8_-_Proposal_Detail_-_BLANK.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
Repair Chiller, Cooling Tower and Controls Federal contract opportunity
Solicitation number
FA3020-18-R-0005
Issued by
Department of the Air Force Air Education and Training Command

About this file

Proposal Detail - Blank

View the file

Other files for this federal contract opportunity

Other files attached to Repair Chiller, Cooling Tower and Controls, newest first.
File Type Posted
2_-_Switchboard_Elevation_Drawing.pdf PDF
1_-_Electrical_Drawing.pdf PDF
B1080_Q&A_Clarification.pdf PDF
B1080_Q&A's.pdf PDF
Amendment_5.pdf PDF
Amendment_4_-_Extend_Proposal_Due_Date.pdf PDF
B1080_Site_Visit_sign-in_log.pdf PDF
Amendment_3.pdf PDF
Amendment_2.pdf PDF
FA3020-18-R-0005_Amendment_1.pdf PDF
FA3020-18-R-0005_Base_Map_Directions_to_Project.pdf PDF
12_-_Recovered_Materials_List.pdf PDF
4_-_181605_Asbestos_Report_-_FBPO.pdf PDF
2_-_181605_Rpr_Chiller_Cooling_Twr_Ctrls_B1080_[24x36_FBPO]__Rev_1.pdf PDF
9_-_181605_Blank_Schedule_B.docx DOCX document
7_-_Base_Pass_Form_151.pdf PDF
2_-_181605_Rpr_Chiller_Cooling_Twr_Ctrls_B1080_[24x36_FBPO]_Rev_1.dwf DWF file
6_-_HAZMAT_Checklist.xfdl XFDL file
11_-_SF_LLL.pdf PDF
13_-_Past_and_Present_Performance_Questionaire_Sheet.docx DOCX document
3_-_181605_Material_Submittals.pdf PDF
10_-_Background_Check_Requirements.docx DOCX document
1_-_181605_Specifications_-_FBPO_-_Rev_1.pdf PDF
+FA3020-18-R-0005_-_Solicitation.pdf PDF
5_-_Wage_Det_-_Bldg_-_TX180326_-_01-05-2018.pdf PDF
3_-_181605_Material_Submittals.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Overall

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Replace Chiller, Cooling Tower, & Controls B1080 - SummaryPROPOSED TOTAL CONTRACT PRICE:$ - 0
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 181605WORK LOCATION: Sheppard AFB, TX
LINE NO.ITEMUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTSEQUIPMENT COSTSOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1General Requirements%$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
2Civil / Structural / ArchitecturalLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
3MechanicalLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
4ElectricalLS1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
5Prime Contractor Overhead%$ - 0
6Prime Contractor Profit%$ - 0
7Prime Contractor Bond%$ - 0
8Total$ - 0

VNVP 181605 - B1080, Repair Chillers, etc.

