3_-_181605_Material_Submittals.xlsx
XLSX spreadsheet 30 KB Posted
- Attached to
- Repair Chiller, Cooling Tower and Controls Federal contract opportunity
- Solicitation number
- FA3020-18-R-0005
About this file
Material Submittal - XLS format
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VNVP 181605 | Repair Chiller, Cooling Tower, & Controls, B1080 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACTING OFFICER | |||||||||||||||
| NUMBER OF COPIES TO BE COMPLETED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | PRE CONSTRUCTION SUBMITTALS | SHOP DRAWINGS | PRODUCT DATA | SAMPLES / COLOR SELECTION | DESIGN DATA | TEST REPORTS | CERTIFICATES | MANUFACTURER'S INSTRUCTIONS | MANUFACTURER'S FIELD REPORTS | OPERATIONS AND MAITENANCE DATA | CLOSE OUT SUBMITTALS |
REQUIRED SUBMITTAL
DATE
| DATE RECEIVED IN CONTRACTING | DATE TO | |||||||||||||||
| CIVIL ENGINEER | RETURN SUSPENSE DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||||
| APPROVAL | REMARKS | |||||||||||||||
| SD-01 | SD-02 | SD-03 | SD-04 | SD-05 | SD-06 | SD-07 | SD-08 | SD-09 | SD-10 | SD-11 | APPROVED | DISAPPROVED | ||||
| 1 | *AF Form 103 - Sec 01 11 00 | E | As required by Specification | |||||||||||||
| 2 | Existing Damage - Sec 01 11 00 | E | As required by Specification | |||||||||||||
| 3 | Work Plan - Sec 01 11 00 | E | As required by Specification | |||||||||||||
| 4 | List of Contact Personnel - Sec 01 14 00 | E | Prior to start of any work | |||||||||||||
| 5 | Construction Schedule - Sec 01 32 16.00 20 | E | Within 10 days of NTP | |||||||||||||
| 6 | Accident Prevention Plan - Sec 01 35 26 | E | Within 10 days of NTP | |||||||||||||
| 7 | Activity Hazard Analysis - Sec 01 35 26 | E | Prior to start of any work | |||||||||||||
| 8 | Crane Critical Lift Plan - Sec 01 35 26 | E | Prior to start of any work | |||||||||||||
| 9 | Crane Operator Qualifications - Sec 01 35 26 | E | Prior to start of any work | |||||||||||||
| 10 | Accident Reports - Sec 01 35 26 | E | Prior to start of any work | |||||||||||||
| 11 | Crane Reports - Sec 01 35 26 | E | Prior to start of any work | |||||||||||||
| 12 | License Certificates - Sec 01 35 26 | E | As required by Specification | |||||||||||||
| 13 | Hazardous Material Documentation - Sec 01 35 26 | E | As required by Specification | |||||||||||||
| 14 | Site Survey - Sec 01 57 19.00 20 | E | As required by Specification | |||||||||||||
| 15 | Environmental Protection Plan - Sec 01 57 20.00 10 | E | As required by Specification | |||||||||||||
| 16 | Material Safety Data Sheets - Sec 01 57 20.00 10 | E | As required by Specification | |||||||||||||
| 17 | Waste Management Plan - Sec 01 74 19 | E | As required by Specification | |||||||||||||
| 18 | Warranty Binder - Sec 01 78 00 | 3 | As required by Specification | |||||||||||||
| 19 | Spare Parts Data - Sec 01 78 00 | E | As required by Specification | |||||||||||||
| 20 | Operation and Maintenance Manuals - Sec 01 78 00 | 3 | As required by Specification | |||||||||||||
| 21 | As-Built Drawings - Sec 01 78 00 | 3 | Prior to start of any work | |||||||||||||
| 22 | Record Drawings - Sec 01 78 00 | 3 | As required by Specification | |||||||||||||
| 23 | Final Approved Shop Drawings - Sec 01 78 00 | 3 | As required by Specification | |||||||||||||
| 24 | Form DD1354 - Sec 01 78 00 | E | As required by Specification | |||||||||||||
| 25 | Validation of Training Completion - Sec 01 78 23 | E | As required by Specification | |||||||||||||
| 26 | Welding Procedure Qualifications - Sec 05 05 23 | E | Prior to start of any work | |||||||||||||
| 27 | Welder, Welding Operator, and Tacker Qualifications - Sec 05 05 23 | E | Prior to start of any work | |||||||||||||
| 28 | Inspector Qualifications - Sec 05 05 23 | E | Prior to start of any work | |||||||||||||
| 29 | Pre-qualified Procedures - Sec 05 05 23 | E | Prior to start of any work | |||||||||||||
| 30 | Certified Welding Prodcedure Specifications - Sec 05 05 23 | E | As required by Specification | |||||||||||||
| 31 | Modification of Structural Members - Section 06 10 00 | E | As required by Specification | |||||||||||||
| 32 | Tapered roof insulation system - Section 07 22 00 | E | As required by Specification | |||||||||||||
| 33 | Asphalt - Section 07 22 00 | E | As required by Specification | |||||||||||||
| 34 | Insulation - Section 07 22 00 | E | As required by Specification | |||||||||||||
| 35 | Felts - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 36 | Granule Surface Modified Bitumen Cap Sheet - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 37 | Flashing membrane - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 38 | Fasteners - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 39 | Primer - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 40 | Aspahlt Roof Cement - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 41 | Walkpad Materials - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 42 | Cant Strips - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 43 | Pre-Manufactured Accessories - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 44 | Warranty - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 45 | Information Card - Section 07 51 13 | E | As required by Specification | |||||||||||||
