Modular BLDG QA.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- FA301625Q6141
About this file
The document is a Questions and Answers (Q&A) spreadsheet for a modular building site visit related to a Department of the Air Force solicitation (FA301625Q6141) at JBSA. The Q&A covers critical project details including site logistics, construction specifications, and performance requirements. Key points include: the modular building will be housed inside Hanger 74, exposed to varying environmental conditions; 502 TDS will handle power disconnection and reconnection; the contractor is responsible for material offloading and dumpster management.
Specific project specifications include gray interior and exterior panel colors, no recycling requirements for the existing building, and a 90-day completion timeline after contract award. Additional technical details address fire alarm systems (to be handled by 502 TDS), preventative maintenance (not required), and site-specific logistical considerations. The solicitation is for commercial items and requires offerors to be registered in SAM, with proposals being requested directly through this combined synopsis/solicitation without a separate written solicitation to be issued.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Modular BLDG Site Visit Q&A | ||
| Questions | Answer | |
| 1 | Are these panels for interior or exterior use? | The Modular building will be housed inside of hanger 74 it will be exposed to heat,cold, humidity, dust |
| 2 | Who is responsible for disconnecting power to the existing building? | 502 TDS will disconnect power. |
| 3 | Who is responsible for bringing power to the new building? | 502 TDS will reconnect power. |
| 4 | Who is responsible for the dumpsters? | Contractor is responsible for dumpster. |
| 5 | Will the government offload the materials? | No contractor will off load materials. |
| 6 | SOW Page 2. Section 3.1 Is there a particular fire alarm notification device spec you are looking for? Do you require horns, strobes or monitoring? | 502 TDS will hire an Alarm service. |
| 7 | SOW Page 3 Section 4.4 references Attachment 3 for a drawing. Are there alternate drawings to share beyond what is provided in Attachment 1? | no |
| 8 | Page 5 Section 4.7 Waste Removal. Please clarify if it is required to recycle the existing building under these guidelines, or if demolition and removal is satisfactory. | Does not need to be recyled. |
| 9 | Page 6. Section 5.1 Travel. Please clarify what is expected here? Typically, preventative maintenance would be performed by owner. Does the government want a firm fixed price for preventive maintenance services? | A Preventative maintence contract is not needed, |
| 10 | Page 4. Section 4.6 Paint, Stain and Color. Will the government accept alternate neutral colors such as white, tan, yellow instead of gray? | the color will be gray for inside and outside panels. |
| 11 | Please provide the expected period of performance for completion after award. | Completion of building shall be completed no later than 90 days after award. |
| 12 | ||
| 13 | ||
| 14 | ||
| 15 |