FA301625Q6153 Questions and Answers Amend 003.pdf
PDF 36 KB Posted
- Attached to
- CAC Readers and Cameras
- Solicitation number
- FA301625Q6153
About this file
This document is a Questions and Answers (Q&A) amendment for a federal solicitation (FA301625Q6153) for CAC readers and surveillance camera installation at Building 743, JBSA Randolph. The Q&A covers 27 detailed questions addressing technical specifications, equipment requirements, and installation parameters. Key details include the requirement for a Hirsch panel, 30-day surveillance footage retention, 8-hour power backup, and mandatory removal of existing cameras. The government seeks a contractor capable of installing Axis cameras (M4215-LV and P4705PLVE), HID readers, and integrating with existing systems, with a strong preference for Streamvault SV-2000E for video recording.
Critical technical and procedural requirements include: contractors must be able to work on Hirsch systems, use FIPS 201 compliant readers, provide all necessary hardware like switches and patch panels, and coordinate site access with 24-hour advance notice. The CAC readers will be installed on exterior glass doors, with enrollment and access during non-duty hours. Multi-lens cameras are acceptable, and while Velocity software is encouraged, it is not mandatory if alternative software meets the government's surveillance and access control intent. The quote due date is extended to 6 August 2025 at 2:00 PM CT, with no further extensions or questions accepted.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA301625Q6153
Amend 003
Questions and Answers
New information is highlighted.
Q1. Please confirm the exact number and placement of Axis M4215-LV and P4705PLVE cameras required, or provide a site plan indicating coverage areas.
A1. See diagram for planned coverage areas. The coverage areas are the priority, not necessarily the number of cameras. In some areas on the diagram, it may look like one camera could suffice for 3 look angles (ex. 2 hallways meeting to form a 90 degree angle and the entry/exit doorway at their intersection). However, the ceiling dips in places, typically the beginning of a hallway, which may make a single camera for all 3 look angles difficult.
Q2. Will the Government provide programming access/credentials for integrating new readers with the existing Hirsch controller?
A2. We’re expecting contractors to have the credentials to work on Hirsch systems. If there’s a digital permission or access we need to arrange for a qualified contractor to be able to do the work, we’ll work with the contractor to get them squared away.
Q3. Are there existing system schematics or panel locations available for contractor review?
A3. There is an existing Hirsch M8 panel in a small room where we plan to house the credential system and any other key equipment on the new system. I’m unsure what’s meant by “contractor review” besides coming on a site visit.
Q4. Is the Government requiring Streamvault SV-2000E specifically, or will other manufacturers with equivalent storage and features be acceptable?
A4. Streamvault SV-2000E is a preference, not a requirement.
Q5. Please confirm if the rack and monitor are existing or must be supplied new.
A5. The rack is existing, the monitor must be supplied new.
Q6. Are there existing rack spaces and dedicated circuits for the server and UPS?
A6. Yes, in the room where the existing rack and Hirsch Panel are stored. The Hirsch M8 panel houses a 24V battery. Below the panel on the wall is an Altronix Al600ULACM Access Power Controller with Power Supply. Within that controller is an UltraTech battery. There is a Honeywell Power Supply box mounted near / connecting to the rack. It cautions of high voltage under the panel and says to disconnect before servicing.
Q7. Is sizing for the UPS determined by the contractor, or is there a required minimum VA rating?
A7. Determined by the contractor.
Q8. For CAC readers being disposed of off-site, are there specific Government documentation or chain-of-custody requirements?
A8. Change of plans that will be reflected on the SOW. The old, removed CAC readers will be left in the possession of the security personnel within Bldg 743. They will process disposal.
Q9. Are there documented acceptance test procedures or checklists the Government will use for final inspection?
A9. There is no official documented checklist. We will plan to conduct testing IAW the SoW lines 1D and 1H.
Q10. How long is the duration of power required to provide if there is a power outage?
A10. 8 hours.
Q11. Is Randolph AFB providing all switches and patch panels or does installer need to provide?