| 46 | Covering on flat, sloped, or curved surfaces - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 47 | Gutters - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 48 | Downspouts - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 49 | Expansion Joints - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 50 | Gravel stops and fascias - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 51 | Splash pans - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 52 | Flashing for roof drains - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 53 | Base flashing - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 54 | Counter flashing - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 55 | Flashing at roof penentrations - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 56 | Reglets - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 57 | Scuppers - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 58 | Copings - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 59 | Drip edge - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 60 | Conductor heads - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 61 | Open valley flashing - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 62 | Eave flashing - Section 07 60 00 | E | As required by Specification | |||||||||||||
| 63 | Sealants - Section 07 92 00 | E | As required by Specification | |||||||||||||
| 64 | Primers - Section 07 92 00 | E | As required by Specification | |||||||||||||
| 65 | Bond breakers - Section 07 92 00 | E | As required by Specification | |||||||||||||
| 66 | Backstops - Section 07 92 00 | E | As required by Specification | |||||||||||||
| 67 | Product List - Sec 09 90 00 | E | Prior to start of any work | |||||||||||||
| 68 | Manufacturer's Data - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 69 | Fire Extinguishers - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 70 | Accessories - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 71 | Cabinets - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 72 | Wall Brackets - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 73 | Fire Extinguishers - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 74 | Accessories - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 75 | Cabinets - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 76 | Wall Brackets - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 77 | Manufacturer's Warranty w/Inspection Tag - Sec 10 44 16 | E | As required by Specification | |||||||||||||
| 78 | Pumps - Section 22 00 00 | E | As required by Specification | |||||||||||||
| 79 | Backflow Prevention Assemblies - Section 22 00 00 | E | As required by Specification | |||||||||||||
| 80 | Welding - Section 22 00 00 | E | As required by Specification | |||||||||||||
| 81 | Tests of Backflow Prevention Assemblies - Section 22 00 00 | E | As required by Specification | |||||||||||||
| 82 | Reduce Volatile Organic Compounds (VOC) for paint/coatings - Section 23 03 00.00 20 | E | As required by Specification | |||||||||||||
| 83 | Connection Diagrams - Section 23 05 15 | E | As required by Specification | |||||||||||||
| 84 | Installation Drawings - Section 23 05 15 | E | As required by Specification | |||||||||||||
| 85 | Hydrostatic Tests - Section 23 05 15 | E | As required by Specification | |||||||||||||
| 86 | Air Tests - Section 23 05 15 | E | As required by Specification | |||||||||||||
| 87 | Operation and Maintenance Manuals - Section 23 05 15 | E | As required by Specification | |||||||||||||
| 88 | TAB Firm - Section 23 05 93 | E | As required by Specification | |||||||||||||
| 89 | TAB Schematic Drawings and Report Forms - Section 23 05 93 | E | As required by Specification | |||||||||||||
| 90 | TAB Procedures - Section 23 05 93 | E | As required by Specification | |||||||||||||
| 91 | Certified Final TAB Report for Proportional Balancing - Section 23 05 93 | E | As required by Specification | |||||||||||||
| 92 | Certified Final TAB Report for Season 1 - Section 23 05 93 | E | As required by Specification | |||||||||||||
| 93 | Certified Final TAB Report for Season 2 - Section 23 05 93 | E | As required by Specification | |||||||||||||
| 94 | Pipe Insulation Systems and Associated Accessories - Section 23 07 00 | E | As required by Specification | |||||||||||||
| 95 | Equipment Insulation Systems and Associated Accessories - Section 23 07 00 | E | As required by Specification | |||||||||||||
| 96 | DDC Contractor Design Drawings - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 97 | Draft As-Built Drawings - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 98 | Final As-Built Drawings - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 99 | Programming Software - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 100 | Controller Application Programs - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 101 | Configuration Software - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 102 | Controller Configuration Settings - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 103 | Manufacturer's Product Data - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 104 | Start-Up Testing Report - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 105 | PVT Procedures - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 106 | PVT Report - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 107 | Operation and Maintenance (O&M) Instructions - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 108 | Training Documentation - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 109 | Enclosure Keys - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 110 | Password Summary Report - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 111 | Closeout Quality Control (QC) Checklist - Section 23 09 00 | E | As required by Specification | |||||||||||||
