Cost breakdown sheet.xls

XLS spreadsheet 481 KB Posted

Attached to
Multiple Award Construction Contract IDIQ Award Notice
Solicitation number
FA3020-12-R-0003
Issued by

About this file

Attachment 17 Construction Cost Estimate Breakdown in Excel

View the file

Other files

File Type Posted
Signed Delivery Information Sheet.pdf PDF
MACC Amend 4 RFIs.pdf PDF
MACC Amendment 4.doc DOC document
Amendment 4 --Attachment A B Sketches.pdf PDF
Cost breakdown sheet.xls XLS spreadsheet
MACC Amendment 3.doc DOC document
Sign-In Sheet Site Visit 2 May 2012.pdf PDF
MACC Amend 3 RFIs.pdf PDF
Sign-In Sheet Site Visit 2 May 2012.pdf PDF
MACC Amend 3 RFIs.pdf PDF
MACC Amendment 3.doc DOC document
B2013 Asbuilt 5 of 8.pdf PDF
Site Visit Sign In Sheet.pdf PDF
B2013 Asbuilt 4 of 8.pdf PDF
B2013 Asbuilt 7 of 8.pdf PDF
B2013 Asbuilt 6 of 8.pdf PDF
Pre-Proposal Conference Sign In Sheet.pdf PDF
MACC Information Sheet- Amendment 2.pdf PDF
B2013 Asbuilt 1 of 8.pdf PDF
B2013 Asbuilt 2 of 8.pdf PDF
Pre-Proposal Conference Slides-MACC.ppt PPT presentation
B2013 Asbuilt 8 of 8.pdf PDF
Amendment 2- MACC.doc DOC document
B2013 Asbuilt 3 of 8.pdf PDF
Amendment 1- MACC Solicitation.doc DOC document
PDF 1 - 111089 Sheets 01-16.pdf PDF
PDF 5 - 111089 Sheets 35-43.pdf PDF
PDF 6 - 111089 Sheets 44-49.pdf PDF
PDF 4 - 111089 Sheets 28-34.pdf PDF
PDF 3 - 111089 Sheet 23-26.pdf PDF
PDF 2 - 111089 Sheet 17-22.pdf PDF
3. Base Pass Forms.docx DOCX document
8. TX120035- Grayson WD Highway.pdf PDF
1.General Requirements.doc DOC document
12. Specifications for Project VNVP 111089.pdf PDF
5. TX120012- Wichita WD Heavy and Highway.pdf PDF
15. Sample Project Material Submittal Sheet VNVP 111089.pdf PDF
13. Drawings for VNVP 111089.dwf DWF file
2. Disclosure of Lobbying Activities.pdf PDF
14. Schedule B for VNVP 111089.pdf PDF
4. TX120268- Wichita WD Building.pdf PDF
11. OK120049- Tillman WD Highway.pdf PDF
16. Asbestos Report for VNVP 111089.pdf PDF
18. Phasing Plan VNVP 111089.pdf PDF
Past Performance Questionnaire —
6. TX120006- Grayson WD Building.pdf PDF
7. TX120085- Grayson WD Heavy.pdf PDF
Sheppard AFB MACC Solicitation- FA3020-12-R-0003.doc DOC document
10. OK120021- Tillman WD Heavy.pdf PDF
17. Cost Estimate Breakdown.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mech

TOTAL
*Total Material Costs
*Total Labor Costs
*Total Other Direct Costs
* SUBTOTAL$
*Contractor's Overhead
* Contractor's Profit$
* Contractor's Bond$
* TOTAL UNIT COST$

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR:

ADDRESS:

Roberto Huezo, 82 CES/CEOEE

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Bldg. 2418

LINE

NO.

