About this file

Material Submittal - XLS format

View the file

Other files for this federal contract opportunity

Other files attached to Repair Chiller, Cooling Tower and Controls, newest first.
File Type Posted
B1080_Q&A_Clarification.pdf PDF
2_-_Switchboard_Elevation_Drawing.pdf PDF
1_-_Electrical_Drawing.pdf PDF
B1080_Q&A's.pdf PDF
Amendment_5.pdf PDF
Amendment_4_-_Extend_Proposal_Due_Date.pdf PDF
B1080_Site_Visit_sign-in_log.pdf PDF
Amendment_3.pdf PDF
Amendment_2.pdf PDF
FA3020-18-R-0005_Amendment_1.pdf PDF
FA3020-18-R-0005_Base_Map_Directions_to_Project.pdf PDF
12_-_Recovered_Materials_List.pdf PDF
4_-_181605_Asbestos_Report_-_FBPO.pdf PDF
5_-_Wage_Det_-_Bldg_-_TX180326_-_01-05-2018.pdf PDF
2_-_181605_Rpr_Chiller_Cooling_Twr_Ctrls_B1080_[24x36_FBPO]__Rev_1.pdf PDF
9_-_181605_Blank_Schedule_B.docx DOCX document
7_-_Base_Pass_Form_151.pdf PDF
2_-_181605_Rpr_Chiller_Cooling_Twr_Ctrls_B1080_[24x36_FBPO]_Rev_1.dwf DWF file
6_-_HAZMAT_Checklist.xfdl XFDL file
11_-_SF_LLL.pdf PDF
13_-_Past_and_Present_Performance_Questionaire_Sheet.docx DOCX document
3_-_181605_Material_Submittals.pdf PDF
8_-_Proposal_Detail_-_BLANK.xlsx XLSX spreadsheet
10_-_Background_Check_Requirements.docx DOCX document
1_-_181605_Specifications_-_FBPO_-_Rev_1.pdf PDF
+FA3020-18-R-0005_-_Solicitation.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
VNVP 181605Repair Chiller, Cooling Tower, & Controls, B1080
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACTING OFFICER
NUMBER OF COPIES TO BE COMPLETED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALPRE CONSTRUCTION SUBMITTALSSHOP DRAWINGSPRODUCT DATASAMPLES / COLOR SELECTIONDESIGN DATATEST REPORTSCERTIFICATESMANUFACTURER'S INSTRUCTIONSMANUFACTURER'S FIELD REPORTSOPERATIONS AND MAITENANCE DATACLOSE OUT SUBMITTALS

