Cost breakdown sheet.xls

XLS spreadsheet 481 KB Posted

Attached to
Multiple Award Construction Contract IDIQ Award Notice Federal contract opportunity
Solicitation number
FA3020-12-R-0003
Issued by
Department of the Air Force Air Education and Training Command

About this file

Attachment 17 Construction Cost Breakdown Sheet in Excel format

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Construction Contract IDIQ Award Notice, newest first.
File Type Posted
Signed Delivery Information Sheet.pdf PDF
Amendment 4 --Attachment A B Sketches.pdf PDF
MACC Amend 4 RFIs.pdf PDF
MACC Amendment 4.doc DOC document
Sign-In Sheet Site Visit 2 May 2012.pdf PDF
MACC Amend 3 RFIs.pdf PDF
MACC Amendment 3.doc DOC document
Sign-In Sheet Site Visit 2 May 2012.pdf PDF
MACC Amend 3 RFIs.pdf PDF
Cost breakdown sheet.xls XLS spreadsheet
MACC Amendment 3.doc DOC document
MACC Information Sheet- Amendment 2.pdf PDF
B2013 Asbuilt 8 of 8.pdf PDF
Amendment 2- MACC.doc DOC document
B2013 Asbuilt 3 of 8.pdf PDF
B2013 Asbuilt 5 of 8.pdf PDF
B2013 Asbuilt 6 of 8.pdf PDF
Pre-Proposal Conference Sign In Sheet.pdf PDF
B2013 Asbuilt 2 of 8.pdf PDF
Pre-Proposal Conference Slides-MACC.ppt PPT presentation
Site Visit Sign In Sheet.pdf PDF
B2013 Asbuilt 4 of 8.pdf PDF
B2013 Asbuilt 7 of 8.pdf PDF
PDF 4 - 111089 Sheets 28-34.pdf PDF
PDF 1 - 111089 Sheets 01-16.pdf PDF
PDF 2 - 111089 Sheet 17-22.pdf PDF
Amendment 1- MACC Solicitation.doc DOC document
PDF 6 - 111089 Sheets 44-49.pdf PDF
PDF 5 - 111089 Sheets 35-43.pdf PDF
PDF 3 - 111089 Sheet 23-26.pdf PDF
15. Sample Project Material Submittal Sheet VNVP 111089.pdf PDF
14. Schedule B for VNVP 111089.pdf PDF
18. Phasing Plan VNVP 111089.pdf PDF
6. TX120006- Grayson WD Building.pdf PDF
12. Specifications for Project VNVP 111089.pdf PDF
5. TX120012- Wichita WD Heavy and Highway.pdf PDF
3. Base Pass Forms.docx DOCX document
17. Cost Estimate Breakdown.pdf PDF
Sheppard AFB MACC Solicitation- FA3020-12-R-0003.doc DOC document
7. TX120085- Grayson WD Heavy.pdf PDF
9. OK120014- Tillman WD Building.pdf PDF
10. OK120021- Tillman WD Heavy.pdf PDF
13. Drawings for VNVP 111089.dwf DWF file
1.General Requirements.doc DOC document
8. TX120035- Grayson WD Highway.pdf PDF
2. Disclosure of Lobbying Activities.pdf PDF
4. TX120268- Wichita WD Building.pdf PDF
11. OK120049- Tillman WD Highway.pdf PDF
16. Asbestos Report for VNVP 111089.pdf PDF
Past Performance Questionnaire —
Show all 50

Multiple Award Construction Contract IDIQ Award Notice has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mech

TOTAL
*Total Material Costs
*Total Labor Costs
*Total Other Direct Costs
* SUBTOTAL$
*Contractor's Overhead
* Contractor's Profit$
* Contractor's Bond$
* TOTAL UNIT COST$

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR:

ADDRESS:

Roberto Huezo, 82 CES/CEOEE

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Bldg. 2418

LINE

NO.

