8_-_Proposal_Detail_-_BLANK.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- Repair Chiller, Cooling Tower and Controls Federal contract opportunity
- Solicitation number
- FA3020-18-R-0005
About this file
Proposal Detail - Blank
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Overall
| CONSTRUCTION COST ESTIMATE | DATE: | ||||||||||
| CONTRACTOR: | ADDRESS: | ||||||||||
| CONTRACT FOR (word to be performed): Replace Chiller, Cooling Tower, & Controls B1080 - Summary | PROPOSED TOTAL CONTRACT PRICE: | $ - 0 | |||||||||
| PURCHASE REQUEST NUMBER: | PROJECT NUMBER: VNVP 181605 | WORK LOCATION: Sheppard AFB, TX | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL COST | LABOR COSTS | EQUIPMENT COSTS | OTHER DIRECT COSTS | LINE TOTAL | |||
| UNIT PRICE | TOTAL MATERIAL COST | UNIT PRICE | TOTAL LABOR COST | UNIT PRICE | TOTAL EQUIPMENT COST | ||||||
| 1 | General Requirements | % | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2 | Civil / Structural / Architectural | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Mechanical | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Electrical | LS | 1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | Prime Contractor Overhead | % | $ - 0 | ||||||||
| 6 | Prime Contractor Profit | % | $ - 0 | ||||||||
| 7 | Prime Contractor Bond | % | $ - 0 | ||||||||
| 8 | Total | $ - 0 |
VNVP 181605 - B1080, Repair Chillers, etc.
&A &P/&N &D
Structural
| CONSTRUCTION COST ESTIMATE | DATE: | ||||||||||
| CONTRACTOR: | ADDRESS: | ||||||||||
| CONTRACT FOR (word to be performed): Replace Chiller, Cooling Tower, & Controls B1080 - Civil | PROPOSED TOTAL CONTRACT PRICE: | $ - 0 | |||||||||
| PURCHASE REQUEST NUMBER: | PROJECT NUMBER: VNVP 181605 | WORK LOCATION: Sheppard AFB, TX | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL COST | LABOR COST | EQUIPMENT COST | OTHER DIRECT COSTS | LINE TOTAL | |||
| UNIT PRICE | TOTAL MATERIAL COST | UNIT PRICE | TOTAL LABOR COST | UNIT PRICE | TOTAL EQUIPMENT COST | ||||||
| 1 | Civil Mobilization/Demobilization | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 2 | Signs/Barricades/Traffic Control | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 3 | New Sanitary Sewer Line | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 4 | Connect New Sanitary to Main | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 5 | Flowable Fill | CY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 6 | Sawcut Concrete Pavement | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 7 | Sawcut Asphalt Pavement | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 8 | Sawcut Sidewalk | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 9 | Sawcut Curb & Gutter | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 10 | Demolish Concrete Pavement | SY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 11 | Demolish Asphalt Pavement | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 12 | Demolish Sidewalk | SY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 13 | Demolish Curb & Gutter | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 14 | Excavate for New Sewer Line | CY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 15 | New Concrete Pavement | SY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 16 | New Asphalt Pavement | TN | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 17 | New Sidewalk | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 18 | New Curb & Gutter | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 19 | Bedding Material and Backfill | CY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 20 | Sod | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 21 | Sawcut Foundation | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 22 | Demolish Foundation | SY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 23 | New Foundation | SY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 24 | Remove & Dispose Aggregate Surfaced Asphalt BUR Membrane | SQ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 25 | Remove & Dispose Insulation | ISQ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 26 | Remove & Dispose Metal Flashing | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 27 | Remove & Dispose Wood Blocking/Nailer | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 28 | Remove & Dispose Pitch Pan | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 29 | Remove & Dispose Vent Flashing | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 30 | Remove & Dispose Asphalt Walk Mat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 31 | Remove, Clean, & Reinstall Gutter | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 32 | Remove, Clean, & Reinstall Downspout | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 33 | Insulation Board | ISQ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 34 | Tapered Perlite Insulation (1/4 inch/Foot Slope) | SQ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 35 | ½" Recovery Board | SQ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 36 | Tapered Edge Strip | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 37 | Cant Strip | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 38 | Wood Blocking/Nailer | BF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 39 | Underlayment | SQ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 40 | 4-Ply Asphalt Built-Up Roofing Membrane & Aggregate | SQ | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 41 | Edge Envelope | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 42 | 3-Ply Strip-In | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 43 | Base Flashing Sheet | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 44 | Edge/Fascia | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 45 | Plumbing Vent Flashing | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 46 | Asphalt Walk Mat | SF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 47 | Pitch Pan | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 48 | Warranty Sign | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 49 | Remove, Clean, & Reinstall Support Structure | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 50 | New Structural Steel | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 51 | Prep & Paint Support Structure | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 52 | Prep and Paint Exterior Walls | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 53 | Prep and Paint Interior Walls | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 54 | Sub Contractor Overhead | % | $ - 0 | ||||||||
| 55 | Sub Contractor Profit | % | $ - 0 | ||||||||
| 56 | Total | $ - 0 |
VNVP 181605 - B1080, Repair Chillers, etc.