&A &P/&N &D

Structural

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Replace Chiller, Cooling Tower, & Controls B1080 - CivilPROPOSED TOTAL CONTRACT PRICE:$ - 0
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 181605WORK LOCATION: Sheppard AFB, TX
LINE NO.ITEMUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTEQUIPMENT COSTOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Civil Mobilization/DemobilizationLOT$ - 0$ - 0$ - 0$ - 0
2Signs/Barricades/Traffic ControlLS$ - 0$ - 0$ - 0$ - 0
3New Sanitary Sewer LineLF$ - 0$ - 0$ - 0$ - 0
4Connect New Sanitary to MainEA$ - 0$ - 0$ - 0$ - 0
5Flowable FillCY$ - 0$ - 0$ - 0$ - 0
6Sawcut Concrete PavementLF$ - 0$ - 0$ - 0$ - 0
7Sawcut Asphalt PavementLF$ - 0$ - 0$ - 0$ - 0
8Sawcut SidewalkLF$ - 0$ - 0$ - 0$ - 0
9Sawcut Curb & GutterEA$ - 0$ - 0$ - 0$ - 0
10Demolish Concrete PavementSY$ - 0$ - 0$ - 0$ - 0
11Demolish Asphalt PavementSF$ - 0$ - 0$ - 0$ - 0
12Demolish SidewalkSY$ - 0$ - 0$ - 0$ - 0
13Demolish Curb & GutterLF$ - 0$ - 0$ - 0$ - 0
14Excavate for New Sewer LineCY$ - 0$ - 0$ - 0$ - 0
15New Concrete PavementSY$ - 0$ - 0$ - 0$ - 0
16New Asphalt PavementTN$ - 0$ - 0$ - 0$ - 0
17New SidewalkSF$ - 0$ - 0$ - 0$ - 0
18New Curb & GutterLF$ - 0$ - 0$ - 0$ - 0
19Bedding Material and BackfillCY$ - 0$ - 0$ - 0$ - 0
20SodSF$ - 0$ - 0$ - 0$ - 0
21Sawcut FoundationLF$ - 0$ - 0$ - 0$ - 0
22Demolish FoundationSY$ - 0$ - 0$ - 0$ - 0
23New FoundationSY$ - 0$ - 0$ - 0$ - 0
24Remove & Dispose Aggregate Surfaced Asphalt BUR MembraneSQ$ - 0$ - 0$ - 0$ - 0
25Remove & Dispose InsulationISQ$ - 0$ - 0$ - 0$ - 0
26Remove & Dispose Metal FlashingLF$ - 0$ - 0$ - 0$ - 0
27Remove & Dispose Wood Blocking/NailerLF$ - 0$ - 0$ - 0$ - 0
28Remove & Dispose Pitch PanEA$ - 0$ - 0$ - 0$ - 0
29Remove & Dispose Vent FlashingEA$ - 0$ - 0$ - 0$ - 0
30Remove & Dispose Asphalt Walk MatSF$ - 0$ - 0$ - 0$ - 0
31Remove, Clean, & Reinstall GutterLF$ - 0$ - 0$ - 0$ - 0
32Remove, Clean, & Reinstall DownspoutLF$ - 0$ - 0$ - 0$ - 0
33Insulation BoardISQ$ - 0$ - 0$ - 0$ - 0
34Tapered Perlite Insulation (1/4 inch/Foot Slope)SQ$ - 0$ - 0$ - 0$ - 0
35½" Recovery BoardSQ$ - 0$ - 0$ - 0$ - 0
36Tapered Edge StripLF$ - 0$ - 0$ - 0$ - 0
37Cant StripLF$ - 0$ - 0$ - 0$ - 0
38Wood Blocking/NailerBF$ - 0$ - 0$ - 0$ - 0
39UnderlaymentSQ$ - 0$ - 0$ - 0$ - 0
404-Ply Asphalt Built-Up Roofing Membrane & AggregateSQ$ - 0$ - 0$ - 0$ - 0
41Edge EnvelopeLF$ - 0$ - 0$ - 0$ - 0
423-Ply Strip-InLF$ - 0$ - 0$ - 0$ - 0
43Base Flashing SheetLF$ - 0$ - 0$ - 0$ - 0
44Edge/FasciaSF$ - 0$ - 0$ - 0$ - 0
45Plumbing Vent FlashingEA$ - 0$ - 0$ - 0$ - 0
46Asphalt Walk MatSF$ - 0$ - 0$ - 0$ - 0
47Pitch PanEA$ - 0$ - 0$ - 0$ - 0
48Warranty SignEA$ - 0$ - 0$ - 0$ - 0
49Remove, Clean, & Reinstall Support StructureLS$ - 0$ - 0$ - 0$ - 0
50New Structural SteelLS$ - 0$ - 0$ - 0$ - 0
51Prep & Paint Support StructureLS$ - 0$ - 0$ - 0$ - 0
52Prep and Paint Exterior WallsLS$ - 0$ - 0$ - 0$ - 0
53Prep and Paint Interior WallsLS$ - 0$ - 0$ - 0$ - 0
54Sub Contractor Overhead%$ - 0
55Sub Contractor Profit%$ - 0
56Total$ - 0

VNVP 181605 - B1080, Repair Chillers, etc.

