This is a Questions & Answers document for solicitation FA303025Q0001 for Grease Trap Maintenance at Goodfellow AFB. The incumbent contractor is Doucet Plumbing, Inc. of San Angelo, TX, with a current contract value of $203,351.00.
The Q&A clarifies several key requirements: service hours are 0730-1600 and cannot be adjusted; inspection requirements were added to the PWS on December 12, 2024; hydro jetting is not required as vessels are emptied completely; repairs are not covered under this contract except for contractor-caused damage; and the scope includes 9 buildings total (4 monthly and 5 quarterly cleanings). The new contract differs from the incumbent's by moving two quarterly cleanings to monthly cleanings. This is a Small Business Set-Aside with no preference for SDVOSB companies. The government will execute modifications if interceptor sizes are found to be different than specified in Appendix A, or if interceptor locations change. Repairs beyond contractor negligence and interceptor relocations would be contracted separately.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA303025Q00010001 SF 30.pdf | ||
| Attachment 1 - PWS (Revised 12 Dec 24).pdf | ||
| Attachment 3 - Evaluation Criteria.pdf | ||
| Attachment 2 - Service Contract Act WD - 2015-5251 - 22 Jul 24.pdf | ||
| Attachment 4 - (CUI) BAL Template.docx | DOCX document | |
| Attachment 1 - PWS.pdf | ||
| Solicitation - FA303025Q0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA303025Q0001 – Grease Trap Maintenance
Q&A
Who is the incumbent for this work?
Doucet Plumbing, Inc
6474 Side View Rd
San Angelo, TX 76901
What is the current obligation number and award value?
FA303020P0001 - $203,351.00
Is there any inspection requirement?
Inspection requirement was added into the PWS 12 Dec 24.
Will there be any need for hydro jetting of the lines?
None has been required currently or historically; current contractor empty vessels completely making hydro jetting unnecessary. However, the PWS was updated to include annual inspection and in depth cleaning, scraping of tanks.
Will repairs be covered under this contract as part of a bilateral agreement? Grease contains H2S which deteriorates the concrete.
No, there has never been issues currently or historically.
- IAW 1.1.4, if there was a significant spill or noticeable or severe discoloring of the concrete where the lids are, a repair or cleaning may be required.
- Vehicles do not and will not be allowed to drive on the concrete tops to evacuate the vessels.
- If any contractor drives on any trap’s concrete housing resulting in damages, the contractor will be responsible for all associated repairs to return trap to full service.
The service hours show Standard duty hours. Can they be serviced outside of the duty hours?
IAW with PWS 3.3, between 0730 – 1600 are the requested service hour. These hours cannot be adjusted.
Is there any preference given to SDVOSB companies?
No. This is a Small-Business Set-Aside.
Is the incumbent’s scope of work exactly the same as required in this contract?
Yes, however this new requirement is moving two quarterly cleanings to monthly cleanings.
Do all 9 buildings require maintenance monthly or only the 4 mentioned? Do the 5 buildings that require quarterly cleanings require monthly maintenance as well?
Appendix A lists 5 buildings requiring quarterly cleaning and 4 buildings with monthly cleaning. The grease trap maintenance frequency will follow the frequency listed in this appendix.
What are the sizes of the grease traps?
The approximate capacity is listed in Appendix A. Furthermore, the sizes were updated in a revised PWS to be more accurate.
Verification of the actual sizes of the interceptors. What is the recourse if the units are found to be larger?
The Government would execute a Modification to the correct size of the interceptors.
Would the Government be able to provide drawings and look at flow directions?
This may be possible, but would take time. The Government cannot guarantee that this would be provided during solicitation.
During the site visit it was discussed about repairs, will those be added to the SOW so that if repairs are needed they can be modified after a quotation?
Aside from repairs due to Contractor negligence, repairs would be contracted separately.
During the site visit it was discussed about moving the one under the counter unit to an exterior interceptor. Will that be a repair / modification to the solicitation that can be added.
Relocating interceptors is not part of this requirement, however there would be a Modification if there is a change in size or location of an interceptor.