&A &P/&N &D
Mechanical
| CONSTRUCTION COST ESTIMATE | DATE: | ||||||||||
| CONTRACTOR: | ADDRESS: | ||||||||||
| CONTRACT FOR (word to be performed): Replace Chiller, Cooling Tower, & Controls B1080 - Mechanical | PROPOSED TOTAL CONTRACT PRICE: | $ - 0 | |||||||||
| PURCHASE REQUEST NUMBER: | PROJECT NUMBER: VNVP 181605 | WORK LOCATION: Sheppard AFB, TX | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL COST | LABOR COSTS | EQUIPMENT COSTS | OTHER DIRECT COSTS | LINE TOTAL | |||
| UNIT PRICE | TOTAL MATERIAL COST | UNIT PRICE | TOTAL LABOR COST | UNIT PRICE | TOTAL EQUIPMENT COST | ||||||
| 1 | Demolition of Old Mech. Equipment | LOT | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 2 | Air Cooled Chiller | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 3 | Pump 1 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 4 | Pump 2 | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 5 | Chemical Feeding Tank | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 6 | Air Seperater | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 7 | HVAC DDC Control Panel & System | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 8 | Exhaust Fan | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 9 | 3-Way Control Valves | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 10 | Water Piping | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 11 | Sewerage Line Piping | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 12 | Gas Piping | LF | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 13 | EMCS Integration and programming | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 14 | TAB, Commissioning & PVT | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||
| 15 | Sub-Contractor Overhead | % | $ - 0 | ||||||||
| 16 | Sub-Contractor Profit | % | $ - 0 | ||||||||
| 17 | Total | $ - 0 |
VNVP 181605 - B1080, Repair Chillers, etc.
&A &P/&N &D
Electrical
| CONSTRUCTION COST ESTIMATE | DATE: | ||||||||||
| CONTRACTOR: | ADDRESS: | ||||||||||
| CONTRACT FOR (word to be performed): Replace Chiller, Cooling Tower, & Controls B1080 - Electrical | PROPOSED TOTAL CONTRACT PRICE: | $ - 0 | |||||||||
| PURCHASE REQUEST NUMBER: | PROJECT NUMBER: VNVP 181605 | WORK LOCATION: Sheppard AFB, TX | |||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | MATERIAL COST | LABOR COSTS | EQUIPMENT COSTS | OTHER DIRECT COSTS | LINE TOTAL | |||
| UNIT PRICE | TOTAL MATERIAL COST | UNIT PRICE | TOTAL LABOR COST | UNIT PRICE | TOTAL EQUIPMENT COST | ||||||
| 1 | Demolish pump motor connections & wiring | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 2 | Demolish chiller motor connections & wiring | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 3 | Demolish panelboards & wiring | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 4 | Demolish light fixtures & wiring | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 5 | Cleanup | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 6 | Electrical racks | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 7 | 20 A GFCI receptacles, complete install. on racks | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 8 | LED light fixtures | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 9 | Occupancy sensors | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 10 | Switches | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 11 | Wiring, including hangers, etc. | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 12 | MCC structure installation, complete (w/o buckets) | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 13 | Chiller installation, complete (including wires, conduits, etc.) | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 14 | Water pump 1 installation, complete (including wires, conduits, etc.) | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 15 | Water pump 2 installation, complete (including wires, conduits, etc.) | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 16 | Exhaust fan installation, complete (including wires, conduits, etc.) | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 17 | Electrical panelboards, complete install. & circuit reconnections (incl. main & branch CBs) | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 18 | MCC & Panel G feeder conductors in existing conduits | LS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 19 | LV testing, complete | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 20 | Labeling, complete | EA | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 21 | Superintendent | WKS | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 22 | Sub-Contractor Overhead | % | $ - 0 | ||||||||
| 23 | Sub-Contractor Profit | % | $ - 0 | ||||||||
| 24 | Electrical Sub-Total | $ - 0 |
VNVP 181605 - B1080, Repair Chillers, etc.
&A &P/&N &D
File details come from the government source that posted it.