&A &P/&N &D

Mechanical

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Replace Chiller, Cooling Tower, & Controls B1080 - MechanicalPROPOSED TOTAL CONTRACT PRICE:$ - 0
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 181605WORK LOCATION: Sheppard AFB, TX
LINE NO.ITEMUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTSEQUIPMENT COSTSOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Demolition of Old Mech. EquipmentLOT$ - 0$ - 0$ - 0$ - 0$ - 0
2Air Cooled ChillerEA$ - 0$ - 0$ - 0$ - 0$ - 0
3Pump 1EA$ - 0$ - 0$ - 0$ - 0$ - 0
4Pump 2EA$ - 0$ - 0$ - 0$ - 0$ - 0
5Chemical Feeding TankEA$ - 0$ - 0$ - 0$ - 0$ - 0
6Air SeperaterEA$ - 0$ - 0$ - 0$ - 0$ - 0
7HVAC DDC Control Panel & SystemEA$ - 0$ - 0$ - 0$ - 0$ - 0
8Exhaust FanEA$ - 0$ - 0$ - 0$ - 0$ - 0
93-Way Control ValvesEA$ - 0$ - 0$ - 0$ - 0$ - 0
10Water PipingLF$ - 0$ - 0$ - 0$ - 0$ - 0
11Sewerage Line PipingLF$ - 0$ - 0$ - 0$ - 0$ - 0
12Gas PipingLF$ - 0$ - 0$ - 0$ - 0$ - 0
13EMCS Integration and programmingLS$ - 0$ - 0$ - 0$ - 0$ - 0
14TAB, Commissioning & PVTLS$ - 0$ - 0$ - 0$ - 0$ - 0
15Sub-Contractor Overhead%$ - 0
16Sub-Contractor Profit%$ - 0
17Total$ - 0

VNVP 181605 - B1080, Repair Chillers, etc.

&A &P/&N &D

Electrical

CONSTRUCTION COST ESTIMATEDATE:
CONTRACTOR:ADDRESS:
CONTRACT FOR (word to be performed): Replace Chiller, Cooling Tower, & Controls B1080 - ElectricalPROPOSED TOTAL CONTRACT PRICE:$ - 0
PURCHASE REQUEST NUMBER:PROJECT NUMBER: VNVP 181605WORK LOCATION: Sheppard AFB, TX
LINE NO.ITEMUNIT OF MEASUREQUANTITYMATERIAL COSTLABOR COSTSEQUIPMENT COSTSOTHER DIRECT COSTSLINE TOTAL
UNIT PRICETOTAL MATERIAL COSTUNIT PRICETOTAL LABOR COSTUNIT PRICETOTAL EQUIPMENT COST
1Demolish pump motor connections & wiringEA$ - 0$ - 0$ - 0$ - 0
2Demolish chiller motor connections & wiringEA$ - 0$ - 0$ - 0$ - 0
3Demolish panelboards & wiringEA$ - 0$ - 0$ - 0$ - 0
4Demolish light fixtures & wiringEA$ - 0$ - 0$ - 0$ - 0
5CleanupEA$ - 0$ - 0$ - 0$ - 0
6Electrical racksEA$ - 0$ - 0$ - 0$ - 0
720 A GFCI receptacles, complete install. on racksEA$ - 0$ - 0$ - 0$ - 0
8LED light fixturesEA$ - 0$ - 0$ - 0$ - 0
9Occupancy sensorsEA$ - 0$ - 0$ - 0$ - 0
10SwitchesEA$ - 0$ - 0$ - 0$ - 0
11Wiring, including hangers, etc.LS$ - 0$ - 0$ - 0$ - 0
12MCC structure installation, complete (w/o buckets)EA$ - 0$ - 0$ - 0$ - 0
13Chiller installation, complete (including wires, conduits, etc.)EA$ - 0$ - 0$ - 0$ - 0
14Water pump 1 installation, complete (including wires, conduits, etc.)EA$ - 0$ - 0$ - 0$ - 0
15Water pump 2 installation, complete (including wires, conduits, etc.)EA$ - 0$ - 0$ - 0$ - 0
16Exhaust fan installation, complete (including wires, conduits, etc.)EA$ - 0$ - 0$ - 0$ - 0
17Electrical panelboards, complete install. & circuit reconnections (incl. main & branch CBs)EA$ - 0$ - 0$ - 0$ - 0
18MCC & Panel G feeder conductors in existing conduitsLS$ - 0$ - 0$ - 0$ - 0
19LV testing, completeEA$ - 0$ - 0$ - 0$ - 0
20Labeling, completeEA$ - 0$ - 0$ - 0$ - 0
21SuperintendentWKS$ - 0$ - 0$ - 0$ - 0
22Sub-Contractor Overhead%$ - 0
23Sub-Contractor Profit%$ - 0
24Electrical Sub-Total$ - 0

VNVP 181605 - B1080, Repair Chillers, etc.

&A &P/&N &D

File details come from the government source that posted it.