Construction Cost Estimate Worksheet.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- FA301626R0018
About this file
This is a Construction Cost Estimate Worksheet template designed for contractors to submit detailed pricing for construction projects. The blank form is structured to capture comprehensive cost breakdowns across multiple line items and divisions, with separate columns for material costs, labor costs, and equipment costs. Contractors must itemize work by division and line number, with each line showing individual costs and line totals that roll up to provide a total project amount.
The worksheet includes sections for calculating indirect costs and markups applied to the general construction subtotal, including labor burden, subcontractor overhead, subcontractor profit, prime contractor overhead, prime contractor profit, and prime contractor bonding—each expressed as a percentage and corresponding dollar amount. The form also requires identification of the contractor address, project number, work location, and the period of performance in days. All values in the provided template are currently zero, indicating this is a blank form awaiting completion by contractors bidding on the Design-Build repair project for Multi-Service Troop Facility B2263 at an Air Force installation under solicitation FA301626R0018.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Details
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| General Construction Subtotal | $0.00 | |||||
| General Construction Labor Burden | 0.00% | $0.00 | ||||
| . | $0.00 | |||||
| General Construction Subcontractor Overhead | 0.00% | $0.00 | ||||
| General Construction Subcontractor Profit | 0.00% | $0.00 | ||||
| General Construction Prime Contractor Overhead | 0.00% | $0.00 | ||||
| General Construction Prime Contractor Profit | 0.00% | $0.00 | ||||
| General Construction Prime Contractor Bonding | 0.00% | $0.00 | ||||
| . | 0.00% | $0.00 | ||||
| CONTRACT FOR (Work to be performed) | Proposed Project Amount | $0.00 | ||||
| The period of performance to perform this work is ___________ days. | ||||||
| PROJECT NUMBER | WORK LOCATION |
| LINE | ||||||
| NO. | ITEM DESCRIPTION | TOTAL MATERIAL COSTS | TOTAL LABOR COSTS | TOTAL EQUIPMENT COSTS | LINE |
TOTAL
| TOTAL | TOTAL | TOTAL | ||||
| Division 1 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| Division 2 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
File details come from the government source that posted it. Updated .