A11. Installer will provide all hardware, switches, and patch panels for the newly installed CAC readers.
Q12. If an installer is to provide Switch and Patch Panels, what is the standard to use? (i.e.
Dell).
A12. No standard or special preference. As long as it works with the HID Signo Readers listed in the SoW and the Hirsch M8 Panel, it works for us.
Q13. Is Genetec or Hirsch System Support Agreement in place?
A13. None that we’re tracking.
Q14. What brand are the existing cameras?
A14. Most are Honeywell dome cameras. 2 dormant cameras are older, larger, and of different brands from what I can tell. One is GVI, one is Costar.
Q15. Should all the cameras be removed even if it doesn’t impede the location of the new cameras?
A15. Yes.
Q16. What is the required retention period for recorded surveillance footage (e.g., 30 days, 60 days, etc.)?
A16. 30 days.
Q17. If access is needed to any sensitive or actively used areas during installation, how much advance notice should be provided to coordinate entry?
A17. Plan for 24 hours. If the time spent in the room is relatively short, i.e. 30 mins or less, we can probably make it happen the same day as the notice. Anything longer than that we may need the day of notice to coordinate with the people who work in the room in question.
We reserve the right to temporarily suspend work in a classroom for the sake of training.
Q18: Will the New CAC reader with cable and locking hardware (labeled on diagram) be installed on the exterior glass doors or the interior brown doors inside the foyer?
A18: Exterior glass doors.
Q19: Is the new HID reader being installed how it looks on the diagram, in the office with the rack and panel, or on the wall in the hallway next to the secure doors?
A19: Same location as the existing HID reader in the hallway next to the blue secure doors.
Q20: Will there be a CAC or HID reader installed on the doors leading into the room where the panel, rack, and surveillance equipment are stored?
A20: No. That room will continue to be secured with physical locks and keys.
Q21. Will the government confirm that the Hirsch panels and velocity system is a requirement?
A21. A Hirsch panel is a requirement. Velocity is not a requirement if there’s another program capable of integrating with Hirsch panels that meets our surveillance and scanner intent.
Q22. Will the government confirm that CAC's are exclusively used for enrollment into the access control system?
A22. I’m not sure I understand this question. CACs will be used for enrollment into the system and then used every time an enrolled member is accessing the building during non-duty hours. We’re not planning for any other method of enrollment into the system or for dual-factor authentication, like entering a PIN, when a member enters the building.
Q23. Will the government confirm if multi-lenses cameras are acceptable for use in the CCTV system?
A23. They are acceptable. The intent is to meet desired look angles. Whether we do that with 1 camera or multiple doesn’t matter. We will warn, though, that dips in the ceilings at the intersections of certain hallways may make this difficult.
Q24. Will the government confirm that the contractor will need to be a Hirsch Certified Dealer in good standing and Technicians need to be certified with Velocity?
A24. We’re keeping the same Hirsch panel, so, yes. We need the contractor to be able to work on our Hirsch system. If that counts as being a certified dealer in good standing, then yes. Velocity software is encouraged but not necessarily required if a different software meets our intent and keeps us off AFNet.
Q25. Will the government confirm that a current CSIEP Certification is required for GSA FIPS 201 implementation?
A25. We expect the contractor to be fully qualified to install the equipment chosen from
FIPS 201.
Q26. Will the government confirm that camera types, NVR, and reader types are suggestions and that comparable equipment that meets requirements can be used?
A26. Camera types are suggestions, but we highly encourage working with what’s listed on the SOW. I assume NVR means network video recorder? If so, we strongly prefer the Streamvault SV-2000E. Reader types must comply with FIPS 201:
https://www.idmanagement.gov/fips201/. We strongly suggest using the products listed in the SOW.
Q27. Will the government confirm if integration of the CCTV and Access Control system is desired (I.E. CCTV views show in Velocity)?
A27. We don’t necessarily need these two things to integrate. We need the CCTV footage to go into (preferably) the Streamvault SV-2000E or equal “DVR” server. We were under the impression that the CAC system is separate.
File details come from the government source that posted it. Updated .