REQUIRED SUBMITTAL

DATE

DATE RECEIVED IN CONTRACTINGDATE TO
CIVIL ENGINEERRETURN SUSPENSE DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
SD-01SD-02SD-03SD-04SD-05SD-06SD-07SD-08SD-09SD-10SD-11APPROVEDDISAPPROVED
1*AF Form 103 - Sec 01 11 00EAs required by Specification
2Existing Damage - Sec 01 11 00EAs required by Specification
3Work Plan - Sec 01 11 00EAs required by Specification
4List of Contact Personnel - Sec 01 14 00EPrior to start of any work
5Construction Schedule - Sec 01 32 16.00 20EWithin 10 days of NTP
6Accident Prevention Plan - Sec 01 35 26EWithin 10 days of NTP
7Activity Hazard Analysis - Sec 01 35 26EPrior to start of any work
8Crane Critical Lift Plan - Sec 01 35 26EPrior to start of any work
9Crane Operator Qualifications - Sec 01 35 26EPrior to start of any work
10Accident Reports - Sec 01 35 26EPrior to start of any work
11Crane Reports - Sec 01 35 26EPrior to start of any work
12License Certificates - Sec 01 35 26EAs required by Specification
13Hazardous Material Documentation - Sec 01 35 26EAs required by Specification
14Site Survey - Sec 01 57 19.00 20EAs required by Specification
15Environmental Protection Plan - Sec 01 57 20.00 10EAs required by Specification
16Material Safety Data Sheets - Sec 01 57 20.00 10EAs required by Specification
17Waste Management Plan - Sec 01 74 19EAs required by Specification
18Warranty Binder - Sec 01 78 003As required by Specification
19Spare Parts Data - Sec 01 78 00EAs required by Specification
20Operation and Maintenance Manuals - Sec 01 78 003As required by Specification
21As-Built Drawings - Sec 01 78 003Prior to start of any work
22Record Drawings - Sec 01 78 003As required by Specification
23Final Approved Shop Drawings - Sec 01 78 003As required by Specification
24Form DD1354 - Sec 01 78 00EAs required by Specification
25Validation of Training Completion - Sec 01 78 23EAs required by Specification
26Welding Procedure Qualifications - Sec 05 05 23EPrior to start of any work
27Welder, Welding Operator, and Tacker Qualifications - Sec 05 05 23EPrior to start of any work
28Inspector Qualifications - Sec 05 05 23EPrior to start of any work
29Pre-qualified Procedures - Sec 05 05 23EPrior to start of any work
30Certified Welding Prodcedure Specifications - Sec 05 05 23EAs required by Specification
31Modification of Structural Members - Section 06 10 00EAs required by Specification
32Tapered roof insulation system - Section 07 22 00EAs required by Specification
33Asphalt - Section 07 22 00EAs required by Specification
34Insulation - Section 07 22 00EAs required by Specification
35Felts - Section 07 51 13EAs required by Specification
36Granule Surface Modified Bitumen Cap Sheet - Section 07 51 13EAs required by Specification
37Flashing membrane - Section 07 51 13EAs required by Specification
38Fasteners - Section 07 51 13EAs required by Specification
39Primer - Section 07 51 13EAs required by Specification
40Aspahlt Roof Cement - Section 07 51 13EAs required by Specification
41Walkpad Materials - Section 07 51 13EAs required by Specification
42Cant Strips - Section 07 51 13EAs required by Specification
43Pre-Manufactured Accessories - Section 07 51 13EAs required by Specification
44Warranty - Section 07 51 13EAs required by Specification
45Information Card - Section 07 51 13EAs required by Specification
46Covering on flat, sloped, or curved surfaces - Section 07 60 00EAs required by Specification
47Gutters - Section 07 60 00EAs required by Specification
48Downspouts - Section 07 60 00EAs required by Specification
49Expansion Joints - Section 07 60 00EAs required by Specification
50Gravel stops and fascias - Section 07 60 00EAs required by Specification
51Splash pans - Section 07 60 00EAs required by Specification
52Flashing for roof drains - Section 07 60 00EAs required by Specification
53Base flashing - Section 07 60 00EAs required by Specification
54Counter flashing - Section 07 60 00EAs required by Specification
55Flashing at roof penentrations - Section 07 60 00EAs required by Specification
56Reglets - Section 07 60 00EAs required by Specification
57Scuppers - Section 07 60 00EAs required by Specification
58Copings - Section 07 60 00EAs required by Specification
59Drip edge - Section 07 60 00EAs required by Specification
60Conductor heads - Section 07 60 00EAs required by Specification
61Open valley flashing - Section 07 60 00EAs required by Specification
62Eave flashing - Section 07 60 00EAs required by Specification
63Sealants - Section 07 92 00EAs required by Specification
64Primers - Section 07 92 00EAs required by Specification
65Bond breakers - Section 07 92 00EAs required by Specification
66Backstops - Section 07 92 00EAs required by Specification
67Product List - Sec 09 90 00EPrior to start of any work
68Manufacturer's Data - Sec 10 44 16EAs required by Specification
69Fire Extinguishers - Sec 10 44 16EAs required by Specification
70Accessories - Sec 10 44 16EAs required by Specification
71Cabinets - Sec 10 44 16EAs required by Specification
72Wall Brackets - Sec 10 44 16EAs required by Specification
73Fire Extinguishers - Sec 10 44 16EAs required by Specification
74Accessories - Sec 10 44 16EAs required by Specification
75Cabinets - Sec 10 44 16EAs required by Specification
76Wall Brackets - Sec 10 44 16EAs required by Specification
77Manufacturer's Warranty w/Inspection Tag - Sec 10 44 16EAs required by Specification
78Pumps - Section 22 00 00EAs required by Specification
79Backflow Prevention Assemblies - Section 22 00 00EAs required by Specification
80Welding - Section 22 00 00EAs required by Specification
81Tests of Backflow Prevention Assemblies - Section 22 00 00EAs required by Specification
82Reduce Volatile Organic Compounds (VOC) for paint/coatings - Section 23 03 00.00 20EAs required by Specification
83Connection Diagrams - Section 23 05 15EAs required by Specification
84Installation Drawings - Section 23 05 15EAs required by Specification
85Hydrostatic Tests - Section 23 05 15EAs required by Specification
86Air Tests - Section 23 05 15EAs required by Specification
87Operation and Maintenance Manuals - Section 23 05 15EAs required by Specification
88TAB Firm - Section 23 05 93EAs required by Specification
89TAB Schematic Drawings and Report Forms - Section 23 05 93EAs required by Specification
90TAB Procedures - Section 23 05 93EAs required by Specification
91Certified Final TAB Report for Proportional Balancing - Section 23 05 93EAs required by Specification
92Certified Final TAB Report for Season 1 - Section 23 05 93EAs required by Specification
93Certified Final TAB Report for Season 2 - Section 23 05 93EAs required by Specification
94Pipe Insulation Systems and Associated Accessories - Section 23 07 00EAs required by Specification
95Equipment Insulation Systems and Associated Accessories - Section 23 07 00EAs required by Specification
96DDC Contractor Design Drawings - Section 23 09 00EAs required by Specification
97Draft As-Built Drawings - Section 23 09 00EAs required by Specification
98Final As-Built Drawings - Section 23 09 00EAs required by Specification
99Programming Software - Section 23 09 00EAs required by Specification
100Controller Application Programs - Section 23 09 00EAs required by Specification
101Configuration Software - Section 23 09 00EAs required by Specification
102Controller Configuration Settings - Section 23 09 00EAs required by Specification
103Manufacturer's Product Data - Section 23 09 00EAs required by Specification
104Start-Up Testing Report - Section 23 09 00EAs required by Specification
105PVT Procedures - Section 23 09 00EAs required by Specification
106PVT Report - Section 23 09 00EAs required by Specification
107Operation and Maintenance (O&M) Instructions - Section 23 09 00EAs required by Specification
108Training Documentation - Section 23 09 00EAs required by Specification
109Enclosure Keys - Section 23 09 00EAs required by Specification
110Password Summary Report - Section 23 09 00EAs required by Specification
111Closeout Quality Control (QC) Checklist - Section 23 09 00EAs required by Specification
112Gas Piping System - Section 23 11 25EAs required by Specification
113Pipe and Fittings - Section 23 11 25EAs required by Specification
114Gas Equipment Connectors - Section 23 11 25EAs required by Specification
115LPG Containers and Accessories - Section 23 11 25EAs required by Specification
116Gas Piping System - Section 23 11 25EAs required by Specification
117Pipe Coating Materials - Section 23 11 25EAs required by Specification
118Pressure Regulators - Section 23 11 25EAs required by Specification
119Risers - Section 23 11 25EAs required by Specification
120Transition Fittings - Section 23 11 25EAs required by Specification
121Valves - Section 23 11 25EAs required by Specification
