This document is a Questions and Answers (Q&A) clarification addressing three key project requirements related to contractor responsibilities and site conditions.
The clarifications confirm that the contractor will not be responsible for furniture removal or relocation. An asbestos report has been completed confirming no asbestos is present in the project area or scope, eliminating any asbestos abatement requirements. Additionally, moisture testing is not required for this project. These responses establish baseline conditions and contractor exclusions that are critical for scope definition and cost estimation in the procurement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix A - Cost Breakdown.xlsx | XLSX spreadsheet | |
| Solicitation Amendment FA302226R00200002 SF 30.pdf | ||
| B926 OSI Flooring_Signed Sign In Sheet.pdf | ||
| B926 OSI Flooring_Asbestos Report.pdf | ||
| Solicitation Amendment FA302226R00200001 SF 30.pdf | ||
| EAL TEMPLATE 2026.pdf | ||
| AF Form 66 OSI Flooring.xlsx | XLSX spreadsheet | |
| Wage Determination.pdf | ||
| Contractors CUI Training Slides.pptx | PPTX presentation | |
| Solicitation - FA302226R0020.pdf | ||
| SOW EEPZ255011 OSI Flooring B926.pdf | ||
| MFR CUI Contractor Training Acknowledgment July 2024.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Please verify that the contractor will not be responsible for any furniture removal or relocation.
The contractor will not responsible for relocating furniture.
2. Please verify that there is no asbestos abatement required.
Asbestos report attached. No asbestos in project area/scope.
3. Is moisture testing required for this project?
No.