persons FEB 2009
52.223-5 Pollution Prevention and Right-to-Know Information AUG 2003
52.223-6 Drug-Free Workplace MAY 2001
52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995
52.223-15 Energy Efficiency in Energy-Consuming Products DEC 2007
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008
52.227-1 Authorization and Consent DEC 2007
52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.228-2 Additional Bond Security OCT 1997
52.228-5 Insurance - Work On A Government Installation JAN 1997
52.228-10 Vehicular and General Public Liability Insurance APR 1984
52.228-11 Pledges Of Assets SEP 2009
52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995
52.228-15 Performance and Payment Bonds--Construction NOV 2006
52.229-4 Federal, State, And Local Taxes (State and Local
Adjustments)
APR 2003
52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002
52.232-16 Progress Payments JUL 2009
52.232-17 Interest OCT 2008
52.232-23 Assignment Of Claims JAN 1986
52.232-23 Alt I Assignment of Claims (Jan 1986) - Alternate I APR 1984
52.232-24 Prohibition of Assignment of Claims JAN 1986
52.232-25 Prompt Payment OCT 2008
52.232-27 Prompt Payment for Construction Contracts OCT 2008
52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.233-1 Disputes JUL 2002
52.233-3 Protest After Award AUG 1996
52.233-4 Applicable Law for Breach of Contract Claim OCT 2004
52.236-2 Differing Site Conditions APR 1984
52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
52.236-5 Material and Workmanship APR 1984
52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991
52.236-8 Other Contracts APR 1984
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984
52.236-12 Cleaning Up APR 1984
52.236-13 Accident Prevention NOV 1991
52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984
52.236-21 Specifications and Drawings for Construction FEB 1997
52.236-21 Alt I Specifications and Drawings for Construction (Feb 1997) -
Alternate I
APR 1984
52.236-23 Responsibility of the Architect-Engineer Contractor APR 1984
52.236-24 Work Oversight in Architect-Engineer Contracts APR 1984
52.236-25 Requirements for Registration of Designers JUN 2003
52.242-13 Bankruptcy JUL 1995
52.242-14 Suspension of Work APR 1984
52.243-1 Changes--Fixed Price AUG 1987
52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984
52.243-1 Alt III Changes--Fixed Price (Aug 1987) - Alternate III APR 1984
52.243-4 Changes JUN 2007
52.244-4 Subcontractors and Outside Associates and Consultants
(Architect-Engineer Services)
AUG 1998
52.244-5 Competition In Subcontracting DEC 1996
52.246-21 Warranty of Construction MAR 1994
52.246-21 Alt I Warranty of Construction (Mar 1994) - Alternate I APR 1984
52.248-2 Value Engineering--Architect-Engineer MAR 1990
52.248-3 Value Engineering-Construction SEP 2006
52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
MAY 2004
52.249-2 Alt I Termination for Convenience of the Government (Fixed-
Price) (May 2004) - Alternate I
SEP 1996
52.249-7 Termination (Fixed-Price Architect-Engineer) APR 1984
52.249-10 Default (Fixed-Price Construction) APR 1984
52.249-10 Alt I Default (Fixed-Price Construction) (Apr 1984) Alternate I APR 1984
52.252-4 Alterations in Contract APR 1984
52.253-1 Computer Generated Forms JAN 1991
252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies
DEC 2008
252.204-7000 Disclosure Of Information DEC 1991
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A Central Contractor Registration (52.204-7) Alternate A SEP 2007
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Terrorist Country
DEC 2006
252.223-7006 Prohibition On Storage And Disposal Of Toxic And
Hazardous Materials
APR 1993
252.227-7015 Technical Data--Commercial Items NOV 1995
252.227-7022 Government Rights (Unlimited) MAR 1979
252.227-7033 Rights in Shop Drawings APR 1966
252.231-7000 Supplemental Cost Principles DEC 1991
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
MAR 2008
252.232-7010 Levies on Contract Payments DEC 2006
252.236-7000 Modification Proposals-Price Breakdown DEC 1991
252.236-7001 Contract Drawings, and Specifications AUG 2000
252.236-7006 Cost Limitation JAN 1997
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment MAR 1998
252.243-7002 Requests for Equitable Adjustment MAR 1998
252.244-7000 Subcontracts for Commercial Items and Commercial
Components (DoD Contracts)
AUG 2009
252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 1989)
(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
(b) Bidders shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on the form for submitting a bid, (3) by letter or telegram, or (4) by facsimile, if facsimile bids are authorized in the solicitation.
The Government must receive the acknowledgment by the time and at the place specified for receipt of bids.
(End of provision)
52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)
Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments.
The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.
52.214-5 SUBMISSION OF BIDS (MAR 1997)
(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.
(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.
(c) Telegraphic bids will not be considered unless authorized by the solicitation; however, bids may be modified or withdrawn by written or telegraphic notice.
(d) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.
(e) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)
Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)
(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the
Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.
(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is ―late‖ and will not be considered unless it is received before award is made, the
Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--
(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or
(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.
(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the
Government, will be considered at any time it is received and may be accepted.
(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent
Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the
IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.
(End of provision
52.214-12 PREPARATION OF BIDS (APR 1984)
(a) Bidders are expected to examine the drawings, specifications, Schedule, and all instructions. Failure to do so will be at the bidder's risk.
(b) Each bidder shall furnish the information required by the solicitation. The bidder shall sign the bid and print or type its name on the Schedule and each continuation sheet on which it makes an entry. Erasures or other changes must be initialed by the person signing the bid. Bids signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(c) For each item offered, bidders shall (1) show the unit price, including, unless otherwise specified, packaging, packing, and preservation and (2) enter the extended price for the quantity of each item offered in the "Amount" column of the Schedule. In case of discrepancy between a unit price and an extended price, the unit price will be presumed to be correct, subject, however, to correction to the same extent and in the same manner as any other mistake.
(d) Bids for supplies or services other than those specified will not be considered unless authorized by the solicitation.
(e) Bidders must state a definite time for delivery of supplies or for performance of services, unless otherwise specified in the solicitation.
(f) Time, if stated as a number of days, will include Saturdays, Sundays, and holidays.
52.214-14 PLACE OF PERFORMANCE--SEALED BIDDING (APR 1985)
(a) The bidder, in the performance of any contract resulting from this solicitation, [ ] intends, [ ] does not intend
[check applicable box] to use one or more plants or facilities located at a different address from the address of the bidder as indicated in this bid.
(b) If the bidder checks "intends" in paragraph (a) above, it shall insert in the spaces provided below the required information:
Place of Performance Name and Address of Owner
(Street, Address, City, and Operator of the Plant or
County, State, Zip Code) Facility if Other than Bidder
52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)
(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.
(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--
(1) Lump sum bidding;
(2) Alternate prices;
(3) Units of construction; or
(4) Any combination of subparagraphs (1) through (3) above.
(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.
(d) Alternate bids will not be considered unless this solicitation authorizes their submission.
52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)
(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.
(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.
(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.
(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .