Text version
* Items to be provided but not on an AF3000. 1 of 7 E - Electronic
PROJECT NO.
VNVP
181605
PR
E
C O
N
ST
R U
C
TI
O N
SU
BM
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C T
D
AT
A
SA
M
PL
ES
C
O
LO
R
SE
LE
C
TI
O N
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
TS
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
ER
'S
IN
ST
R U
C
TI
O N
S
M
AN
U
FA
C
TU
R
FI
EL
D R
EP
O
R
TS
O
PE
R
AT
IO
N
S
AN
D
M
AI
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
APPROVED DISAPPROVED
1 *AF Form 103 - Sec 01 11 00 E As required by Specification
2 Existing Damage - Sec 01 11 00 E As required by Specification
3 Work Plan - Sec 01 11 00 E As required by Specification
4 List of Contact Personnel - Sec 01 14 00 E Prior to start of any work
5 Construction Schedule - Sec 01 32 16.00 20 E Within 10 days of NTP
6 Accident Prevention Plan - Sec 01 35 26 E Within 10 days of NTP
7 Activity Hazard Analysis - Sec 01 35 26 E Prior to start of any work
8 Crane Critical Lift Plan - Sec 01 35 26 E Prior to start of any work
9 Crane Operator Qualifications - Sec 01 35 26 E Prior to start of any work
10 Accident Reports - Sec 01 35 26 E Prior to start of any work
11 Crane Reports - Sec 01 35 26 E Prior to start of any work
12 License Certificates - Sec 01 35 26 E As required by Specification
13 Hazardous Material Documentation - Sec 01 35 26 E As required by
Specification
14 Site Survey - Sec 01 57 19.00 20 E As required by Specification
15 Environmental Protection Plan - Sec 01 57 20.00 10 E As required by
Specification
16 Material Safety Data Sheets - Sec 01 57 20.00 10 E As required by
Specification
17 Waste Management Plan - Sec 01 74 19 E As required by Specification
18 Warranty Binder - Sec 01 78 00 3 As required by Specification
19 Spare Parts Data - Sec 01 78 00 E As required by Specification
20 Operation and Maintenance Manuals - Sec 01 78 00 3 As required by
Specification
21 As-Built Drawings - Sec 01 78 00 3 Prior to start of any work
22 Record Drawings - Sec 01 78 00 3 As required by Specification
23 Final Approved Shop Drawings - Sec 01 78 00 3 As required by Specification
24 Form DD1354 - Sec 01 78 00 E As required by Specification
25 Validation of Training Completion - Sec 01 78 23 E As required by Specification
26 Welding Procedure Qualifications - Sec 05 05 23 E Prior to start of any work
LI
N
E N
U M
BE
R
DATE CONTRACTOR
NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
D
AT
E T
O C
IV
IL
E N
G
IN
EE
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Chiller, Cooling Tower, & Controls, B1080
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
FOLLOW-UP
R
EQ
U
IR
ED
S
U
BM
IT
TA
L D
AT
E
D
AT
E R
EC
EI
VE
C
N
TR
AC
TI
N G
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
* Items to be provided but not on an AF3000. 2 of 7 E - Electronic
VNVP
181605
PR
E
C O
N
ST
R U
C
TI
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C T
D
AT
A
SA
M
PL
ES
C
O
C
TI
O N
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
TS
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S
M
AN
U
FA
C
TU
R
D R
EP
O
R
TS
O
PE
R
AT
IO
N
S
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
APPROVED DISAPPROVED
LI
N
E N
U M
BE
R
DATE CONTRACTOR
NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
D
AT
E T
O C
IV
IL
E N
G
IN
EE
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Chiller, Cooling Tower, & Controls, B1080
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
FOLLOW-UP
R
EQ
U
IR
ED
S
U
BM
IT
TA
L D
AT
E
D
AT
E R
EC
EI
VE
N
TR
AC
TI
N G
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
27 Welder, Welding Operator, and Tacker Qualifications - Sec 05 05 23 E Prior to start of any work
28 Inspector Qualifications - Sec 05 05 23 E Prior to start of any work
29 Pre-qualified Procedures - Sec 05 05 23 E Prior to start of any work
30 Certified Welding Prodcedure Specifications - Sec 05 05 23 E As required by
Specification
31 Modification of Structural Members - Section 06 10 00 E As required by
Specification
32 Tapered roof insulation system - Section 07 22 00 E As required by
Specification
33 Asphalt - Section 07 22 00 E As required by Specification
34 Insulation - Section 07 22 00 E As required by Specification
35 Felts - Section 07 51 13 E As required by Specification
36 Granule Surface Modified Bitumen Cap Sheet - Section 07 51 13 E As required by
Specification
37 Flashing membrane - Section 07 51 13 E As required by Specification
38 Fasteners - Section 07 51 13 E As required by Specification
39 Primer - Section 07 51 13 E As required by Specification
40 Aspahlt Roof Cement - Section 07 51 13 E As required by Specification
41 Walkpad Materials - Section 07 51 13 E As required by Specification
42 Cant Strips - Section 07 51 13 E As required by Specification
43 Pre-Manufactured Accessories - Section 07 51 13 E As required by
Specification
44 Warranty - Section 07 51 13 E As required by Specification
45 Information Card - Section 07 51 13 E As required by Specification
46 Covering on flat, sloped, or curved surfaces - Section 07 60 00 E As required by
Specification
47 Gutters - Section 07 60 00 E As required by Specification
48 Downspouts - Section 07 60 00 E As required by Specification
49 Expansion Joints - Section 07 60 00 E As required by Specification
50 Gravel stops and fascias - Section 07 60 00 E As required by Specification
51 Splash pans - Section 07 60 00 E As required by Specification
52 Flashing for roof drains - Section 07 60 00 E As required by Specification
* Items to be provided but not on an AF3000. 3 of 7 E - Electronic
VNVP
181605
PR
E
C O
N
ST
R U
C
TI
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C T
D
AT
A
SA
M
PL
ES
C
O
C
TI
O N
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
TS
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S
M
AN
U
FA
C
TU
R
D R
EP
O
R
TS
O
PE
R
AT
IO
N
S
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
APPROVED DISAPPROVED
LI
N
E N
U M
BE
R
DATE CONTRACTOR
NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
D
AT
E T
O C
IV
IL
E N
G
IN
EE
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Chiller, Cooling Tower, & Controls, B1080
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
FOLLOW-UP
R
EQ
U
IR
ED
S
U
BM
IT
TA
L D
AT
E
D
AT
E R
EC
EI
VE
N
TR
AC
TI
N G
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
53 Base flashing - Section 07 60 00 E As required by Specification
54 Counter flashing - Section 07 60 00 E As required by Specification
55 Flashing at roof penentrations - Section 07 60 00 E As required by
Specification
56 Reglets - Section 07 60 00 E As required by Specification
57 Scuppers - Section 07 60 00 E As required by Specification
58 Copings - Section 07 60 00 E As required by Specification
59 Drip edge - Section 07 60 00 E As required by Specification
60 Conductor heads - Section 07 60 00 E As required by Specification
61 Open valley flashing - Section 07 60 00 E As required by Specification
62 Eave flashing - Section 07 60 00 E As required by Specification
63 Sealants - Section 07 92 00 E As required by Specification
64 Primers - Section 07 92 00 E As required by Specification
65 Bond breakers - Section 07 92 00 E As required by Specification
66 Backstops - Section 07 92 00 E As required by Specification
67 Product List - Sec 09 90 00 E Prior to start of any work
68 Manufacturer's Data - Sec 10 44 16 E As required by Specification
69 Fire Extinguishers - Sec 10 44 16 E As required by Specification
70 Accessories - Sec 10 44 16 E As required by Specification
71 Cabinets - Sec 10 44 16 E As required by Specification
72 Wall Brackets - Sec 10 44 16 E As required by Specification
73 Fire Extinguishers - Sec 10 44 16 E As required by Specification
74 Accessories - Sec 10 44 16 E As required by Specification
75 Cabinets - Sec 10 44 16 E As required by Specification
76 Wall Brackets - Sec 10 44 16 E As required by Specification
77 Manufacturer's Warranty w/Inspection Tag - Sec 10 44 16 E As required by
Specification
78 Pumps - Section 22 00 00 E As required by
* Items to be provided but not on an AF3000. 4 of 7 E - Electronic
VNVP
181605
PR
E
C O
N
ST
R U
C
TI
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C T
D
AT
A
SA
M
PL
ES
C
O
C
TI
O N
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
TS
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S
M
AN
U
FA
C
TU
R
D R
EP
O
R
TS
O
PE
R
AT
IO
N
S
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
APPROVED DISAPPROVED
LI
N
E N
U M
BE
R
DATE CONTRACTOR
NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
D
AT
E T
O C
IV
IL
E N
G
IN
EE
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Chiller, Cooling Tower, & Controls, B1080
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
FOLLOW-UP
R
EQ
U
IR
ED
S
U
BM
IT
TA
L D
AT
E
D
AT
E R
EC
EI
VE
N
TR
AC
TI
N G
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
79 Backflow Prevention Assemblies - Section 22 00 00 E As required by
Specification
80 Welding - Section 22 00 00 E As required by Specification
81 Tests of Backflow Prevention Assemblies - Section 22 00 00 E As required by
Specification
82 Reduce Volatile Organic Compounds (VOC) for paint/coatings - Section 23 03 00.00 20 E As required by
Specification
83 Connection Diagrams - Section 23 05 15 E As required by Specification
84 Installation Drawings - Section 23 05 15 E As required by Specification
85 Hydrostatic Tests - Section 23 05 15 E As required by Specification
86 Air Tests - Section 23 05 15 E As required by Specification
87 Operation and Maintenance Manuals - Section 23 05 15 E As required by
Specification
88 TAB Firm - Section 23 05 93 E As required by Specification
89 TAB Schematic Drawings and Report Forms - Section 23 05 93 E As required by
Specification
90 TAB Procedures - Section 23 05 93 E As required by Specification
91 Certified Final TAB Report for Proportional Balancing - Section 23 05 93 E As required by
Specification
92 Certified Final TAB Report for Season 1 - Section 23 05 93 E As required by
Specification
93 Certified Final TAB Report for Season 2 - Section 23 05 93 E As required by
Specification
94 Pipe Insulation Systems and Associated Accessories - Section 23 07 00 E As required by
Specification
95 Equipment Insulation Systems and Associated Accessories - Section 23 07 00 E As required by
Specification
96 DDC Contractor Design Drawings - Section 23 09 00 E As required by
Specification
97 Draft As-Built Drawings - Section 23 09 00 E As required by Specification
98 Final As-Built Drawings - Section 23 09 00 E As required by Specification
99 Programming Software - Section 23 09 00 E As required by Specification
100 Controller Application Programs - Section 23 09 00 E As required by
Specification
101 Configuration Software - Section 23 09 00 E As required by Specification
102 Controller Configuration Settings - Section 23 09 00 E As required by
Specification
103 Manufacturer's Product Data - Section 23 09 00 E As required by Specification
104 Start-Up Testing Report - Section 23 09 00 E As required by
* Items to be provided but not on an AF3000. 5 of 7 E - Electronic
VNVP
181605
PR
E
C O
N
ST
R U
C
TI
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C T
D
AT
A
SA
M
PL
ES
C
O
C
TI
O N
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
TS
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S
M
AN
U
FA
C
TU
R
D R
EP
O
R
TS
O
PE
R
AT
IO
N
S
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
APPROVED DISAPPROVED
LI
N
E N
U M
BE
R
DATE CONTRACTOR
NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
D
AT
E T
O C
IV
IL
E N
G
IN
EE
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Chiller, Cooling Tower, & Controls, B1080
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
FOLLOW-UP
R
EQ
U
IR
ED
S
U
BM
IT
TA
L D
AT
E
D
AT
E R
EC
EI
VE
N
TR
AC
TI
N G
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
105 PVT Procedures - Section 23 09 00 E As required by Specification
106 PVT Report - Section 23 09 00 E As required by Specification
107 Operation and Maintenance (O&M) Instructions - Section 23 09 00 E As required by
Specification
108 Training Documentation - Section 23 09 00 E As required by Specification
109 Enclosure Keys - Section 23 09 00 E As required by Specification
110 Password Summary Report - Section 23 09 00 E As required by Specification
111 Closeout Quality Control (QC) Checklist - Section 23 09 00 E As required by
Specification
112 Gas Piping System - Section 23 11 25 E As required by Specification
113 Pipe and Fittings - Section 23 11 25 E As required by Specification
114 Gas Equipment Connectors - Section 23 11 25 E As required by Specification
115 LPG Containers and Accessories - Section 23 11 25 E As required by
Specification
116 Gas Piping System - Section 23 11 25 E As required by Specification
117 Pipe Coating Materials - Section 23 11 25 E As required by Specification
118 Pressure Regulators - Section 23 11 25 E As required by Specification
119 Risers - Section 23 11 25 E As required by Specification
120 Transition Fittings - Section 23 11 25 E As required by Specification
121 Valves - Section 23 11 25 E As required by Specification
122 Warning and Identification Tape - Section 23 11 25 E As required by
Specification
123 Testing Report - Section 23 11 25 E As required by Specification
124 Pressure Tests Report - Section 23 11 25 E As required by Specification
125 Welders Procedures and Qualifications - Section 23 11 25 E As required by
Specification
126 Water Treatment System - Section 23 25 00 E As required by Specification
127 Water Chiller - Section 23 64 10 E As required by Specification
128 Water Chiller - Field Acceptance Test Report - Section 23 64 10 E As required by
Specification
129 Factory Tests - Section 23 64 10 E As required by Specification
130 Water Chiller - Installation Instructions - Section 23 64 10 E As required by
* Items to be provided but not on an AF3000. 6 of 7 E - Electronic
VNVP
181605
PR
E
C O
N
ST
R U
C
TI
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C T
D
AT
A
SA
M
PL
ES
C
O
C
TI
O N
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
TS
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S
M
AN
U
FA
C
TU
R
D R
EP
O
R
TS
O
PE
R
AT
IO
N
S
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
APPROVED DISAPPROVED
LI
N
E N
U M
BE
R
DATE CONTRACTOR
NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
D
AT
E T
O C
IV
IL
E N
G
IN
EE
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Chiller, Cooling Tower, & Controls, B1080
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
FOLLOW-UP
R
EQ
U
IR
ED
S
U
BM
IT
TA
L D
AT
E
D
AT
E R
EC
EI
VE
N
TR
AC
TI
N G
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
131 Operation and Maintenance Manuals - Section 23 64 10 E As required by
Specification
132 Grooved Mechanical Connections For Steel - Section 23 64 26 E As required by
Specification
133 Grooved Mechanical Connections For Copper - Section 23 64 26 E As required by
Specification
134 Calibrated Balancing Valves - Section 23 64 26 E As required by Specification
135 Automatic Flow Control Valves - Section 23 64 26 E As required by
Specification
136 Water Temperature Mixing Valve - Section 23 64 26 E As required by
Specification
137 Water Temperature Regulating Valves - Section 23 64 26 E As required by
Specification
138 Water Pressure Reducing Valve - Section 23 64 26 E As required by
Specification
139 Pressure Relief Valve - Section 23 64 26 E As required by Specification
140 Combination Pressure and Temperature Relief Valves - Section 23 64 26 E As required by
Specification
141 Expansion Joints - Section 23 64 26 E As required by Specification
142 Pumps - Section 23 64 26 E As required by Specification
143 Combination Strainer and Pump Suction Diffuser
- Section 23 64 26 E As required by
Specification
144 Expansion Tanks - Section 23 64 26 E As required by Specification
145 Air Separator Tanks - Section 23 64 26 E As required by Specification
146 Water Treatment Systems - Section 23 64 26 E As required by Specification
147 Pressure Tests Reports - Section 23 64 26 E As required by Specification
148 Welding Procedures and Qualifications - Section 23 64 26 E As required by
Specification
149 Installation Instructions - Sec 26 05 19.00 10 E As required by Specification
150 Tests, Inspections, and Verifications - Sec 26 05
19.00 10 E As required by
Specification
151 Acceptance Tests and Inspections - Sec 26 08 00 E As required by
Specification
152 Qualifications of Organization and Lead Engineering Technician - Sec 26 08 00 E As required by
Specification
153 Acceptance Tests and Inspections Procedure - Sec 26 08 00 E As required by
Specification
154 Switches - Sec 26 20 00 E As required by Specification
155 Enclosed Circuit Breakers - Sec 26 20 00 E As required by Specification
156 Surge Protective Devices - Sec 26 20 00 E As required by
* Items to be provided but not on an AF3000. 7 of 7 E - Electronic
VNVP
181605
PR
E
C O
N
ST
R U
C
TI
IT
TA
LS
SH
O
P D
R
AW
IN
G
S
PR
O
D U
C T
D
AT
A
SA
M
PL
ES
C
O
C
TI
O N
D
ES
IG
N
D
AT
A
TE
ST
R
EP
O R
TS
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
R U
C
TI
O N
S
M
AN
U
FA
C
TU
R
D R
EP
O
R
TS
O
PE
R
AT
IO
N
S
TE
N
AN
C
E D
AT
A
C
LO
SE
O
U T
SU
BM
IT
TA
LS
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-0
SD
-1
SD
-1
APPROVED DISAPPROVED
LI
N
E N
U M
BE
R
DATE CONTRACTOR
NOTIFIED
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
SCHEDULE OF MATERIAL SUBMITTALS
D
AT
E T
O C
IV
IL
E N
G
IN
EE
R
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SOLICITATION/CONTRACT NO.PROJECT TITLE
Repair Chiller, Cooling Tower, & Controls, B1080
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
FOLLOW-UP
R
EQ
U
IR
ED
S
U
BM
IT
TA
L D
AT
E
D
AT
E R
EC
EI
VE
N
TR
AC
TI
N G
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
157 600-volt Wiring Test - Sec 26 20 00 E As required by Specification
158 Shop Drawings - Sec 26 24 16.00 40 E As required by Specification
159 Panelboards - Sec 26 24 16.00 40 E As required by Specification
160 Directory Card and Holder - Sec 26 24 16.00 40 E As required by Specification
161 Keys - Sec 26 24 16.00 40 E As required by Specification
162 Continuity Tests - Sec 26 24 16.00 40 E As required by Specification
163 Insulation Tests - Sec 26 24 16.00 40 E As required by Specification
164 Certificates - Sec 26 24 16.00 40 E As required by Specification
165 Manufacturer's instructions - Sec 26 24 16.00 40 E As required by Specification
166 Equipment - Section 31 00 00 E As required by Specification
167 Borrow Material - Section 31 00 00 E As required by Specification
168 Testing - Section 31 00 00 E As required by Specification
169 Testing - Section 31 00 00 E As required by Specification
170 Fertilizer - Section 32 92 23 E As required by Specification
171 Sod - Section 32 92 23 E As required by Specification
172 Installation Drawings - Section 33 30 00 E As required by Specification
173 Pipeline materials - Section 33 30 00 E As required by Specification
174 Reports - Section 33 30 00 E As required by Specification
175 Portland Cement - Section 33 30 00 E As required by Specification
176 Gaskets - Section 33 30 00 E As required by Specification
177 As-built Drawings - Section 33 30 00 E As required by
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual Specification Sections for detailed submittal requirements and instructions.