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

[4]

TOTAL

[5]

MANHOURS

MANDAYS

[6]

AVERAGE

RATE

[7]

[8]

OTHER

DIRECT

COSTS

[9]

LINE

[10]

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR:

ADDRESS:

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Various Facilities

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR: GOVERNMENT ESTIMATE

ADDRESS: 82 CES/CECC, 231 9TH AVENUE, SHEPPARD AFB TX 76311-3333

DATE: JUN 02

CONTRACT FOR (Work to be performed) : INSTALL HEATERS, BUILDING 2418

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION BUILDING 2418

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR:

ADDRESS:

Roberto Huezo, 82 CES/CEOEE

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Bldg. 2418

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR:

ADDRESS:

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Various Facilities

LINE

MEASURE

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR:

ADDRESS:

DATE:

CONTRACT FOR (Work to be performed) :

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION:

Repair Sidewalks on Hatcher & Childress

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

Distribution

TOTAL
1Excavation trench, 4 to 6 ft deepCY715$ 2.29$ 1,637.35$ 200.00$ 1,837.35
2Backfill by handCY$ - 0230$ 14.10$ 3,243.00$ - 0$ 3,243.00
36" Layers, compactionCY$ - 0360$ 9.35$ 3,366.00$ 3,366.00
4Utility bedding sand, compactedCY360$ 3.93$ 1,414.80360$ 6.48$ 2,332.80$ 3,747.60
5Gravel fill, 4"SF2860$ 0.16$ 457.602860$ 0.14$ 400.40$ 858.00
6HydromulchMSF200$ 18.25$ 3,650.00200$ 8.30$ 1,660.00$ 5,310.00
78" Pre Insulated, 2" thck insulationLF2540$ 130.80$ 332,232.002540$ 52.74$ 133,959.60$ 466,191.60
84" Pre Insulated, 2" thck insulationLF1320$ 60.00$ 79,200.001320$ 30.67$ 40,484.40$ 119,684.40
9Fitting, 90, 8"EA8$ 1,225.00$ 9,800.008$ 305.00$ 2,440.00$ 12,240.00
10Fitting, 90, 4"EA12$ 581.00$ 6,972.0012$ 197.00$ 2,364.00$ 9,336.00
11Fitting, 45, 8"EA8$ 980.00$ 7,840.008$ 305.00$ 2,440.00$ 10,280.00
12Reducing Tee,EA4$ 1,666.00$ 6,664.004$ 397.00$ 1,588.00$ 8,252.00
13Valve, 8"EA6$ 298.00$ 1,788.006$ 216.00$ 1,296.00$ 3,084.00
14Valve, 4"EA4$ 214.00$ 856.004$ 120.00$ 480.00$ 1,336.00
15LF$ - 0$ - 0$ - 0$ - 0$ - 0
16Utility boring, incl 24" casing 1/2" wllLF400$ 67.00$ 26,800.00400$ 149.50$ 59,800.00$ 86,600.00
17Marking Tape 1k ft. Roll w/ TracerEA3$ 122.40$ 367.200$ - 0$ 367.20
18$ - 00$ 10.20$ - 0$ - 0
19Thrustblocks, concrete stabilizedEA0$ 29.58$ - 00$ 35.00$ - 0$ - 0
20Pipe DemolitionLF$ - 0$ - 0$ - 0
21Temporary FencingLF$ - 0$ - 0$ 500.00$ 500.00
$ 478,041.60$ 257,491.55$ 700.00$ 736,233.15
* SUBTOTAL$ 736,233.15
* Overhead 15%$ 110,434.97
* SUB O&P 10%$ 84,666.81
* GRAND TOTAL PROJECT$ 931,334.93
$ - 0$ - 0$ - 0
Division 10 Total

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR:

ADDRESS:

Roberto Huezo, 82 CES/CEOEE

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Bldg. 2418

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR:

ADDRESS:

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Various Facilities

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR: GOVERNMENT ESTIMATE

ADDRESS: 82 CES/CECC, 231 9TH AVENUE, SHEPPARD AFB TX 76311-3333

DATE: Feb 2006 Roberto Huezo 6-7470 CONTRACT FOR (Work to be performed) : VNVP 041092 - Repalce HVAC system B1950

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION BUILDING 1951,1950,1927

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

File details come from the government source that posted it. Updated .