| 112 | Gas Piping System - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 113 | Pipe and Fittings - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 114 | Gas Equipment Connectors - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 115 | LPG Containers and Accessories - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 116 | Gas Piping System - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 117 | Pipe Coating Materials - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 118 | Pressure Regulators - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 119 | Risers - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 120 | Transition Fittings - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 121 | Valves - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 122 | Warning and Identification Tape - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 123 | Testing Report - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 124 | Pressure Tests Report - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 125 | Welders Procedures and Qualifications - Section 23 11 25 | E | As required by Specification | |||||||||||||
| 126 | Water Treatment System - Section 23 25 00 | E | As required by Specification | |||||||||||||
| 127 | Water Chiller - Section 23 64 10 | E | As required by Specification | |||||||||||||
| 128 | Water Chiller - Field Acceptance Test Report - Section 23 64 10 | E | As required by Specification | |||||||||||||
| 129 | Factory Tests - Section 23 64 10 | E | As required by Specification | |||||||||||||
| 130 | Water Chiller - Installation Instructions - Section 23 64 10 | E | As required by Specification | |||||||||||||
| 131 | Operation and Maintenance Manuals - Section 23 64 10 | E | As required by Specification | |||||||||||||
| 132 | Grooved Mechanical Connections For Steel - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 133 | Grooved Mechanical Connections For Copper - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 134 | Calibrated Balancing Valves - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 135 | Automatic Flow Control Valves - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 136 | Water Temperature Mixing Valve - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 137 | Water Temperature Regulating Valves - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 138 | Water Pressure Reducing Valve - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 139 | Pressure Relief Valve - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 140 | Combination Pressure and Temperature Relief Valves - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 141 | Expansion Joints - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 142 | Pumps - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 143 | Combination Strainer and Pump Suction Diffuser - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 144 | Expansion Tanks - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 145 | Air Separator Tanks - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 146 | Water Treatment Systems - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 147 | Pressure Tests Reports - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 148 | Welding Procedures and Qualifications - Section 23 64 26 | E | As required by Specification | |||||||||||||
| 149 | Installation Instructions - Sec 26 05 19.00 10 | E | As required by Specification | |||||||||||||
| 150 | Tests, Inspections, and Verifications - Sec 26 05 19.00 10 | E | As required by Specification | |||||||||||||
| 151 | Acceptance Tests and Inspections - Sec 26 08 00 | E | As required by Specification | |||||||||||||
| 152 | Qualifications of Organization and Lead Engineering Technician - Sec 26 08 00 | E | As required by Specification | |||||||||||||
| 153 | Acceptance Tests and Inspections Procedure - Sec 26 08 00 | E | As required by Specification | |||||||||||||
| 154 | Switches - Sec 26 20 00 | E | As required by Specification | |||||||||||||
| 155 | Enclosed Circuit Breakers - Sec 26 20 00 | E | As required by Specification | |||||||||||||
| 156 | Surge Protective Devices - Sec 26 20 00 | E | As required by Specification | |||||||||||||
| 157 | 600-volt Wiring Test - Sec 26 20 00 | E | As required by Specification | |||||||||||||
| 158 | Shop Drawings - Sec 26 24 16.00 40 | E | As required by Specification | |||||||||||||
| 159 | Panelboards - Sec 26 24 16.00 40 | E | As required by Specification | |||||||||||||
| 160 | Directory Card and Holder - Sec 26 24 16.00 40 | E | As required by Specification | |||||||||||||
| 161 | Keys - Sec 26 24 16.00 40 | E | As required by Specification | |||||||||||||
| 162 | Continuity Tests - Sec 26 24 16.00 40 | E | As required by Specification | |||||||||||||
| 163 | Insulation Tests - Sec 26 24 16.00 40 | E | As required by Specification | |||||||||||||
| 164 | Certificates - Sec 26 24 16.00 40 | E | As required by Specification | |||||||||||||
| 165 | Manufacturer's instructions - Sec 26 24 16.00 40 | E | As required by Specification | |||||||||||||
| 166 | Equipment - Section 31 00 00 | E | As required by Specification | |||||||||||||
| 167 | Borrow Material - Section 31 00 00 | E | As required by Specification | |||||||||||||
| 168 | Testing - Section 31 00 00 | E | As required by Specification | |||||||||||||
| 169 | Testing - Section 31 00 00 | E | As required by Specification | |||||||||||||
| 170 | Fertilizer - Section 32 92 23 | E | As required by Specification | |||||||||||||
| 171 | Sod - Section 32 92 23 | E | As required by Specification | |||||||||||||
| 172 | Installation Drawings - Section 33 30 00 | E | As required by Specification | |||||||||||||
| 173 | Pipeline materials - Section 33 30 00 | E | As required by Specification | |||||||||||||
| 174 | Reports - Section 33 30 00 | E | As required by Specification | |||||||||||||
| 175 | Portland Cement - Section 33 30 00 | E | As required by Specification | |||||||||||||
| 176 | Gaskets - Section 33 30 00 | E | As required by Specification | |||||||||||||
| 177 | As-built Drawings - Section 33 30 00 | E | As required by Specification | |||||||||||||
| NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual Specification Sections for detailed submittal requirements and instructions. |
FA4600-11-B-0025
Attachment 3 Page &P
* Items to be provided but not on an AF3000. &P of &N E - Electronic