ITEM

(1)

UNIT OF

MEASURE

(2)

QUANTITY

(3)

UNIT

[4]

TOTAL

[5]

MANHOURS

MANDAYS

[6]

AVERAGE

RATE

[7]

[8]

OTHER

DIRECT

COSTS

[9]

LINE

[10]

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR:

ADDRESS:

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Various Facilities

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR: GOVERNMENT ESTIMATE

ADDRESS: 82 CES/CECC, 231 9TH AVENUE, SHEPPARD AFB TX 76311-3333

DATE: JUN 02

CONTRACT FOR (Work to be performed) : INSTALL HEATERS, BUILDING 2418

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION BUILDING 2418

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR:

ADDRESS:

Roberto Huezo, 82 CES/CEOEE

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Bldg. 2418

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR:

ADDRESS:

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Various Facilities

LINE

MEASURE

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR:

ADDRESS:

DATE:

CONTRACT FOR (Work to be performed) :

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION:

Repair Sidewalks on Hatcher & Childress

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

Distribution

TOTAL
1Excavation trench, 4 to 6 ft deepCY715$ 2.29$ 1,637.35$ 200.00$ 1,837.35
2Backfill by handCY$ - 0230$ 14.10$ 3,243.00$ - 0$ 3,243.00
36" Layers, compactionCY$ - 0360$ 9.35$ 3,366.00$ 3,366.00
4Utility bedding sand, compactedCY360$ 3.93$ 1,414.80360$ 6.48$ 2,332.80$ 3,747.60
5Gravel fill, 4"SF2860$ 0.16$ 457.602860$ 0.14$ 400.40$ 858.00
6HydromulchMSF200$ 18.25$ 3,650.00200$ 8.30$ 1,660.00$ 5,310.00
78" Pre Insulated, 2" thck insulationLF2540$ 130.80$ 332,232.002540$ 52.74$ 133,959.60$ 466,191.60
84" Pre Insulated, 2" thck insulationLF1320$ 60.00$ 79,200.001320$ 30.67$ 40,484.40$ 119,684.40
9Fitting, 90, 8"EA8$ 1,225.00$ 9,800.008$ 305.00$ 2,440.00$ 12,240.00
10Fitting, 90, 4"EA12$ 581.00$ 6,972.0012$ 197.00$ 2,364.00$ 9,336.00
11Fitting, 45, 8"EA8$ 980.00$ 7,840.008$ 305.00$ 2,440.00$ 10,280.00
12Reducing Tee,EA4$ 1,666.00$ 6,664.004$ 397.00$ 1,588.00$ 8,252.00
13Valve, 8"EA6$ 298.00$ 1,788.006$ 216.00$ 1,296.00$ 3,084.00
14Valve, 4"EA4$ 214.00$ 856.004$ 120.00$ 480.00$ 1,336.00
15LF$ - 0$ - 0$ - 0$ - 0$ - 0
16Utility boring, incl 24" casing 1/2" wllLF400$ 67.00$ 26,800.00400$ 149.50$ 59,800.00$ 86,600.00
17Marking Tape 1k ft. Roll w/ TracerEA3$ 122.40$ 367.200$ - 0$ 367.20
18$ - 00$ 10.20$ - 0$ - 0
19Thrustblocks, concrete stabilizedEA0$ 29.58$ - 00$ 35.00$ - 0$ - 0
20Pipe DemolitionLF$ - 0$ - 0$ - 0
21Temporary FencingLF$ - 0$ - 0$ 500.00$ 500.00
$ 478,041.60$ 257,491.55$ 700.00$ 736,233.15
* SUBTOTAL$ 736,233.15
* Overhead 15%$ 110,434.97
* SUB O&P 10%$ 84,666.81
* GRAND TOTAL PROJECT$ 931,334.93
$ - 0$ - 0$ - 0
Division 10 Total

CONSTRUCTION COST ESTIMATE BREAKDOWN

CONTRACTOR:

ADDRESS:

Roberto Huezo, 82 CES/CEOEE

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Bldg. 2418

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR:

ADDRESS:

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION Various Facilities

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

CONTRACTOR: GOVERNMENT ESTIMATE

ADDRESS: 82 CES/CECC, 231 9TH AVENUE, SHEPPARD AFB TX 76311-3333

DATE: Feb 2006 Roberto Huezo 6-7470 CONTRACT FOR (Work to be performed) : VNVP 041092 - Repalce HVAC system B1950

PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER:

MATERIAL COST

LABOR COST

WORK LOCATION BUILDING 1951,1950,1927

LINE

MEASURE

MANDAYS

[6]

AVERAGE

RATE

DIRECT

COSTS

[9]

File details come from the government source that posted it. Updated .