122Warning and Identification Tape - Section 23 11 25EAs required by Specification
123Testing Report - Section 23 11 25EAs required by Specification
124Pressure Tests Report - Section 23 11 25EAs required by Specification
125Welders Procedures and Qualifications - Section 23 11 25EAs required by Specification
126Water Treatment System - Section 23 25 00EAs required by Specification
127Water Chiller - Section 23 64 10EAs required by Specification
128Water Chiller - Field Acceptance Test Report - Section 23 64 10EAs required by Specification
129Factory Tests - Section 23 64 10EAs required by Specification
130Water Chiller - Installation Instructions - Section 23 64 10EAs required by Specification
131Operation and Maintenance Manuals - Section 23 64 10EAs required by Specification
132Grooved Mechanical Connections For Steel - Section 23 64 26EAs required by Specification
133Grooved Mechanical Connections For Copper - Section 23 64 26EAs required by Specification
134Calibrated Balancing Valves - Section 23 64 26EAs required by Specification
135Automatic Flow Control Valves - Section 23 64 26EAs required by Specification
136Water Temperature Mixing Valve - Section 23 64 26EAs required by Specification
137Water Temperature Regulating Valves - Section 23 64 26EAs required by Specification
138Water Pressure Reducing Valve - Section 23 64 26EAs required by Specification
139Pressure Relief Valve - Section 23 64 26EAs required by Specification
140Combination Pressure and Temperature Relief Valves - Section 23 64 26EAs required by Specification
141Expansion Joints - Section 23 64 26EAs required by Specification
142Pumps - Section 23 64 26EAs required by Specification
143Combination Strainer and Pump Suction Diffuser - Section 23 64 26EAs required by Specification
144Expansion Tanks - Section 23 64 26EAs required by Specification
145Air Separator Tanks - Section 23 64 26EAs required by Specification
146Water Treatment Systems - Section 23 64 26EAs required by Specification
147Pressure Tests Reports - Section 23 64 26EAs required by Specification
148Welding Procedures and Qualifications - Section 23 64 26EAs required by Specification
149Installation Instructions - Sec 26 05 19.00 10EAs required by Specification
150Tests, Inspections, and Verifications - Sec 26 05 19.00 10EAs required by Specification
151Acceptance Tests and Inspections - Sec 26 08 00EAs required by Specification
152Qualifications of Organization and Lead Engineering Technician - Sec 26 08 00EAs required by Specification
153Acceptance Tests and Inspections Procedure - Sec 26 08 00EAs required by Specification
154Switches - Sec 26 20 00EAs required by Specification
155Enclosed Circuit Breakers - Sec 26 20 00EAs required by Specification
156Surge Protective Devices - Sec 26 20 00EAs required by Specification
157600-volt Wiring Test - Sec 26 20 00EAs required by Specification
158Shop Drawings - Sec 26 24 16.00 40EAs required by Specification
159Panelboards - Sec 26 24 16.00 40EAs required by Specification
160Directory Card and Holder - Sec 26 24 16.00 40EAs required by Specification
161Keys - Sec 26 24 16.00 40EAs required by Specification
162Continuity Tests - Sec 26 24 16.00 40EAs required by Specification
163Insulation Tests - Sec 26 24 16.00 40EAs required by Specification
164Certificates - Sec 26 24 16.00 40EAs required by Specification
165Manufacturer's instructions - Sec 26 24 16.00 40EAs required by Specification
166Equipment - Section 31 00 00EAs required by Specification
167Borrow Material - Section 31 00 00EAs required by Specification
168Testing - Section 31 00 00EAs required by Specification
169Testing - Section 31 00 00EAs required by Specification
170Fertilizer - Section 32 92 23EAs required by Specification
171Sod - Section 32 92 23EAs required by Specification
172Installation Drawings - Section 33 30 00EAs required by Specification
173Pipeline materials - Section 33 30 00EAs required by Specification
174Reports - Section 33 30 00EAs required by Specification
175Portland Cement - Section 33 30 00EAs required by Specification
176Gaskets - Section 33 30 00EAs required by Specification
177As-built Drawings - Section 33 30 00EAs required by Specification
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual Specification Sections for detailed submittal requirements and instructions.

FA4600-11-B-0025

Attachment 3 Page &P

* Items to be provided but not on an AF3000. &P of &N E - Electronic